• Title/Summary/Keyword: Maintenance Capacity

Search Result 907, Processing Time 0.028 seconds

Evaluation of Train Overhaul Maintenance Capacity for Rolling Stock Depot Using Computer Simulation Method (시뮬레이션 기법을 활용한 열차 차량기지의 중정비 검수 용량 평가)

  • Jang, Seong-Young;Jeon, Byoung-Hack;Lee, Won-Young;Yoo, Jae-Kyun
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.231-242
    • /
    • 2007
  • As railroad industry faces the new Renaissance era, effective and efficient maintenance methods for rolling stock operation are required with advanced railroad technology. All kinds of railroad systems such as high-speed long-distance train, metropolitan mass transit and light rail require systematic maintenance technology in order to maintain the safe railroad operation. Simulation models for regular operations of the example maintenance center are developed. In this study, standard maintenance procedures, layout, equipments, and number of workers of Siheung Metropolitan Railroad Maintenance Rolling Stock Depot are considered. The proposed simulation models are developed using simulation package ARENA. After simulation, four types of observations are analyzed. First, the bottleneck operation is identified. Second, the relationship between maintenance center size, number of workers and cycle time is analyzed. Third, the scheduling performances between PERT/CPM and Critical Chain Project Management(CCPM) are compared. Lastly, the simulation results according to worker's working coverage shows expanding the worker's coverage decreases the cycle time and increases throughput per train. However, workers are to be fully trained to do multiple skill work.

Evaluation on Flexural Capacity of Reinforced Concrete Beams with Ultra-High Performance Cementitious Composites (UHPCC를 사용한 철근 콘크리트 보의 휨강도 평가)

  • Kang, Su-Tae;Park, Jung-Jun;Koh, Gyung-Taek;Kim, Sung-Wook
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.5
    • /
    • pp.81-90
    • /
    • 2008
  • This paper concerns the flexural capacity of reinforced concrete beams with ultra-high performance cementitious composites(UHPCC). It was investigated if the existing equations to estimate the flexural capacity of reinforced fiberous concrete beams are applicable with the experiments including lightly reinforced concrete beams. The reinforcing effect when the steel fiber reinforced concrete was used in beams was also estimated. The results showed that the equation to predict the flexural capacity of reinforced steel fiber concrete by ACI 544 committee didn't have a good agreement with the test results and underestimated the flexural capacity in especially lightly reinforced beams with under 1.5% reinforcement ratio. the enhancement of flexural capacity was quite considerable in lightly reinforced beams when the steel fiber reinforced concrete was used. A equation to predict the reinforcing effect of steel fiber in reinforced steel fiber beams was developed. the equation was proposed as a function of both the characteristics of steel fiber and reinforcement ratio.

Effect of infiltration/inflow by rainfall for sewerage facilities in the area with partially separate sewer system (불완전 분류식 하수처리구역의 강우에 의한 하수도시설의 침입수/유입수 영향 분석)

  • Shin, Jungsub;Han, Sangwon;Yook, Junsu;Lee, Chungu;Kang, Seonhong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.33 no.3
    • /
    • pp.177-190
    • /
    • 2019
  • The purpose of this study was to analyze the effects of sewerage facilities through I/I analysis by rainfall by selecting areas where storm overflow diverging chamber is remained due to the non-maintenance drainage equipment when the sewerage system was reconstructed as a separate sewer system. Research has shown that wet weather flow(WWF) increased from 106.2% to 154.8% compared to dry weather flow(DWF) in intercepting sewers, and that the WWF increased from 122.4% to 257.6% in comparison to DWF in storm overflow diverging chamber. As a result, owing to storm overflow diverging chamber of partially separate sewer system with untreated tributary of sewage treatment plant, rainfall-derived infiltration/inflow(RDII) has been analyzed 2.7 times higher than the areas without storm overflow diverging chamber. Meanwhile, infiltration quantity of this study area was relatively higher than that of other study areas. Therefore, it is necessary to reduce infiltration quantity through sewer pipe maintenance nearby river. Drainage equipment maintenance should be performed not to operate storm overflow diverging chamber in order to handle the appropriate sewage treatment plant capacity for rainfall because it is also expected that RDII due to rain will occur after maintenance. In conclusion, it is necessary to recognize aRDII(allowance of rainfall-derived infiltration/inflow) and to be reflected it on sewage treatment plant capacity because aRDII can occur even after maintenance to the complete separate sewer system.

