• Title/Summary/Keyword: Line-of-Balance Method

Search Result 110, Processing Time 0.023 seconds

The Incipient Deformation Analysis for Plane Strain Open-Die Forging Processes with V-shaped Dies Using the Force Balance Method (힘평형법을 이용한 V-형다이 평면변형 자유형 단조공정의 초기변형 해석)

  • Lee, J.H.;Kim, B.M.
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.10 no.4
    • /
    • pp.109-117
    • /
    • 1993
  • Force balance method is employed to predict forging information such as forging load, tool pressure and normal stress at the surface of tangential velocity discontinuity. The incipient stages of deformation for the plane strain forging of rectangular billets in V-shaped dies of different semi-angles are analysed. To construct an approximate model for the analysis of deformation by the force balance method in the incipient deformation stages, slip-line field is used. When the deformation mode by slip-line method is the same as that by force balance method, the slip-line method and the force balance method give identical solutions. The effects of die angle, coefficient of friction, billet geometries and deforma- tion characteristics are also investigated. In order to verify the validity of force balance analysis, the rigid-plastic finite element simulation for the various forgig parameters are performed and performed and find to be in good agreement.

  • PDF

Vibration Analysis of In-line Three Cylinder Engine with Balance Shaft Using DADS (DADS를 이용한 밸런스 샤프트 장착 직렬 3기통 엔진의 진동 해석)

  • 서권희;민한기;천인범
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.8 no.1
    • /
    • pp.148-156
    • /
    • 2000
  • For the in-line three cylinder engine whose crankshaft has a phase of 120 degrees, the total sum of unbalanced inertia forces occurring in each cylinder will be counterbalanced among three cylinders. However, parts of inertia forces generated at the No.1 and No.3 cylinders will cause a primary moment about the No.2 cylinder. In order to eliminate this out-of-balance moment, a single balance shaft has been attached to the cylinder block so that the engine durability and riding comfort may be further improved. Accordingly, the forced vibration analysis of the in-line three cylinder engine must be implemented to meet the required targets at an early design stage. In this paper, a method to reduce noise and vibration in the 800cc, in-line three cylinder LPG engine is suggested using the multibody dynamic simulation. The static and dynamic balances of the in-line three cylinder engine are investigated analytically. The multibody dynamic model of the in-line three cylinder engine is developed where the inertia properties of connecting rod, crankshaft, and balance shaft are extracted from their FE-models. The combustion pressure within the No.1 cylinder in three significant operating conditions(1500rpm-full load, 4000rpm-full load and 7000rpm-no load)is measured from the actual tests to excite the engine. The vibration velocities at three engine mounts with and without balance shaft are evaluated through the forced vibration analysis. Obviously, it is shown that the vibration of the in-line three cylinder engine with balance shaft is reduced to the acceptable level .

  • PDF

Advanced Depreciation Cost Analysis for a Commercial Pyroprocess Facility in Korea

  • Kim, Sungki;Ko, Wonil;Youn, Saerom;Gao, Ruxing;Chung, Yanghon;Bang, Sungsig
    • Nuclear Engineering and Technology
    • /
    • v.48 no.3
    • /
    • pp.733-743
    • /
    • 2016
  • The purpose of this study is to present a rational depreciation method for a pyroprocess cost calculation. Toward this end, the so-called advanced decelerated depreciation method (ADDM) was developed that complements the limitations of the existing depreciation methods such as the straight-line method and fixed percentage of declining-balance method. ADDM was used to show the trend of the direct material cost and direct labor cost compared to the straight-line or fixed percentage of the declining-balance methods that are often used today. As a result, it was demonstrated that the depreciation cost of the ADDM, which assumed a pyroprocess facility's life period to be 40 years with a deceleration rate of 5%, takes up 4.14% and 27.74% of the pyroprocess unit cost ($781/kg heavy metal) in the $1^{st}$ and final years, respectively. In other words, it was found that the ADDM can cost the pyroprocess facility's capital investment rationally every year. Finally, ADDM's validity was verified by confirming that the sum of the depreciation cost by year, and the sum of the purchasing cost of the building and equipment, are the same.

Optimization Condition for Injection Molding of TV Speaker Grille Using CAE (CAE를 이용한 TV Speaker Grille 사출 성형의 최적화)

  • 김범호;장우진;김정훈;정지원;박영훈
    • Polymer(Korea)
    • /
    • v.25 no.6
    • /
    • pp.855-865
    • /
    • 2001
  • The optimization condition of injection molding for a commercial product of TV speaker grille of A Company was induced using a CAE software of Moldflow. The flow and packing phase analysis was performed by using flow balance, runner balance, and the intermediate one by using the above two balances, which were used for controlling the amount of packing resins into the cavity, Later, the analysis performed by using the measured viscosity (local database) at various shear rates and the results were compared with the computer simulation using the standard database. Flow balance induced minimized weld line resulted in a better appearance and physical properties of the were line, but exhibited a disadvantage of large deformation and gas formation due to over-packing of the molten resin in the center of the speaker grille. Runner balance improved the disadvantage of the flow balance by controlling the amount of molten resin injected from the gate, however resulted reduced mechanical properties and poor appearance of the weld line. However, the modified method induced from the flow and runner balance improved the disadvantages by changing the runner size. In addition, the analyses based on the local database and the standard database were compared. Although the measured viscosity was slightly higher and the temperature distribution was broader than the standard database, no distinct difference was obtained from the analysis using the two different databases.

