• Title/Summary/Keyword: Lot-sizing

Search Result 88, Processing Time 0.019 seconds

Case Study of Spatial Planning for the Efficient Use of Small Dwelling Space (소규모 주거공간의 효율적 활용을 위한 공간계획 사례연구)

  • Park, Si-Yoon;Kim, Jeong-Ah
    • Journal of the Korean housing association
    • /
    • v.25 no.1
    • /
    • pp.15-22
    • /
    • 2014
  • In the domestic housing market, uncompleted lot-solid apartments and unoccupied residences are increasing in the medium-large scale area whose rents and transactions have been unstable, as going through the financial crisis and economical recession. Demands for small-scale housings are steadily increasing by practical consumer group who don't need large places, which are often not needed for the current people who are spending most of their time outside of their houses. Therefore, this study proposes the useful methods for spatial planning for small-scale houses for multiple households, including variable form, levels form, multi-level form, and smart-sizing. For efficient spatial planning for that purpose, here, small-scale housings are not limited to places for families with 1-2 members, but considered as one of broader approaches to graft various households and families. In addition, we examined the existed trends of researches about spatial utility of small-scale places, and did the research about the status of small-scale housing developments, and then proposed the direction for future small-scale housings by analyzing the advanced examples.

Integrated production planning in supply chain management environment considering manufacturing partners (SCM 환경에서의 협력 생산을 고려한 통합 생산 계획에 관한 연구)

  • Jeong Ho Sang;Jeong Bong Ju
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.363-370
    • /
    • 2002
  • This paper presents a production planning algorithm for minimizing the costs of production and subcontracting in SCM (supply chain management) environment. In our SCM environment, the several local plants that aye dispersed geographically produce parts and products. In this environment, we have to decide the production volumes of both parts and products considering the BOM (bill-of-material) structure to meet the fixed order quantity or forecasted demand quantity. Each plant produces the specified parts of product with finite production capacity. There exist subcontracting decisions relevant to the production capacity of each plant except the core process plant, and when we use the subcontractor's capacities we should be charged for the fixed subcontracting fees. The objective of this study is to solve the production planning problem, which minimizes the total costs of production, inventory, setup, and subcontracting under constraints of production and subcontracting capacity. For this problem, an integrated production planning model based on the multi-level capacitated lot sizing problem was formulated, and efficient decomposition algorithm was proposed. The experimental investigation shows that the proposed heuristic generates quite good solutions at very low computational costs.

  • PDF

Transport and management of diffuse pollutants using low impact development technologies applied to highly urbanized land uses (고도화 도시지역에 적용된 LID 기법의 비점오염물질 관리 및 이동)

  • Geronimo, F.K.F.;Choi, H.S.;Kim, L.H.
    • Journal of Wetlands Research
    • /
    • v.21 no.2
    • /
    • pp.173-180
    • /
    • 2019
  • This study was conducted to understand factors affecting TSS and heavy metals transport on the road, parking lot and roof. During storm events, heavy metals, which were mostly attached to TSS, were also transported when TSS was washed off in the road, parking lot and roof. This finding may be supported by the significant correlations between TSS load and total and soluble heavy metals load including Cr, Fe, Cu, and Pb (Pearson r value: 0.52 to 0.73; probability p value<0.01). Generation and transport of TSS and heavy metals were greater in the road and parking lot compared to the roof due to vehicular activities, slope and greater catchment areas of these sites. It was found that TSS transport during peak flows of storm events ranges from 65% to 75% implying that by controlling peak flows, TSS transportation to nearby water bodies may be decreased. Depending on the target TSS and heavy metal reduction, sizing of low impact development (LID) technologies and green infrastructures (GI) such as infiltration trench, tree box filter, and rain garden may be calculated. Future researchers were recommended to assess the limitations of the systems and determine the design considerations for these types of facilities.