Development of Expert System for Maintenance of Tunnel(I) (터널의 유지관리를 위한 전문가시스템 개발(I) : 시스템 구축 및 적용성 검토)

  • Kim, Do-Houn;Huh, Taik-Nyung;Kim, Moon-Kyum
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.4 no.2
    • /
    • pp.175-184
    • /
    • 2000
  • The maintenance of tunnels is often neglected since tunnels has tendency to become stable with time. The determination of safety of tunnels is a complicated problem. So the role of experienced engineer in the maintenance is very important and development of an expert system which can perform as these engineers has been needed. In this study, an expert system which can determine the safety of tunnels is developed. The developed knowledge base contains the maintenance procedure which is used in KlSTEC(Korea Infrastructure Safety & Technology Corporation). Field test, laboratory test and nondestructive test methods are considered in this knowledge base. Criteria for each item and integrated diagnosis criteria are implemented in the expert system based on literatures and reports. The expert system includes basic inspection. detail inspection and precision inspection. For precision inspection. it has the capacity to exchange the result from numerical analysis by a commercial program FLAC. To verify the expert system. the proposed procedure was compared with an existing tunnel diagnosis report.

  • PDF

Benchmarking Highway Maintenance Practices for Standardized Guideline Development (도로공사 유지관리 표준화 절차 개발을 위한 벤치마킹)

  • Ha, Minhui;Kim, Donghee;Shin, Hochul;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.44-56
    • /
    • 2019
  • Recently, the paradigm of SOC investment has shifted from new construction to maintenance. This shift became more important for the highway system because it is as one of the most important SOC. In Korea, highway maintenance costs are about 20% of the total annual highway construction budget, which is about two-thirds of developed countries. In addition, establishing standardized guidelines for the highway maintenance operation is not in place. Therefore, in order for domestic road construction and maintenance technology to secure competitiveness in the global construction market, it is urgent to improve the management capacity for maintenance as well as the technology and management capacity. This study examines highway maintenance practices in OECD countries such as North America, Europe, Australia, New Zealand, and Japan to identify core elements of highway maintenance practice. It is imperative to establish a comprehensive management system based upon asset management principle. Even if the budget for the highway construction is reduced, investment in maintenance needs to be maintained.

A Study on Evaluation of Sidewalk / Roadway Pavement Using Stone Block (스톤 블럭을 이용한 보.차도 포장의 적용성 평가)

  • Yoon, Won-Sub;Kim, Jong-Kook;Park, Sang-Jun;Cho, Chul-Hyun;Chae, Young-Su
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.259-266
    • /
    • 2008
  • Recently, the maintenance period of sidewalk pavement proposed in Ministry of Construction & Transportation to be extended by more than 10 years. Therefore it takes many interests in Durability and the maintenance. Beside sidewalk pavement, block pavement happened problems in parking and road less than 20km/hr about bearing capacity and durability, the maintenance. It interests about importance of environmentally friendly sidewalk pavement. It compared engineering characteristics about strength and durability through general pavement comparison with stone block pavement. It estimate bearing capacity in actual si-tu site and test site. It experimented plate bearing test and field density test. It verified about durability of pavement by construction availability of geosynthetics that is constructed by purpose of filter. Stone block pavement evaluated about application of sidewalk/road pavement on the basis of result.