  • PDF

Lifetime estimation of a covered overhead line conductor

  • Leskinen, Tapio;Kantola, Kari
    • Wind and Structures
    • /
    • v.6 no.4
    • /
    • pp.307-324
    • /
    • 2003
  • The paper presents results of studies concerning wind-induced aeolian vibration and fatigue of a 110 kV covered conductor overhead line. Self-damping measurement techniques are discussed: power method is found to be the most reliable technique. A method for compensating tension variations during the self-damping test is presented. Generally used empirical self-damping power models are enhanced and the different models are compared with each other. The Energy Balance Analysis (EBR) is used to calculate the aeolian vibration amplitudes, which thereafter are converted to bending stress for the calculation of conductor lifetime estimate. The results of EBA are compared with field measurements, Results indicate that adequate lifetime estimates are produced by EBA as well as field measurements. Generally the EBA gives more conservative lifetime expectancy. This is believed to result from the additional damping existing in true suspension structures not taken into account by EBA. Finally, the correctness of the line design is verified using Cigre's safe design tension approach.

Line Balancing for the Mixed Model Assembly Line Considering Processing Time and Physical Workloads (작업시간과 육체적인 작업부하를 고려한 혼합모델 조립공정의 라인밸런싱)

  • Moon, Sung-Min;Kwon, Keun-Seob;Choi, Gyung-Hyun
    • IE interfaces
    • /
    • v.17 no.3
    • /
    • pp.282-293
    • /
    • 2004
  • Line Balancing is the problem to assign tasks to stations while satisfying some managerial viewpoints. Most researches about the Mixed-Model Line Balancing problems are focused on the minimizing the total processing time or the number of workstations. Independently, some research reports consider the balance issues of the physical workloads on the assembly line. In this paper, we are presenting a new mathematical model to accomplish the line balance considering both the processing time and the workloads at the same time. To this, end, we propose an zero-one integer program problem, and we use the Chebyshev Goal Programming approach as the solution method. Some computational test runs are performed to compare the pay-offs between the processing time and the workloads. And, the test results show us that the reliable balanced work schedules can be obtained through the proposed model.

A Stochastic Linear Scheduling Method using Monte Carlo Simulation

  • Soderlund, Chase;Park, Borinara
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.169-173
    • /
    • 2015
  • The linear scheduling method or line-of-balance (LOB) is a popular choice for projects that involve repetitive tasks during project execution. The method, however, produces deterministic schedule that does not convey a range of potential project outcomes under uncertainty. This results from the fact the basic scheduling parameters such as crew production rates are estimated to be deterministic based on single-point value inputs. The current linear scheduling technique, therefore, lacks the capability of reflecting the fluctuating nature of the project operation. In this paper the authors address the issue of how the variability of operation and production rates affects schedule outcomes and show a more realistic description of what might be a realistic picture of typical projects. The authors provide a solution by providing a more effective and comprehensive way of incorporating the crew performance variability using a Monte Carlo simulation technique. The simulation outcomes are discussed in terms of how this stochastic approach can overcome the shortcomings of the conventional linear scheduling technique and provide optimum schedule solutions.

  • PDF

Stochastic Scheduling for Repetitive Construction Projects

  • Lee, Hong-Chul;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.166-168
    • /
    • 2015
  • Line of Balance (LOB) method is suitable to schedule construction projects composed of repetitive activities. Since existing LOB based repetitive project scheduling methods are deterministic, they do not lend themselves to handle uncertainties involved in repetitive construction process. Indeed, existing LOB scheduling dose not handle variability of project performance indicators. In order to bridge the gap between reality and estimation, this study provides a stochastic LOB based scheduling method that allows schedulers for effectively dealing with the uncertainties of a construction project performance. The proposed method retrieves an appropriate probability distribution function (PDF) concerning project completion times, and determines favorable start times of activities. A case study is demonstrated to verify and validate the capability of the proposed method in a repetitive construction project planning.

  • PDF

Optimizing Construction Alternatives for Repetitive Scheduling (반복공정 최적 공법대안 선정 방법)

  • Park, Sang-Min;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.132-133
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

Optimizing Construction Alternatives for Scheduling Repetitive Units

  • Park, Sang-Min;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.158-160
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of existing time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes to cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF