Study on KSLV-II Program's Budget Execution Management (한국형발사체개발사업 예산 집행 관리 방안 연구)

  • Lee, Hyo Young;Cho, Dong Hyun;Yoo, Il Sang
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.1
    • /
    • pp.73-78
    • /
    • 2017
  • Space development program is a large and complex system consisting of a multi-disciplinary high-end technologies and it is important to implement a program management system connected with systems engineering as well as to develop critical technologies. Major organizations in space fields carry out effective budget execution management and operation according to the strategy and objective of space development using information systems. Korea Space Launch Vehicle II(KSLV-II) has adopted a cost management plan using a system engineering to complete the program within the assigned schedule and budget. This paper introduces the budget execution management system applied to KSLV-II budget management and the budget execution dashboard system for supporting program decision making.

The Case Study on The Introduction and Practical Application of the Budget Management System -On the Performance Measurement of Standard Work Unit- (예산관리제도의 도입과 실제적 운용에 관한 사례연구 -표준적인 작업의 성과측정을 중심으로-)

  • 윤용운
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.2 no.2
    • /
    • pp.39-51
    • /
    • 1979
  • In introducing and applying the budget management system, the question of how to establish management structure(skelton) representing budget management responsible unit is significantly related to the degree of accuracy and analysis on the performance measurement of standard work unit. We have the following rational process of establishing performance measurement of budget management System ; 1) Standardization of work method 2) Establishment of management structure 3) Institution of budget management system. Especially, this system is based on a premise of efficiency of objectives management, it is assumed that performance measurement in the standard work unit must be enforced according to the basis and categories of performance evaluation based on the evaluating work unit. Therefore, most of all, the following three detail questions(subjects) are to be determined in order to rationalize these above principles to a maximum possible extent of performance measurement system. First, we established respective performance standard unit with respect to such detailed work unit, performance standard unit of which were accurately applicable directly from using the budget ana objectives account data and their supplementary data of the work measurement techniques. Second, by using the above mentioned question, over all evaluation and suggestion are made based on the study of the recording for each work unit development, budget management and production nit (volume of production) Third, the measurement of performance of budget management system is based on the principle of standard work unit, compared with the standard basis and actual work unit by period and activities unit and calculated percentage effectiveness according to the above procedure. and so evaluated the efficiency of performance measurement on the budget management system.

  • PDF

Bridge Appropriate Maintenance Budget Allocation Considering Safety and Service Life (교량 안전성과 공용년수를 고려한 적정 보수보강 예산 배분)

  • Sun, Jong-Wan;Lee, Huseok;Park, Kyung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.130-137
    • /
    • 2017
  • To maintain traffic safety during the target lifetime of bridges, it is essential to secure an appropriate maintenance budget and allocate that budget appropriately. This paper proposes a reasonable budget allocation system that considers various impact factors to improve the conventional budget allocation method simply considering the bridge scale. The maintenance action rate model and the unit cost model based on the prior maintenance history were developed to allocate appropriately the bridge maintenance budget for the total bridges of the management organization with the target management level. A method to determine the optimal budget allocation ratio for each management subject was proposed and case analysis was conducted using the proposed model. Proper budget allocation was made considering the bridge types, current safety level, and service life as well as the bridge size as an impact factor of the budget allocation of the bridge. The developed method can prevent budget waste and provide a rational basis for budget allocation by implementing the rational budget distribution.

