• Title/Summary/Keyword: Load parallel

Search Result 933, Processing Time 0.03 seconds

Parallel Operation Control Technique of On-line UPS System (온라인 무정전전원장치의 병렬운전 제어기술)

  • Cho J.S.;Kang B.H.;Gho J.S.;Choe G.H.;Kim J.H.;Chung S.E.
    • Proceedings of the KIPE Conference
    • /
    • 2001.07a
    • /
    • pp.501-505
    • /
    • 2001
  • The parallel operation system of UPS is used to increase reliability of power source at critical load. But parallel UPS system has a few defects, impedance is different from each other and circulating current occurs between UPSs, due to line impedance and parameter variation, though controlled by the same synchronization signal. According to such characteristic of parallel UPS, balanced load-sharing control is the most important technique in parallel UPS operation. In this paper, a novel power deviation compensation algorithm is proposed. it is composed of voltage controller to compensate power deviation that be calculated by using active and reactive current deviation between inverters on synchronous d-q reference frame.

  • PDF

Output Phase Synchronization Method of Inverter for Parallel Operation of Uninterruptible Power System (무정전전원장치 병렬운전을 위한 인버터의 출력 위상 동기화 방법)

  • Kim, Heui-Joo;Park, Jong-Myeon;Oh, Se-Hyung
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.25 no.3
    • /
    • pp.235-241
    • /
    • 2020
  • In this paper, we propose the bus/bypass synchronization phase lock loop (B-Sync PLL) method using each phase voltage controller of a parallel UPS inverter. The B-Sync PLL included in each phase voltage control system of parallel UPS inverters has the transient response and the phase synchronization error at grid normal or blackout. The validity of this method is verified by simulation and experiment. As a result, the parallel UPS inverters using the proposed method confirmed that the output phase was continuously synchronized when a grid blackout, improving the transient response characteristics for stable load power supply and equal load sharing.

The Parallel Operation Control Technique of UPS System (UPS시스템의 병렬운전 제어기법)

  • Lee Sang-Hoon;Lee Woo-Cheol;Kim Kyong-Hwan;Hyun Dong-Seok
    • Proceedings of the KIPE Conference
    • /
    • 2002.11a
    • /
    • pp.158-162
    • /
    • 2002
  • The parallel operation system of multiple UPS(Uninterruptible Power Supply) is used to increase power capacity of the system or to secure higher reliability at critical loads. In the parallel operation of the two UPSs, the load sharing control to maintain the current balance between them is a matter of consequence. In this paper, a highly precise load sharing controller is proposed and implemented for the parallel operation system of two UPSs. After that, a good performance of the proposed method is verified by simulation in the parallel operation system with two UPSs.

  • PDF

Analysis of Impedance Performance for Condenser by Harmonic Current Source (고조파 전류원에 의한 콘덴서 임피던스 특성 해석)

  • Kim, Jong-Gyeum;Park, Young-Jeen
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.4
    • /
    • pp.57-64
    • /
    • 2011
  • Most of the user has been used linear load and non-linear load. The former is usually inductive load which is needed power factor compensation, the latter is power conversion system device. Actually two kinds of load is used together in the customer application. Generally capacitor is used for power-factor compensation of inductive load and reduction harmonics of non linear load with reactor. Non-linear load generates harmonic current for its energy conversion process. If harmonic current pass along the low impedance side of distribution system, the magnification of voltage and current is appeared by the series and parallel resonance. As a result, condenser has received a bitter electrical stress by the harmonic component. In this paper, we analyzed that how resonance is changed by the 5-th harmonic current pattern and proposed an alternative plan for non-magnification.

A Study on Optimal Electric Load distribution of Generators on board using a Dynamic Programming (동적계획법을 이용한 선내 발전시스템의 최적부하분담 방법에 관한 연구)

  • 유희한
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.24 no.3
    • /
    • pp.106-112
    • /
    • 2000
  • Since the oil crisis, we have been concerned about the energy saving techniques of electric generating systems. As a part of the effort to save energy, automatic electric load sharing device was developed. Usually, ship's electric generating system consists of two or three sets of generator. And, electric generating system is operated as single or parallel operation mode according to the demanded electric power. Therefore, it is important to investigate generators operating mode for the supply of required electric power in the ship in order to decrease the operating cost. So, this paper suggests the method to solve the optimal electric load distribution problem by dynamic programming. And, this thesis indicates that the proposed method is superior to the lagrange multiplier's method in obtaining optimal load distribution solution in the ship's electric generating system.