Sensitivity analysis on the length of credit period for an inventory model with stock dependent consumption rate (재고 종속형 수요를 고려한 재고모형의 신용 거래 기간에 따른 민감도 분석)

  • Shinn, Seong-Whan
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.6
    • /
    • pp.655-660
    • /
    • 2022
  • This paper analyzes the problem of the economic order quantity (lot size) of a retailer in a two-stage supply chain consisting of a supplier, a retailer(distributor), and a customer. In this two-stage supply chain, the supplier permits the retailer to defer payment for a certain fixed period of time for the purchase cost to be paid by the retailer as a price differentiation strategy with his competitor. In addition, in the case of customer goods such as food and grain, it is common to see that end-customer demand is generally depend on the level of inventory displayed by the retailer. From this perspective, this paper analyzes the inventory problem of retailers under the assumption that the supplier may allow a certain period to suspend payments for the purchase of goods and the end customer demand is a function of the retailer's inventory level increasing with size. In this regard, we need to analyze how much the length of the grace period for product purchase costs affect the retailer's lot-sizing policy. Therefore, we formulate the retailer's annual net profit and analyze the effect of the length of credit period on the retailer's inventory policy numerically.

A Heuristic Algorithm for a Ship Speed and Bunkering Decision Problem (선박속력 및 급유결정 문제에 대한 휴리스틱 알고리즘)

  • Kim, Hwa-Joong;Kim, Jae-Gon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.2
    • /
    • pp.19-27
    • /
    • 2016
  • Maritime transport is now regarded as one of the main contributors to global climate change by virtue of its $CO_2$ emissions. Meanwhile, slow steaming, i.e., slower ship speed, has become a common practice in the maritime industry so as to lower $CO_2$ emissions and reduce bunker fuel consumption. The practice raised various operational decision issues in terms of shipping companies: how much ship speed is, how much to bunker the fuel, and at which port to bunker. In this context, this study addresses an operation problem in a shipping companies, which is the problem of determining the ship speed, bunkering ports, and bunkering amount at the ports over a given ship route to minimize the bunker fuel and ship time costs as well as the carbon tax which is a regulatory measure aiming at reducing $CO_2$ emissions. The ship time cost is included in the problem because slow steaming increases transit times, which implies increased in-transit inventory costs in terms of shippers. We formulate the problem as a nonlinear lot-sizing model and suggest a Lagrangian heuristic to solve the problem. The performance of the heuristic algorithm is evaluated using the data obtained from reliable sources. Although the problem is an operational problem, the heuristic algorithm is used to address various strategic issues facing shipping companies, including the effects of bunker prices, carbon taxes, and ship time costs on the ship speed, bunkering amount and number of bunkering ports. For this, we conduct sensitivity analyses of these factors and finally discuss study findings.

Sensitivity analysis for the retailer's pricing and lot-sizing policies on the length of credit period (신용 거래 기간이 소매상의 가격 및 주문정책에 미치는 민감도분석)

  • Seong-Whan Shinn
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.6
    • /
    • pp.257-262
    • /
    • 2023
  • As part of their marketing policy, some suppliers allow retailers a period of credit in anticipation of increasing demand for the products they supply. The opportunity to defer payments on products through credit transactions has the effect of reducing retailers' inventory investment costs, and as a result, retailers determine selling prices in anticipation of increased demand from buyers. This study aims to analyze the inventory model that determines the retailer's selling price and EOQ(Economic Order Quantity) under the assumption that the buyer's demand is an exponentially decreasing function of the retailer's selling price in the credit transaction supply chain consisting of suppliers, retailers, and buyers. The products supplied for problem analysis include the case of deteriorating products that deteriorate over time, and the effect of the credit transaction period, the index of price elasticity and the degree of deterioration on the retailer's selling price and EOQ is analyzed.

