Estimation of main cable tension force of suspension bridges based on ambient vibration frequency measurements

  • Wang, Jun;Liu, Weiqing;Wang, Lu;Han, Xiaojian
    • Structural Engineering and Mechanics
    • /
    • v.56 no.6
    • /
    • pp.939-957
    • /
    • 2015
  • In this paper, a new approach based on the continuum model is proposed to estimate the main cable tension force of suspension bridges from measured natural frequencies. This approach considered the vertical vibration of a main cable hinged at both towers and supported by an elastic girder and hangers along its entire length. The equation reflected the relationship between vibration frequency and horizontal tension force of a main cable was derived. To avoid to generate the additional cable tension force by sag-extensibility, the analytical solution of characteristic equation for anti-symmetrical vibration mode of the main cable was calculated. Then, the estimation of main cable tension force was carried out by anti-symmetric characteristic frequency vector. The errors of estimation due to characteristic frequency deviations were investigated through numerical analysis of the main cable of Taizhou Bridge. A field experiment was conducted to verify the proposed approach. Through measuring and analyzing the responses of a main cable of Taizhou Bridge under ambient excitation, the horizontal tension force of the main cable was identified from the first three odd frequencies. It is shown that the estimated results agree well with the designed values. The proposed approach can be used to conduct the long-term health monitoring of suspension bridges.

Numerical investigation on the wind stability of super long-span partially earth-anchored cable-stayed bridges

  • Zhang, Xin-jun;Yao, Mei
    • Wind and Structures
    • /
    • v.21 no.4
    • /
    • pp.407-424
    • /
    • 2015
  • To explore the favorable structural system of cable-stayed bridges with ultra-kilometer main span, based on a fully self-anchored cable-stayed bridge with 1400 m main span, a partially earth-anchored cable-stayed bridge scheme with the same main span is designed. Numerical investigation on the dynamic characteristics, aerostatic and aerodynamic stability of both two bridge schemes is conducted, and the results are compared to those of a suspension bridge with similar main span, and considering from the aspect of wind stability, the feasibility of using partially earth-anchored cable-stayed bridge in super long-span bridges with ultra-kilometer main span is discussed. Moreover, the effects of structural design parameters including the length of earth-anchored girder, the number of auxiliary piers in side span, the height and width of girder, the tower height etc on the dynamic characteristics, aerostatic and aerodynamic stability of a partially earth-anchored cable-stayed bridge are analyzed, and their reasonable values are proposed. The results show that as compared to fully self-anchored cable-stayed bridge and suspension bridge with similar main span, the partially earth-anchored cable-stayed bridge has greater structural stiffness and better aerostatic and aerodynamic stability, and consequently becomes a favorable structural system for super long-span bridges with ultra-kilometer main span. The partially earth-anchored cable-stayed bridge can achieve greater stiffness and better wind stability under the cases of increasing the earth-anchored girder length, increasing the height and width of girder, setting several auxiliary piers in side span and increasing the tower height.

Structural Analysis of a Cable Anchor System for a Cable-Stayed Bridge over the Sea (해상 사장교의 Pipe형 케이블 정착구에 관한 구조해석)

  • KONG BYUNG-SEUNC;HONG NAMSEEG
    • Journal of Ocean Engineering and Technology
    • /
    • v.19 no.5 s.66
    • /
    • pp.34-42
    • /
    • 2005
  • The cable connection zone of the cable-stayed bridge transfers deal-load, live-load, and second-load to the cables on the structural joint zone of the cables and the main girders are the most critical parts in which big cable tensile forces are generated by those loads. Therefore, it is necessary to thoroughly check the main girder, structurally to secure the required stability. Because of the heavy tensile force of cables linked in the connection zone of the cable-stayed bridge, locally concentrated stress, as well as the dispersion of stress, occurs in the structurally contacted point of cable and main girder thus, we need to make a thorough investigation through a detailed structural analysis. Directly delivering the tensile force to the connection zone of the cable, the consequently big effect in the tensile force fluctuation caused by the live-load will make it necessary to review the fatigue strength. As the connection zone of the cable is designed to resist the tensile force of the cable, which is applied to a connecting section as a concentrated force, thick plates are used. These plates are frequently made of welded structure, thus, the investigation of the welding workability is inevitable.

Apparel Purchasing Behavior of Cable TV Home-Shopping Viewers (케이블TV 홈쇼핑 시청자의 의복 구매행동)

  • Ku, Yang-Suk;Kim, Ju-Young
    • Fashion & Textile Research Journal
    • /
    • v.1 no.3
    • /
    • pp.231-238
    • /
    • 1999
  • The purpose of this study was to identify characteristics and consumer attitude on purchasing apparel of Cable TV home-shopping viewer: A questionnaire was developed to measure watching attributes, consumers' attitude and actual purchasing condition of Cable TV home shopping, and demographic variables. The questionnaire was administered to 277 adult, and the data were analyzed by using frequency; crosstab, t-test, ANOVA. The results of this study were as follows: 1. main view time were 3~5 p.m. 11 p.m, 10~12 a.m. home shopping through Cable Tv. Women's main terms were afternoon, whereas men's main terms were night. Chiefly view program was about apparel and fashion items. The reason why they watched the home-shopping channel was to purchase more cheaper items. 2. Favor about Cable TV home-shopping was relatively affirmative, but purchasing intention through home-shopping was still negative. But affirmative response was gradually increasing a few years ago. 3. Purchasing experience through Cable TV home shopping was 61.0% and clothing purchaser within recently 6 months was 28.5% of total sample. Withspreading Cable TV widely; Cable TV home shopper was gradually increasing. Heavy purchasing items through Cable TV home-shopping were under-wear; muffler, shawl, because those items are standardized in size and style. When home shopping user made purchasing decision, the most significant factors were color; and size (fit), price in order of importance.

  • PDF

Analytical Method to Determine the Dynamic Amplification Factor due to Hanger Cable Rupture of Suspension Bridges (현수교 행어 케이블 파단에 의한 동적확대계수의 해석적 결정법)

  • Na, Hyun Ho;Kim, Yuhee;Shin, Soobong
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.18 no.6
    • /
    • pp.301-308
    • /
    • 2014
  • A suspension bridge is a type of bridge in which the beam is suspended by load-bearing cables. There are two classifications: the self-anchored suspension bridge has the main cable anchored to the bridge girders, and the earth-anchored suspension bridge has the main cable anchored to a large anchorage. Although a suspension bridge is structurally safe, it is prone to be damaged by various actions such as hurricanes, tsunamis and terrorist incidents because its cables are exposed. If damage to a cable eventually leads to the cable rupture, the bridge may collapse. To avoid these accidents, studies on the dynamic behavior of cable bridges due to the cable rupture have been carried out. Design codes specify that the calculated DAF (dynamic amplification factor) should not exceed a certain value. However, it has been difficult to determine DAFs effectively from dynamic analysis, and thus no systematic approach has been suggested. The current study provides a guideline to determine DAFs reliably from the dynamic analysis results and summarizes the results by applying the method to an earth-anchored suspension bridge. In the study, DAFs were calculated at the location of four structural parts, girders, pylons, main cable and hangers, with variations in the rupture time.

Galloping of steepled main cables in long-span suspension bridges during construction

  • An, Yonghui;Wang, Chaoqun;Li, Shengli;Wang, Dongwei
    • Wind and Structures
    • /
    • v.23 no.6
    • /
    • pp.595-613
    • /
    • 2016
  • Large amplitude oscillation of steepled main cables usually presents during construction of a long-span bridge. To study this phenomenon, six typical main cables with different cross sections during construction are investigated. Two main foci have been conducted. Firstly, aerodynamic coefficients of a main cable are obtained and compared through simulation and wind tunnel test: (1) to ensure the simulation accuracy, influences of the numerical model's grid size, and the jaggy edges of main cable's cross section on main cable's aerodynamic coefficients are investigated; (2) aerodynamic coefficients of main cables at different wind attack angles are obtained based on the wind tunnel test in which the experimental model is made by rigid plastic using the 3D Printing Technology; (3) then numerical results are compared with wind tunnel test results, and they are in good agreement. Secondly, aerodynamic coefficients of the six main cables at different wind attack angles are obtained through numerical simulation. Then Den Hartog criterion is used to analyze the transverse galloping of main cables during construction. Results show all the six main cables may undergo galloping, which may be an important reason for the large amplitude oscillation of steepled main cables during construction. The flow structures around the main cables indicate that the characteristic of the airflow trajectory over a steepled main cable may play an important role in the galloping generation. Engineers should take some effective measures to control this harmful phenomenon due to the big possibility of the onset of galloping during the construction period.

Reasonably completed state assessment of the self-anchored hybrid cable-stayed suspension bridge: An analytical algorithm

  • Kai Wang;Wen-ming Zhang;Jie Chen;Zhe-hong Zhang
    • Structural Engineering and Mechanics
    • /
    • v.90 no.2
    • /
    • pp.159-175
    • /
    • 2024
  • In order to solve the problem of calculating the reasonable completed bridge state of a self-anchored hybrid cable-stayed suspension bridge (SA-HCSB), this paper proposes an analytical method. This method simplifies the main beam into a continuous beam with multi-point rigid supports and solves the support reaction forces. According to the segmented catenary theory, it simultaneously solves the horizontal forces of the main span main cables and the stay cables and iteratively calculates the equilibrium force system on the main beam in the collaborative system bridge state while completing the shape finding of the main span main cable and stay cables. Then, the horizontal forces of the side span main cables and stay cables are obtained based on the balance of horizontal forces on the bridge towers, and the shape finding of the side spans are completed according to the segmented catenary theory. Next, the difference between the support reaction forces of the continuous beam with multiple rigid supports obtained from the initial and final iterations is used to calculate the load of ballast on the side span main beam. Finally, the axial forces and strains of each segment of the main beam and bridge tower are obtained based on the loads applied by the main cable and stay cables on the main beam and bridge tower, thereby obtaining analytical data for the bridge in the reasonable completed state. In this paper, the rationality and effectiveness of this analytical method are verified through a case study of a SA-HCSB with a main span of 720m in finite element analysis. At the same time, it is also verified that the equilibrium force of the main beam under the reasonably completed bridge state can be obtained through iterative calculation. The analytical algorithm in this paper has clear physical significance, strong applicability, and high accuracy of calculation results, enriching the shape-finding method of this bridge type.

A Study on Pylon Cable Anchor System in Cable-Stayed Railway Bridge (철도용 사장교의 주탑 케이블 정착부에 관한 연구)

  • Han, Sung-Gwan;Gong, Byung-Seung
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.565-580
    • /
    • 2006
  • Set in constant increase and period current of lively technical development of railroad use and construction of cable stayed bridge railway bridge, one of bridge form of most suitable that think side police officer and the material enemy of bridge that use long rail, is increasing laying stress on the foreign countries. Main tower fixing department of this cable stayed bridge is consisted of main tower flange that support bearing plate, bay ring plate bearing plate, support end rib and diaphragm etc, as stress transmission mechanic that tensility of cable socket into normal force of main tower, and is used this time. These structural elements is very complex the structure and direction of load delivered from socket specially calbe particularly be different, and need FEM analysis that use Thick Shell element for suitable arrangement of mutual stress flowing grasping and absence that follow hereupon because all of the each support plate angle that suport this differ.

  • PDF

The characteristics of the multi-span suspension bridge with double main cables in the vertical plane

  • Zhang, Li-Wen;Xiao, Ru-Cheng;Jiang, Yang;Chai, Sheng-Bo
    • Structural Engineering and Mechanics
    • /
    • v.42 no.3
    • /
    • pp.291-311
    • /
    • 2012
  • The multi-span suspension bridge having double main cables in the vertical plane is investigated regarding endurance of live load distribution in the case of non-displaced pylon and pylon displacement. The coefficient formula of live load distribution described as the ratio of live load on the bottom cable to the top cable is obtained. Based on this formula, some function in respect of this bridge are derived and used to analyze its characteristics. This analysis targets the cable force, the cable sag and the horizontal displacement at the pylon top under live load etc. The results clarified that the performance of the live load distribution and the horizontal force of cables in the case of non-deformed pylon has a similar tendency to those in the case of deformed pylon, and the increase of pylon rigidity can increase live load distributed to the bottom cable and slightly raise the cable horizontal force under live load. However, effect on the vertical rigidity of bridge and the horizontal force increment of cables caused by live load is different in the case of non-deformed pylon and deformed pylon.

Analytical methods for determining the cable configuration and construction parameters of a suspension bridge

  • Zhang, Wen-ming;Tian, Gen-min;Yang, Chao-yu;Liu, Zhao
    • Structural Engineering and Mechanics
    • /
    • v.71 no.6
    • /
    • pp.603-625
    • /
    • 2019
  • Main cable configurations under final dead load and in the unloaded state and critical construction parameters (e.g. unstrained cable length, unstrained hanger lengths, and pre-offsets for tower saddles and splay saddles) are the core considerations in the design and construction control of a suspension bridge. For the purpose of accurate calculations, it is necessary to take into account the effects of cable strands over the anchor spans, arc-shaped saddle top, and tower top pre-uplift. In this paper, a method for calculating the cable configuration under final dead load over a main span, two side spans, and two anchor spans, coordinates of tangent points, and unstrained cable length are firstly developed using conditions for mechanical equilibrium and geometric relationships. Hanger tensile forces and unstrained hanger lengths are calculated by iteratively solving the equations governing hanger tensile forces and the cable configuration, which gives careful consideration to the effect of hanger weight. Next, equations for calculating the cable configuration in the unloaded state and pre-offsets of saddles are derived from the cable configuration under final dead load and the conditions for unstrained cable length to be conserved. The equations for the main span, two side spans and two anchor spans are then solved simultaneously. In the proposed methods, coupled nonlinear equations are solved by turning them into an unconstrained optimization problem, making the procedure simplified. The feasibility and validity of the proposed methods are demonstrated through a numerical example.