Contingency and Management Reserves Estimation Method for Project Budget (프로젝트 예비비 편성 방법에 관한 연구)

  • Kwon, Hyukchun;Kang, Changwook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.1
    • /
    • pp.17-24
    • /
    • 2016
  • Many organizations have transformed their business in order to survive and compete in the future. They generate projects by creating a vision, using strategies and objectives with funds aligning strategies and make efforts to complete them successfully because project success leads to business success. All projects have triple constraints such as scope, time, and cost to be completed. Project cost performance is a key factor to achieve project goals and which is mostly related with risks among various cost drivers. Projects require a cost estimation method to complete them within their budget and on time. An accurate budget cannot be estimated due to the uncertainties and risks. Thus some additional money should be funded in addition to the base budget as a contingency reserve for identified risks and a management reserve for unidentified risks. While research on contingency reserve for identified risks included in project budget baseline have been presented, research on management reserve for unidentified risks included in total project budget is still scarce. The lack of research on estimation method and role of the management reserve have made project managers little confidence to estimate project budget accurately with reasonable basis. This study proposes a practical model to estimate budgets including contingency and management reserves for not only project cost management but also to keep the balance of organization's total funds to maximize return on investments for project portfolio management. The advantages of the proposed model are demonstrated by its application to construction projects in Korea and the processes to apply this model for verification are also provided.

IMPROVEMENT OF WASTE ADMINISTRATION BY NEW PUBLIC MANAGEMENT

  • Kotomi Uemoto ;Seigo Nasu ;Shunji Kusayanagi
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.424-428
    • /
    • 2005
  • As the application of NPM in waste administration branch this paper proposes a new waste management method in order to increase the efficiency of resources and reduce the quantity of waste. First the matrix method is suggested which comprehensively consider and integrate the proposals of different government departments. Moreover the inhabitant's attitude toward the new waste management measures was investigated. Based on the investigation the evaluation function was made, which include three elements: necessary budget, the effect of cost decrease and the environmental burden decrease. The optimal method of budget allocation to maximize social welfare is proposed under the condition of limited budget by the evaluation function. By applying this system further local governments will be able to determine their adequate service level and budget size.

  • PDF

Status of Government Funded Projects for "Laboratory Safety" ('연구실 안전' 관련 정부연구개발사업 동향 분석)

  • Suh, Jiyoung;Kim, Hyemin;Bae, Sunyoung;Park, Jeongim
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.31 no.4
    • /
    • pp.396-416
    • /
    • 2021
  • Objectives: This study was conducted to analyze the trends of government R&D (R&D) projects related to laboratory safety over the past 20 years. Methods: We collected publications from various databases(DBs) with words such as laboratory(ies), lab(s), researcher(s), laboratory worker(s), safety, environment, hazard(s), risk(s), and so on. Selected publications were analyzed by the research funds and the number of projects according to the investment subject and research characteristics. Results: About 93% of the total R&D budget went to government policy projects, not scientific research. Second, from the perspective of 'safety management activities', most of the research is related to management and inspection at the organizational level. Issues that need to be discussed at the national level like policy governance are not included. Third, focusing on the 'safety management cycle', there were few studies related to 'prediction' or 'post-response'. Fourth, when an analysis framework combining the perspectives of 'safety management activities' and 'safety management cycle' is applied, most of the budget is spent on infrastructure such as digital management systems, whereas basic knowledge for prevention and production of evidence was very few. Conclusions: In order to prevent policy planning without policy evaluation, implementation without strategy, and evaluation without evidence, it is necessary to expand investment in empirical research on risks, research on the effectiveness of current application methods, and research on theory development. The government budget for laboratory safety-related projects should be managed separately from the R&D budget for scientific research. Although less than 5% of the budget allocated to scientific research is the total budget, an optical illusion occurs because both the project budget and the scientific research budget are counted as R&D budgets.

A Study on the Strategy of Securing the Archival Budget through Qualitative Research Method (기록전문직의 기록관리 사업예산 확보 전략 연구)

  • Suh, Hwayul;Yim, Jinhee
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.22 no.3
    • /
    • pp.55-81
    • /
    • 2022
  • The purpose of this study is to explore a budget-securing strategy to enable archival professionals in public institutions to continuously secure the budget for records management projects. This study is an analysis of the results of in-depth interviews with 14 archival professionals who have worked for public institutions and secured budgets for records management projects. As a result of the analysis, 4 upper categories and 10 categories are extracted as factors influencing budget securement. The top four categories are the job environment of archival professionals, umbrella organization and organizational culture, business and budget characteristics, and system and social environment. As the budget-securing strategy for archival professionals, a total of 3 categories and 13 strategic codes are derived. The three categories are utilizing individual-centered competencies, establishing organization-centered relationships, and finding external environment-centered triggers. This study emphasized the perspective of archival professionals and suggested implications such as the role of archival professionals and the direction of improvement in securing budgets.

