• Title/Summary/Keyword: Load Out

Search Result 4,869, Processing Time 0.033 seconds

A Detailed Analysis of the Part Load Ratio and Cooling Energy Characteristics of Chiller Operation in an Office Building (사무소 건물에서 냉동기의 부분부하율 및 냉방 에너지 성능 특성 분석)

  • Seo, Byeong-Mo;Yu, Byeong-Ho;Lee, Kwang-Ho
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.27 no.11
    • /
    • pp.567-573
    • /
    • 2015
  • Commercial buildings account for significant portions of the total building energy in Korea, and thus, a variety of research on chiller operation has been carried out. However, most of the studies were carried out on the chiller itself, i.e., the part load ratio characteristics and the corresponding electricity energy consumption patterns were not analyzed in existing studies. In this study, the part load ratio and the operating characteristics of the vapor compression chiller were analyzed within an office building equipped with the conventional variable air volume system. As a result, significant portions of total operating hours, cooling load, and energy consumption turned out to be in the part load ratio range of 0 through 50%. Thus, energy consumption was significantly affected by the chiller COP at low part load conditions, indicating that chiller operation at the part load is an important factor in commercial buildings.

A Low Drop Out Regulator with Improved Load Transient Characteristics and Push-Pull Pass Transistor Structure (Push-Pull 패스 트랜지스터 구조 및 향상된 Load Transient 특성을 갖는 LDO 레귤레이터)

  • Kwon, Sang-Wook;Song, Bo Bae;Koo, Yong-Seo
    • Journal of IKEEE
    • /
    • v.24 no.2
    • /
    • pp.598-603
    • /
    • 2020
  • In this paper present a Low Drop-Out(LDO) regulator that improves load transient characteristics due to the push-pull pass transistor structure is proposed. Improved load over the existing LDO regulator by improving the overshoot and undershoot entering the voltage line by adding the proposed push-pull circuit between the output stage of the error amplifier inside the LDO regulator and the gate stage of the pass transistor and the push-pull circuit at the output stage. It has a delta voltage value of transient characteristics. The proposed LDO structure was analyzed in Samsung 0.13um process using Cadence's Virtuoso, Spectre simulator.

Evaluating the pull-out load capacity of steel bolt using Schmidt hammer and ultrasonic pulse velocity test

  • Saleem, Muhammad
    • Structural Engineering and Mechanics
    • /
    • v.65 no.5
    • /
    • pp.601-609
    • /
    • 2018
  • Steel bolts are used in the construction industry for a large variety of applications that range from fixing permanent installations to temporary fixtures. In the past much research has been focused on developing destructive testing techniques to estimate their pull-out load carrying capacity with very little attention to develop non-destructive techniques. In this regards the presented research work details the combined use of ultrasonic pulse velocity and Schmidt hammer tests to identify anchor bolts with faculty installation and to estimate their pull-out strength by relating it to the Schmidt hammer rebound value. From experimentation, it was observed that the load capacity of bolt depends on its embedment length, diameter, bond quality/concrete strength and alignment. Ultrasonic pulse velocity test is used to judge the quality of bond of embedded anchor bolt by relating the increase in ultrasonic pulse transit time to the presence of internal pours and cracks in the vicinity of steel bolt and the surrounding concrete. This information combined with the Schmidt hammer rebound number, R, can be used to accurately identify defective bolts which resulted in lower pull-out strength. 12 mm diameter bolts with embedment length of 70 mm and 50 mm were investigated using constant strength concrete. Pull-out load capacity versus the Schmidt hammer rebound number for each embedment length is presented.

Full-ship Load Out in Skid Berth

  • Kim, Yeong-Hwan;Kim, Hoe-Yong;Kang, Kyoung-Hyuk
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2008.09a
    • /
    • pp.133-135
    • /
    • 2008
  • For complying with the increasing number of ships construction, it's required that not only for minimizing the period of construction in Skid Berth also maximizing application proportion of Skid Barge, The full-ship load out construction method required indispensably.

  • PDF

Field Pull-out Test and Numerical Analysis for Multi-rebar Nail (다철근 네일의 현장인발시험 및 수치해석)

  • Jeon, Sang-Soo;Kim, Doo-Seop;Jang, Yang-Won
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.8
    • /
    • pp.43-52
    • /
    • 2008
  • In this study, the verification test and creep test for both a single-rebar nail and a multi-rebar nail are carried out to investigate a tensile strength for both nails. The adhesion effects between a rebar and a cement grout, a mobilized frictional force induced by pull-out load, and load transfer characteristics are examined. The results obtained from the field pull-out tests and from the numerical analysis using $FLAC^{2D}$ which is one of the programs developed based on the finite difference method are analyzed and compared for a single-rebar nail and a multi-rebar nail. The field pull-out test results for a multi-rebar nail relative to a single-rebar nail show that a tensile failure load is relatively large and the pull-out loads are well transferred to the ground in deep depth.

