• Title/Summary/Keyword: Low-energy operation plan

Search Result 21, Processing Time 0.025 seconds

The Essential Point for the Selection of Small Hydropower Turbine & Generator (소수력 수차발전기의 선정 주안점)

  • Lee Eun-Woong;Lee Gyeong-Bae
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.452-455
    • /
    • 2005
  • We have studied the prearranged plan and the economy of a candidate site for the development of small hydro power. And also we have confirmed its economy by suggesting the technology of the unmanned operation and the selection of the water turbine generator which has a great efficiency. working rate and suitability to the topographical characteristics of various development sites, for example, irrigation reservoirs, water works pipes, sewage systems and cool ing water of a steam power stat ion. Besides we give more examples of the select ion of Francis, propeller turbine and induction generator which can achieve a maximum of power production at a minimum construction cost. With a water turbine which runs at the low head we are able to suggest many programs to boost a development of small hydro power more economically.

  • PDF

An Introduction to the Expansion Plan of the Underground Repository of Low- and Intermediate-level Radioactive Waste In Forsmark, Sweden (스웨덴 포쉬마크 중저준위 방사성 폐기물 지하 처분장 확장 계획 소개)

  • Kwon, Saeha;Min, Ki-Bok;Stephansson, Ove
    • Tunnel and Underground Space
    • /
    • v.26 no.5
    • /
    • pp.339-347
    • /
    • 2016
  • The world's first underground repository for low- and intermediate- level radioactive waste (SFR1) has been in operation since 1988. SFR1 can accommodate $1,000m^3$ of radioactive waste per year with 4 chambers and 1 silo with a total capacity of $63,000m^3$ of radioactive waste. With extended operation time of 10 of the 12 nuclear power reactors and dismantling of the other 2 nuclear reactors, more nuclear waste need to be disposed in the future. Therefore, Swedish Nuclear Fuel and Waste Management Company (SKB) submitted a license application for a repository extension (SFR3) that consists of 6 additional rock chambers with a capacity of $108,000m^3$ of radioactive waste and for accommodating 9 boiling water reactor tanks. In this study, plans for the extension SFR3 are presented with the geological, geomechanical and hydrogeological issues to be considered.

Optimum Management Plan of the HVAC Equipments with LCC Analysis (LCC 분석을 통한 공기조화 열원설비의 최적 관리방안)

  • Kim, Yong-Ki;Woo, Nam-Sub;Kang, Sung-Ju;Lee, Tae-Won
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.20 no.8
    • /
    • pp.556-562
    • /
    • 2008
  • The building HVAC systems have very different qualities of performance and durability with the superintendent's ability for management and maintenance. The poor management of these systems finally lead to the shortening of the life expectancy and result in the increase of operating costs and energy consumptions due to low efficiencies. This study presents an example of appropriate use of the LCC(Life Cycle Cost) analysis in a process of maintaining and repairing old HVAC equipments, by demonstrating the difference of optimal economic life, decrease of running cost, and energy consumption according to the management level of the HVAC equipments. But there are no reliable life expectancy and performance history data at present for optimal management of various building service equipments. Therefore, it is necessary to construct long-term database on operation results of them for more accurate and optimized LCC analysis.

Analysis of the Impact of Key Design Elements for the EU-ETS Phase 4 on the K-ETS in the Future (EU ETS 4기의 주요 제도 설계가 향후 국내 배출권거래제 운영에 미칠 영향 분석)

  • Son, Insung;Kim, Dong Koo
    • Environmental and Resource Economics Review
    • /
    • v.30 no.1
    • /
    • pp.129-167
    • /
    • 2021
  • The emission trading system is an essential policy for reducing greenhouse gas emissions and converting low-carbon society. EU ETS is a good benchmark that is ahead of Korea's emission trading system in terms of operating period and design know-how. Therefore, this study focused on the key design elements of EU ETS phase 4 such as total emission allowances issued (Cap), free allocation method, carbon leakage list, market stability reserve, and innovation supporting system. In addition, we analyzed the impact of key design elements and their changes during EU ETS Phase 1 to 4 on the design and operation of Korea emission trading system in the future. First of all, the expected impact on the design of Korea emission trading system is to increase three demands: preparing benchmark renewal plans, establishing criteria for selecting free allocation industries that reflect domestic industrial structure and characteristics and introducing two-stage evaluations for free allocation industries, and preparing specific plan to support innovation and industries using allowance auction revenues. The next three impacts on the operation of Korea emission trading system are the increased needs for objective and in-depth impact assessment of plan and amendments, provision of system stability and response opportunities by quickly confirming plan and amendments prior to the implementation, and coordination of the emission trading system governance and stakeholder participation encouragement.