  • PDF

Mater-Slave Type Two DC-DC Converters Paralldl Operation Using a Single Current Sensor (단일 전류센서를 사용한 마스터-슬레이브 전류 분배형 2개의 DC-DC 컨버터 병렬운전)

  • 손승찬;박상은;정민재;성세진
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.5 no.2
    • /
    • pp.184-191
    • /
    • 2000
  • We discussed load CUlTent sharing for Master/Slave convertedMSC) type two DC-DC Converters parallel operation using a single current sensor method. In the conventional method, two CTs have been used to share t the load CUlTent equally with two coηverters‘ This paper presents a novel load CUlTent distribution method u using a single CUlTent sensor that can share load CUlTent effectively with only one CT in the Master-Slave C conveη:ers(MSCs) type. To confirm parallel operational performance of proposed DC-DC converters parallel operation, two experimental prototype converters were designed, implemented and experimented under three a arbitrary conditions. A load cur‘rent shahring perforrnance of the proposed method was compared with that of a c conventional peak CUt${\gamma}$ent method requmng two CTs. Those experimental results show that load cUlTent s sharing performance of paralleled two converters using a single CUlTent sensor was good and operated as well a as conventional method (ex, Pe밟 CUlTent Method)

  • PDF

Bending Properties of Parallel Chord Truss with Steel-Web Members

  • Hyung Woo LEE;Sang Sik JANG
    • Journal of the Korean Wood Science and Technology
    • /
    • v.51 no.3
    • /
    • pp.197-206
    • /
    • 2023
  • A truss is a structure in which the members are connected and arranged such that they are primarily subjected to axial loading. A truss has the advantage that it can be used for a longer span because the structure distributes the applied force to its members well, and the load is transmitted only in the axial direction of the members. Trusses manufactured using timber have more advantages than those made of other materials. In this study, the properties of parallel chord trusses composed of timber chord and steel-web members were evaluated. We constructed truss specimens with various lengths by using upper and lower chords of 2 × 4 inch spruce-pine-fir lumber and steel-web members manufactured by S and P companies. The specimens were tested in accordance with KS F 2150. The test results showed that the load at the deflection limit and the deflection limit itself increased from L/180 to L/360 regardless of the length of the specimens. For specimens of the same length, the load at the deflection limit increased as the height of the parallel timber chord truss specimens increased from 200 to 300 mm. Successive installations of the steel-web members (SST) showed almost 2 times the load at each deflection limit compared to that of SAT specimens (alternate installation of the steel-web members). When comparing the three load-deflection limits in terms of the manufacturer of the steel-web members, the load at each deflection limit for SST specimens was higher than that for PST specimens.

Unbalance load current of Operating in Parallel of Lead acid batteries connection condition (납 축전지 병렬운전시 발생하는 전류 불평형 현상분석 및 대책)

  • 반한식;곽철훈;최규하;목형수
    • Proceedings of the KIPE Conference
    • /
    • 1999.07a
    • /
    • pp.210-213
    • /
    • 1999
  • A battery is the device that transforms the chemical energy into the direct-current electrical energy directly without a mechanical process. Unit cells are connected in series to obtain the necessary voltage, while being connected in parallel to organize capacity for load current and to decrease the internal resistance for corresponding the sudden shift of the load current. The circular-current, however, could be occurred when the system is driven in parallel. As a result, the new batteries are heated by over-change and discharge, and the over charge current makes to increase the rust of the positive grid and consequently the shortened life of the new batteris would be shown. In this paper, the internal resistance of charge and discharge will be balanced, through inserting the resistance into the system by way of calculation of the changed amount of internal resistance.

  • PDF

Load Balancing Algorithm for Parallel Computing of Design Problem involving Multi-Disciplinary Analysis (다분야통합해석에 기반한 설계문제의 병렬처리를 위한 부하분산알고리즘)

  • Cho, Jae-Suk;Chu, Min-Sik;Song, Yong-Ho;Choi, Dong-Hoon
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.327-332
    • /
    • 2007
  • An engineering design problem involving Multi-Disciplinary Analysis(MDA) generally requires a large amounts of CPU time for the entire design process, and therefore Multiple Processing System (MPS) are essential to reduce the completion time. However, when applying conventional parallel processing techniques, all of the CAE S/W required for the MDA should be installed on all the servers making up NIPS because of characteristic of MDA and it would be a great expense in CAE S/W licenses. To solve this problem, we propose a Weight-based Multiqueue Load Balancing algorithm for a heterogeneous MPS where performance of servers and CAE S/W installed on each server are different of each other. To validate the performance, a computational experiments comparing the First Come First Serve algorithm and our proposed algorithm was accomplished.

  • PDF

Parallel Operation of Two Converters using Zero Current Transformer Method (영산변류기 동작 방식을 이용한 2개의 컨버터 병렬 운전)

  • Song, Seung-Chan;Seong, Je-Jin
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.49 no.4
    • /
    • pp.256-264
    • /
    • 2000
  • In the conventional method, two CTs have been used to share the load current equally with two converters. A new simle method to find out the current difference between two converters using only one CT as a ZCT is suggested. Two experimental prototype converters were designed and implemented for the evaluation of the load current sharing. The results of experiment show that the newly proposed ZCT method using only one CT could make a good load current sharing than the conventional method required two CT when operating two converters in parallel.

  • PDF