Optimal Design of Generalized Process-storage Network Applicable To Polymer Processes (고분자 공정에 적용할 수 있는 일반화된 공정-저장조 망구조 최적설계)

  • Yi, Gyeongbeom;Lee, Euy-Soo
    • Korean Chemical Engineering Research
    • /
    • v.45 no.3
    • /
    • pp.249-257
    • /
    • 2007
  • The periodic square wave (PSW) model was successfully applied to the optimal design of a batch-storage network. The network structure can cover any type of batch production, distribution and inventory system, including recycle streams. Here we extend the coverage of the PSW model to multitasking semi-continuous processes as well as pure continuous and batch processes. In previous solutions obtained using the PSW model, the feedstock composition and product yield were treated as known constants. This constraint is relaxed in the present work, which treats the feedstock composition and product yield as free variables to be optimized. This modification makes it possible to deal with the pooling problem commonly encountered in oil refinery processes. Despite the greater complexity that arises when the feedstock composition and product yield are free variables, the PSW model still gives analytic lot sizing equations. The ability of the proposed method to determine the optimal plant design is demonstrated through the example of a high density polyethylene (HDPE) plant. Based on the analytical optimality results, we propose a practical process optimality measure that can be used for any kind of process. This measure facilitates direct comparison of the performance of multiple processes, and hence is a useful tool for diagnosing the status of process systems. The result that the cost of a process is proportional to the square root of average flow rate is similar to the well-known six-tenths factor rule in plant design.

Policy Direction for The Farmland Sizing Suitable to Regional Trait (지역특성을 반영한 영농규모화사업의 발전방향-충남지역을 중심으로-)

  • Shim, Jae-Sung
    • The Journal of Natural Sciences
    • /
    • v.14 no.1
    • /
    • pp.83-121
    • /
    • 2004
  • This study was carried out to examine how solid the production foundation of rice in Chung-Nam Province is, and, if not, to probe alternative measures through the size of farms specializing in rice, of which direction would be a pivot of rice industry-oriented policy. The results obtained can be summarized as follows : 1. The amount of rice production in Chung-Nam Province is highest in Korea and the size of paddy field area is the second largest : This implying that the probability that rice production in Chung-Nam Province would be severely influenced by a global trend of market conditions. The number of farms specializing in rice becoming the core group of rice farming account for 7.7 percent of the total number of farm household in Korea. Average field area financial support which had been input to farm household by Government had a noticeable effect on the improvement of the policy of farm-size program. 2. Farm-size program in Chung-Nam Province established from 1980 to 2002 in creased the cultivation size of paddy field to 19,484 hectares, and this program enhanced the buying and selling of farmland and the number of farmland bargain reached 6,431 household and 16,517 hectares, respectively, in 1995-2002. Meanwhile, long-term letting and hiring of farmland appeared so active that the bargain acreage reached 6,970 hectares, and farm involved was 7,059 households, however, the farm-exchange-and-unity program did not satisfy our expectation, because the retirement farm operators reluctantly participated to sell their farms. Another reason that had delayed the bargain of farms rested on the general category of social complication attendant upon the exchange and unity operation for scattered farm. Such difficulties would work negative effects out to carry on the target of farm-size work in general. 3. The following measures were presented to propel the farm-size promotion program : a. Occupation shift project, followed by the social security program for retirement and elderly farm operators, should be promptly established and also a number of types of incentives for promoting the letting and hiring work and farm-exchange-and-unity program would also be set up. b. To establish the effective key system of rice production, all the farm operators should increase the unit area yield of rice and lower the production cost. To do so, a great deal of production teams of rice equipped with managerial techniques and capabilities need to be organized. And, also, there should be appropriate arrays of facilities including information system. This plan is desirable to be in line with a diversity of the structural implement of regional integration based on farm system building. c. To extend the size of farm and to improve farm management, we have to devise the enlargement of individual size of farm for maximized management and the utilization of farm-size grouping method. In conclusion, it can be said that the farm-size project in Chung-Nam Province which has continued since the 1980s was satisfactorily achieved. However, we still have a lot of problems to be solved to break down the barrier for attainment of the desirable farm-size operation work.. Farm-size project has fairly close relation with farm specialization in rice and, thus, the positive support for farm household including the integrated program for both retirement farmers and off-farm operators should be considered to pursue the progressive development of the farm-size program, which is key means to successful achievement of rice farming enforcement in Chung-Nam Province.

  • PDF