A study on the change of EEOI before and after modifying bulbous at the large container ship adopting low speed operation (대형 컨테이너선의 저속 운항 시 선수부 개조 전후 EEOI 변화에 대한 연구)

  • Park, Goryong;Cho, Kwonhae
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.41 no.1
    • /
    • pp.15-20
    • /
    • 2017
  • The International Maritime Organization(IMO) has adopted and implemented compulsory regulation for reducing greenhouse gas emission that cause global warming. However, with global warming underway, the IMO plans to enforce voluntary carbon dioxide emissions reduction based on the Ship Energy Efficient Management Plan and the Energy Efficiency Operational Indicator(EEOI) in the near future. Large container ships sail at low speeds in order to save fuel and reduce carbon dioxide emissions. However, bulbous bows designed for high-speed ships decrease fuel efficiency by acting as resistance when reduced speeds are adopted by large container ships. In order to adopt low-speed operations and increase fuel savings, the bulbous bow of a large container ship was modified into the proper shape and size. Fuel consumption was compared for checking the result of EEOI before and after modifying the bulbous bow adopted on low speed operation of large high-speed ships. The results confirmed much larger carbon dioxide emissions reduction than expected. If EEOI would be implemented as compulsory regulation for reducing carbon dioxide emissions, bulbous bow modification can be considered as one of the fuel saving methods for the high-speed ships.

A study on the development of distribution simulator and simulation results for use in distribution automation system of IEC 61850 protocol (IEC 61850 프로토콜의 배전자동화시스템에 사용을 위한 배전시뮬레이터 개발과 시뮬레이션 결과에 관한 연구)

  • Kim, Jae-Hong;Oh, Jae-Gon
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.15 no.2
    • /
    • pp.95-102
    • /
    • 2022
  • It is a study for the evaluation of the stability of the distribution automation system for the expansion of renewable energy. Through the Renewable Energy 3020 Implementation Plan, the government plans to expand new renewable energy and convert it to participatory energy that improves the quality of life of the people by 2030. The government has set a target of 20% of domestic supply energy for renewable energy generation by 2030. It is planning to establish more than 95 percent of its new facilities with clean energy such as solar power and wind power. By expanding the supply of renewable energy, new energy businesses and distributed power industry were fostered, and short-distance, low-voltage, and small-scale power generation were rapidly expanded rather than large-scale power development in the past. Due to this demand, the importance of power distribution facility operation has emerged and the need for distribution automation system is increasing. This paper discusses the development of a power distribution simulator for the performance and function evaluation of power distribution automation systems and presents the results of an interlocking test with the power distribution automation system. In order to introduce an advanced system into the power distribution system, it is necessary to take advantage of the transmission and distribution system. The DNP3.0 protocol is used in the distribution system and the IEC61850 protocol is used in the transmission and distribution system. It was concluded that the functions and performance of operations were satisfied when these two protocols are mixed and used in the distribution automation system.

A Study on Ventilation System of Underground Low-Intermediate Radioactive Waste Repository (지하 동굴식 중-저준위 방사성 폐기물 처분장의 환기시스템 고찰)

  • Kim, Young-Min;Kwon, O-Sang;Yoon, Chan-Hoon;Kwon, Sang-Ki;Kim, Jin
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.5 no.1
    • /
    • pp.65-78
    • /
    • 2007
  • The pollutants (Rn, CH, CO, HS, radioactive gas from radiolysis) were generated from the process of construction and operation of underground repository, and after disposal of low-intermediate radioactive waste inside there must be controlled by a ventilation system to distribute them in area where enough air is supported. Therefore, a suitable technical approach is needed especially at an underground repository that is equipped with many entry tunnels, storage tunnels, exhaust-blowing tunnels, and vertical shafts in complicated network form. For the technical approach of such a ventilation system, WIPP (Waste Isolation Pilot Plant) in U. S and SFR (Slutforvar for Reaktorafall) low-intermediate radioactive waste repository in Sweden were selected as the models, for calculating the required air quantity, organizing a ventilation network considering cross section, length, surface roughness of the air passage, and describing a calculation of resistance of each circuit. Based on these procedures, a best suited ventilation system was completed with designing proper capacity of fans and operating plan of vertical shafts. As a result of comparing the two repositories based on the geometry dimensions and ventilation facility equipment operation, more parallel circuit as in WIPP, brought decrease in resistance for entire system leading to reduce of operating costs, and the larger cross-sectional area of the SFR, the greater the percentage of disposal capacity. Accordingly, the mixture of parallel circuit of WIPP repository for reducing resistance and SFR repository formation for enlargement of disposal capacity would be the most rational and efficient ventilation system.