  • PDF

Development of Permanent Magnet Synchronous Motor for High-speed Electric Multiple Unit - 400km/h eXperimen (차세대 고속전철용 영구자석동기 전동기 개발)

  • Kim, Jung-Chul;Kim, Bong-Chul;Park, Yeong-Ho;Kim, Chul-Ho
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.470-474
    • /
    • 2010
  • Up until now, power centralized trains have been produced due to the maintenance convenience and comfortableness, but there are some problems, such as limitation of viscosity and maintenance difficulty of railroad due to recently increasing axle mass. In order to improve the problems, power decentralized trains have been developed to improve traction power. In the case of using electrical braking system, it is possible to improve braking friction power. Induction motors have been developed for power decentralized high speed train because of less structural defection, and low maintenance and production cost. However, induction motors have limitations, such as assuring enough power capacity and efficiency with reduced size. PMSM (Permanent magnet synchronous motor) have been newly developed to improve shortcomings of induction motors. The PMSM can be produced small and light weighted. Also if the PMSM and induction motors have the same size and power capacity, the PMSM have better power efficiency. In this pater, the prototype and modified type of PMSM for "High-speed Electric Multiple Unit-400km/h eXperimmen" will be introduced.

  • PDF

A Study on the Simulation about Operation Availability under Maintenance Capacity and Repair Part Constraints (정비능력, 예비품 수량 제약조건 하에서의 운용가용도 시뮬레이션 연구)

  • Park, Se-Hoon;Moon, Seong-Am;Lee, Jung-Hwan
    • Korean System Dynamics Review
    • /
    • v.11 no.2
    • /
    • pp.119-138
    • /
    • 2010
  • This study introduces the system dynamics model that simulate total operational availability when 10 equipments made of 3 major components are serviced under the constrains of the maintenance capacity level and the number of spare parts. This simulation is designed on the base of reliability engineering concept so failures of components happens with the rule of engineering factors like the mean time between failure(MTBF) of component and the next failure time of one component is effected by the conditions of other components. We analysed availability of 10 equipments under 121 constrains and executed multiple regression analysis with the simulation result. The analysis provide the managerial insight in the service fields with operation many equipments.

  • PDF

The Effect Analysis of the Improved Vari-METRIC in Multi-Echelon Inventory Model (Vari-METRIC을 개선한 다단계 재고모형의 효과측정)

  • Yoon, Hyouk;Lee, Sang-Jin
    • Korean Management Science Review
    • /
    • v.28 no.1
    • /
    • pp.117-127
    • /
    • 2011
  • In the Multi-Echelon maintenance environment, METRIC(Multi-Echelon Technique for Repairable Item Control) has been used in several different inventory level selection models, such as MOD-METRIC, Vari-METRIC, and Dyna- ETRIC. While this model's logic is easy to be implemented, a critical assumption of infinite maintenance capacity would deteriorate actual values, especially Expected Back Order(EBO)s for each item. To improve the accuracy of EBO, we develop two models using simulation and queueing theory that calculates EBO considering finite capacity. The result of our numerical example shows that the expected backorder from our model is much closer to the true value than the one from Vari-METRIC. The queueing model is preferable to the simulation model regarding the computational time.

Flexural Capacity of RC Beams Strengthened with Carbon Fiber Sheets (탄소섬유시트로 보강된 철근콘크리트 보의 휨성능)

  • Park, Hyun-Jung;Cho, Baik-Soon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.3
    • /
    • pp.177-187
    • /
    • 2004
  • This investigation attempts to analyze the flexural behavior of a strengthened beam with carbon fiber sheets in three stages according to the conditions of the constituents : elastic stage, pre-yielding stage, and post-yielding stage. The proposed analytical method for strengthened beams is compared with the experimental results such as yield load, ultimate load, and flexural rigidities. The contributions of the constituents to the strengthened beam capacity are examined from the flexural analysis. The validity of using KCI strength method to estimate ultimate moment of a strengthened beam is also investigated.