LOADOUT DEVELOPMENT BY F.E. ANALYSIS METHODOLOGY FOR SIMILAR 300K VLCC SIZE FSO

  • Yang, Y.T.;Kang, H.S.
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2002.10a
    • /
    • pp.51-55
    • /
    • 2002
  • End of July. 2002 Hyundai Heavy Industries Co. Ltd. Offshore Division is successfully completed Load-out & Float-off work of "AMENAM KPONO/FSO Project" similar to 300K VLCC size. The AMENAM FSO hull and topside module built at the HHI Offshore yard using "On-Ground Building Method" developed by HHI. Various methodologies/techniques like Flexi-built FPSO Hull. Topside module erection method. Load-out Float-off methodology etc. are combined to develop a successful on-ground building method. In this paper, we described the "Hull Structural Strength Analysis Methodology" using 3-D Finite Element Analysis and results. This analysis is performed to verily the structural integrity or the AMENAM FSO hull during the main load-out on two semi-submersible barges combined together.

  • PDF

Understanding Automobile Roll Dynamics and Lateral Load Transfer Through Bond Graphs

  • ;Deam Karnopp
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.6 no.3
    • /
    • pp.34-44
    • /
    • 1998
  • It is clear that when an automobile negotiates a curve the lateral acceleration causes an increase in tire normal load for the wheels on the outside of the curve and a decrease in load for the inside wheels. However, just how the details of the suspension linkages and the parameters of the springs and shock absorbers affect the dynamics of the load transfer os not easily understood. One even encounters the false idea that since it is the compression and extension of the main suspension springs spring body role which largely determines the changes in normal load, of roll could be reduced, the load transfer would also be reduced. Using free body diagrams, one can explain quite clearly how the load is transferred for steady state cornering, and, using complex multibody models of particular vehicles one can simulate in good fidelity how load transfer occurs dynamically. Here we adopt a middle ground by using the concept of roll center and using a series of half-car bond graph models to point out main effects. Since bond graph junction structures automatically and consistently constrain geometric and force variables simultaneously, they can be used to point out hidden assumptions of other simplified vehicle models.

  • PDF

Anticipated and actual performance of composite girder with pre-stressed concrete beam and RCC top flange

  • Gurunaathan, K.;Johnson, S. Christian;Thirugnanam, G.S.
    • Structural Engineering and Mechanics
    • /
    • v.61 no.1
    • /
    • pp.117-124
    • /
    • 2017
  • Load testing is one of the important tests to determine if the structural elements can be used at the intended locations for which they have been designed. It is nothing but gradually applying the loads and measuring the deflections and other parameters. It is usually carried out to determine the behaviour of the system under service/ultimate loads. It helps to identify the maximum load that the structural element can withstand without much deflection/deformation. It will also help find out which part of the element causes failure first. The load-deflection behaviour of the road bridge girder has been studied by carrying out the load test after simulating the field conditions to the extent possible. The actual vertical displacement of the beam at mid span due to the imposed load was compared with the theoretical deflection of the beam. Further, the recovery of deflection at mid span was also observed on removal of the test load. Finally, the beam was checked for any cracks to assert if the beam was capable of carrying the intended live loads and that it could be used with confidence.

Fatigue Strength of Fillet Weldment under Out-of-plane Bending Load (필릿 용접부의 면외굽힘하중에 대한 피로강도)

  • 강성원;한상혁;김화수;백영민
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.40 no.1
    • /
    • pp.28-35
    • /
    • 2003
  • Fatigue tests of transverse fillet weldment were performed under out-of-plane bending loads. Significant increase of the fatigue strength was observed under out-of-plane bending loads, compared to the one under in-plane loads (axial loads). Applicability of the crack propagation analysis using LEFM for the surface crack of fillet weldment were investigated as well, in parallel with the fatigue tests. For the rational assessment of the fatigue strength of welded ship structures where combined stresses of the in-plane axial stress and the out-of-plane bending stress are induced simultaneously due to complexity of applied load and structural geometry, further investigation is recommended for the effect of the out-of-plane bending stress on the fatigue strength of weldment.

A study on Application of UVLS model to decrease the load shadding in Seoul Area (저전압부하차단시스템(UVLS) 모델을 이용한 수도권 부하차단용량 산정에 관한 연구)

  • Kang, Dae-Eon;Lee, Back-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.184-186
    • /
    • 2005
  • Increasement of power demand rapid industrial growth has led the expansion of power system, and it caused construction of large power transmission line(like 765kV T/L) and substation. If there are T/L faults (route contingency etc), it lead to the large scale black out in SEOUL AREA (the center of load). To minimize damage which caused by the large scale black out, KEPCO selects the method of load shadding. In this work, instead of general method of load shadding, We study the application of UVLS model to decrease the load shadding in SEOUL AREA. The study result of using the UVLS model showed that the amont of load shadding can be decreased about 400 MW compare to the existing load shadding system.

  • PDF