  • PDF

Study on the ICT Device Safety System Application Examples in Mines (광산에서의 ICT 장비 활용 및 안전시스템 운용 사례 연구)

  • Kim, Seung-Jun;Ko, Young-Hun;Kim, Jung-Gyu;Seo, Man-Keun;Kim, Jong-Gwan
    • Tunnel and Underground Space
    • /
    • v.32 no.3
    • /
    • pp.194-202
    • /
    • 2022
  • An increased number of cases have occurred in applying ICT technology in the resource development field due to factors such as safety, eco-friendliness, and low cost since the 2000s. In Korea, the 2nd mining master plan specified the significance of converging the full cycle of mining and ICT, while the 3rd mining master plan highlighted ICT and smart mining such as supporting the supply of an ICT mining device and introducing demonstrational smart mining. This study introduces the application of an ICT device and safety system operation in the Jangseong underground mine of Korea Cement Co., Ltd. Currently, Jangseong mine combines two different kinds of 3D equipment including the handheld 3D scanner and multi-station that provides both the measurement and 3D scanning to perform a 3D measurement of the mine. Taken from the 3D measurement of the mine, it is now possible to identify any hazardous areas and abnormalities in different directions and analyze the safety of the crown pillar between two stopes in different level. Besides, the real-time location tracking and communications system have established highly efficient rescue and evacuation plans to effectively deal with any accidents in the mine.

Technical Standards and Safety Review of the Low and Intermediate Level Radioactive Waste Disposal Facility (중.저준위 방사성폐기물 처분시설에 대한 기술기준 및 안전심사)

  • Cheong, Jae-Hak;Lee, Kwan-Hee;Lee, Yun-Keun;Jeong, Chan-Woo;Rho, Byung-Hwan
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.6 no.4
    • /
    • pp.357-368
    • /
    • 2008
  • On July 31, 2008, the Government issued the construction and operation permit for the first low and intermediate level radioactive waste disposal facility in the Republic of Korea. In this paper, the fundamental regulatory framework, regulatory requirements and technical standards of the disposal facility are introduced, and the phased review process adopted for evaluation of the safety of the facility is briefly described. The Atomic Energy Act sets forth a stepwise regulatory framework for the whole life-cycle of the disposal facility such as siting, design, construction, operation, closure and institutional control. More detailed regulatory requirements and technical standards are stipulated in the subsequent regulations of the Atomic Energy Act and a series of Notices issued by the Ministry of Eduction, Science and Technology. The Korea Institute of Nuclear Safety, as entrusted by the Ministry under the Atomic Energy Act, conducted safety review on the disposal facility, and evaluated the compliance with relevant criteria in all technical elements(i.e. siting and structural safety, radiological environmental impact, operational safety, systems and components, quality assurance, and total systematic performance assessment, etc.). The overall safety review process can be phased into inception phase, initial review phase, main review phase and completion phase. The review results were reported to and deliberated by the five Sub-committees of the Special Committee on Nuclear Safety, and then reported to the Ministry. The Ministry issued the construction and operation permit of the disposal facility through the deliberation of the review results by the Nuclear Safety Commission. Hereafter, the safety of the repository will be reassured by a series of subsequent regulatory inspections and reviews under the Atomic Energy Act. In addition, the licensee's continuous implementation of the "Safety Promotion Plan" may also enhance the long-term safety of the repository and contribute to build-up the confidence of the safety case.

  • PDF

Trends of Thermochemical Technology for the Recovery of Phosphorus from Sewage Sludge Ash (열화학적 방법에 의한 하수 슬러지 소각재에서의 인 회수 기술 동향)

  • Jeon, Seulki;Shin, Hyuna;Kim, Dong-Jin
    • Clean Technology
    • /
    • v.24 no.2
    • /
    • pp.87-98
    • /
    • 2018
  • Phosphorus (P) is an essential and irreplaceable element for all living organisms, and it is widely used as a fertilizer. Unfortunately, it is estimated that phosphate reservoir is depleted within about 100 years. Sewage sludge ash (SSA) is an alternative resource for P recovery because of its high P content. However, SSA cannot be directly used as a fertilizer due to heavy metals in it and low P bioavailability. Thermochemical treatment with Cl donor is known to reduce heavy metal contents and increase P bioavailability of SSA. Literature review on thermochemical technologies of SSA for the reduction of heavy metals and bioavailability enhancement has been carried out to estimate the status of current P recovery technology and to develop strategic future research plan for P recovery. The review showed that $CaCl_2$ and $MgCl_2$ were the most effective Cl donors and reaction temperature (< $1000^{\circ}C$) was the critical operation condition for the reduction. The removal efficiency depends on the species of heavy metals. Thermochemical technology of SSA for P recovery showed the possibility of commercial application in the near future to overcome the coming crisis of human sustainability by P depletion, but it needs cost effectiveness and more ecofriendly process to reduce energy consumption.