A Studyon Implementation of TPBS (Transportation-planning Programming Budgeting System) (교통기획예산제도(TPBS) 도입방안에 관한 연구)

  • 김종민
    • Journal of Korean Society of Transportation
    • /
    • v.13 no.1
    • /
    • pp.153-165
    • /
    • 1995
  • The budget management in Korea is one-year budget system which is just following int he steps of last years budget plan. This system towards traditional item-by-item and restriction-centered budget system. The budget distribution without establishing and considering rational policy goals and directions have brought inefficient resource allocations. In order to promote the implementation of transportation planning, there are some alternatives like introduction of top-down planning system preparing for the provincial self-government era. In this study, the most efficient alternatives to promote the existing management system is referring by foreign countries transportation planning examples(BVWP system in Germany). First of all, mid-long term transportation and budget planning should be established and then make decisions of resource availability and allocation. In order to provide ration budget planning, introduction of Transportation Planning Programming Budget System(TPBS) has been judged as one of the method of unifying the sysematic transportation improvement planning and budgeting. All transporation planning and related activites can not be expressed in quantity and due to the limitation of excessive cost of analyzing transportation planning and ranking priority, here after, the continuous study to minimize the evaluation cost and introduction of TPBS should be done.

  • PDF

Investment Direction of Disaster Safety Projects Considering Characteristics of Disaster Safety (재난안전사고 피해특징을 고려한 재난안전사업 투자방향 제시)

  • Heo, Bo-Young;Cho, Sung-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.2
    • /
    • pp.41-50
    • /
    • 2017
  • Disaster and safety budget can be characterized as a large-scale public asset on which the government has a significant role. It is of a crucial importance to properly allocate the limited national budget to various areas as necessary. Higher investment efficiency of the budget related to disaster and safety management requires distribution criteria based on relevance and efficiency. Currently, the budget related to disaster and safety management is orchestrated through the prior consultation system. However, there is still no clear framework for reviewing the investment direction and setting the priority investment areas by prior consultation. This study analyzes the status and characteristics of disaster and safety management projects by damage type and proposes a structured system for prioritization. This framework can be useful in selecting the areas that need priority investments by damage type of disaster and safety management projects, thereby contributing to improving investment efficiency.

Analysis of Environment Improving Budget of School Facilities by Using Data Warehouse Technology - Focused on Elementary, Middle, High School of OO Office of Education - (데이터 웨어하우스 기술을 활용한 학교시설물의 환경개선예산 분석 - OO교육청 초·중·고등학교를 중심으로 -)

  • Pak, Min-Kyu;Son, Chang-Baek;Ryu, Han-Guk
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.13 no.1
    • /
    • pp.15-23
    • /
    • 2014
  • With introduction of amended educational curriculum in 2007, optimizing project of educational environment to accomplish its purposes and goals includes expanding educational facilities and supplying eco-friendly school facilities. However, while the focus of optimizing project of educational environment is quality improvement of educational facilities, aging of these facilities built at th times of quantitative expansion and its management become serious problems. Higher concerns on studies and jobs on management of building caused by serious aging of facilities, management cost of building becomes a very crucial issue. Therefore, this study aims to analyze environment improvement budget of school facilities through building and using data warehouse, by investigating and analyzing the current status of environment improvement budget of school facilities and its cost through questionnaire and interview surveys on officers who are in charge of environment improvement budget of school facilities in educational administrations. This study thus analyzed environment improving budget of school facilities by using data warehouse technology collecting related data to the topic and setting levels by region, school class, establishment year, school facility types and others.