• Title/Summary/Keyword: Line test

Search Result 4,427, Processing Time 0.041 seconds

Test and evaluation on the suitability of operating high speed train in electrified conventional line through test run of HSR-350x (한국형 고속열차를 활용한 기존선 전철화 구간에서 고속열차 운행의 적합성 평가)

  • Mok, Jin-Yong;Kim, Young-Guk;Kim, Ki-Hwan;Cho, Min-Young
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.229-235
    • /
    • 2007
  • The KTX, which have opened the revenue service in April 2004, is operating in Kyoung-Bu high-speed line and electrified conventional Ho-Nam line, and the more the electrification are enlarged, the more the requirement of operating of high speed train would be increased. In this paper, the result of test run and evaluation on the suitability of operating high speed train in electrified conventional line between Dae-jeon and East Dae-gu was reviewed. Evaluation and analysis was executed in specific categories, such as operation & running performance of the train considering vibration characteristics based on UIC 518, ride comfort and current collection, and response sensitivity of ATS device for signalling from track facility. The result of this running test was evaluated and considered as a good practice for revenue operation of high speed train in electrified conventional line between Dae-jeon and Dae-gu.

  • PDF

Vibration Reduction of Pipe Line in Air-conditioner for Railway Vehicle (철도차량용 냉방기 배관계의 진동저감 연구)

  • You, Won-Hee;Jung, Yong-Ho;Koo, Jeong-Seo
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.22 no.10
    • /
    • pp.925-931
    • /
    • 2012
  • The air-conditioner for railway vehicle should have vibration durability in order to operate normally in vehicle running situation. KS R 9144(vibration test methods for railway vehicle parts) is used to verify the vibration durability. The specifications of compressor, condenser and evaporator for air-conditioner in railway vehicle are standardized, but the shape and structure of pipe lines are not specified. Because the air-conditioner handler produces the pipe line arbitrarily, sometimes the pipe line is broken during the vibration durability test. In this research the cause identification and solution of pipe line breaking problem in during the vibration durability test were studied for air-conditioner of railway vehicle(diesel multiple unit). It was found that the natural frequency of pipe line is related to the pipe line breaking by experiment. A new pipe line shape was introduced by using FEA in order to avoid the resonance. The prototype new pipe line was applied to air-conditioner and the natural frequency was measured by experiment in order to verify the resonance avoidance. The vibration reduction of air-conditioner with new pipe line was reviewed by comparing to the air-conditioner with original one.

A Dissimilarity with Dice-Jaro-Winkler Test Case Prioritization Approach for Model-Based Testing in Software Product Line

  • Sulaiman, R. Aduni;Jawawi, Dayang N.A.;Halim, Shahliza Abdul
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.15 no.3
    • /
    • pp.932-951
    • /
    • 2021
  • The effectiveness of testing in Model-based Testing (MBT) for Software Product Line (SPL) can be achieved by considering fault detection in test case. The lack of fault consideration caused test case in test suite to be listed randomly. Test Case Prioritization (TCP) is one of regression techniques that is adaptively capable to detect faults as early as possible by reordering test cases based on fault detection rate. However, there is a lack of studies that measured faults in MBT for SPL. This paper proposes a Test Case Prioritization (TCP) approach based on dissimilarity and string based distance called Last Minimal for Local Maximal Distance (LM-LMD) with Dice-Jaro-Winkler Dissimilarity. LM-LMD with Dice-Jaro-Winkler Dissimilarity adopts Local Maximum Distance as the prioritization algorithm and Dice-Jaro-Winkler similarity measure to evaluate distance among test cases. This work is based on the test case generated from statechart in Software Product Line (SPL) domain context. Our results are promising as LM-LMD with Dice-Jaro-Winkler Dissimilarity outperformed the original Local Maximum Distance, Global Maximum Distance and Enhanced All-yes Configuration algorithm in terms of Average Fault Detection Rate (APFD) and average prioritization time.

Analysis of the acceleration of KHST prototype on the high speed test line (한국형 고속전철의 진동가속도 시험 연구)

  • Park Chankyounn;Kim Youngguk;Kim Seogwon
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.567-573
    • /
    • 2003
  • Korean High Speed Train (KHST) has been tested on high speed line in JungBu site since it was developed in 2002. The data acquisition system was developed to accomplish successfully this on-line test for proving the dynamic Performance of KHST. This system was consist of the personal computers based on National Instrument PXI modules and the test programs based on Labview 6i. This paper shows that this system is efficient to acquire the test data through the multi-channels connected the accelerometers which located in long distance places and flexible to change and add channels for data acquisition. The dynamic analysis of an on-line test is very complicate because the environmental conditions, as examples radius of curve, inclination of the track, tunnels, bridges, and so forth, and running conditions, as examples driving, braking, the number of working motors, and so forth, have an effect on the results. Therefor, the analysis method is important and this paper proposes the efficient procedure graphically, showing the proposed method simplify the accelerations of 5th bogie frame acquired during the on-line test for KHST.

  • PDF

Estimation of Straight Line Stability of a Damaged Surface Combatant through Spiral Maneuver Test Model Considering Asymmetry (비대칭성이 고려된 나선형 시험 모델을 통한 손상 수상함의 직진 안정성 추정)

  • Ha, Jeong Soo;Jeong, Yeon Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.16 no.2
    • /
    • pp.110-117
    • /
    • 2020
  • In this paper, we estimated the straight line stability by performing a 3 degree of freedom spiral test simulation of a intact/damaged surface combatant using the hydrodynamic coefficient obtained through the PMM(Planar motion mechanism) test based on system engineering process. A model ship was ONR Tumblehome and damaged compartment was set on the starboard bow. As a result of conducting a spiral test simulation based on the experimental results of J.Ha (2018), the asymmetric straight line stability due to the damaged compartment was confirmed. In the case of a ship in which the starboard bow was damaged, it was confirmed that it had the characteristic to deflect to the left when going straight. Also, when estimating the straight line stability of a both port and starboard asymmetric surface combatant, a separated equation of motion model that sees the port and starboard as different ships seems suitable.

A Study on OLED display device's line defect test methode (OLED display device의 Line Defect 시험법에 관한 연구)

  • Choi, Young-Tae;Choi, Jai-Rip
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.04a
    • /
    • pp.523-529
    • /
    • 2009
  • The ACF(Anisotropic Conductive Film) is used for bonding Drive IC and OLED display device panel. If ACF bonding process is problem, a malfunction of line defect can occur. Because electric resistance increase between the panel and drive IC after a period of time, drive IC can not supply enough current to the panel. This paper is studied on a method of test for line defect.

  • PDF

A Evaluation of Maintenance History for K-AGT (한국형 경량전철시스템의 유지보수 이력에 대한 평가)

  • Lee, Ho-Yong;Ryu, Sang-Hwan;Cho, Hong-Shik;Cho, Bong-Kwan;Jang, Yul
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1014-1023
    • /
    • 2008
  • The K-AGT test line is managed similarly to revenue operation and operated automatically 120km per day, total 90,000km from August 2004 to December 2007. To enhance reliability of developed system, maintenance information system based on RCM is applied. The maintenance program applied in test line is based on RCM which prevent a fault before it happens and a fault made in test line is analysed by reliability growth test. Vehicle system, power supply system, signalling system, track and infrastructure are built in test line and it is reviewed enhancing system performance and changing designs to commercialize through reliability growth analysis method.

  • PDF

A Type Test of 154 kV Transmission Line Arrester for improvement of lightning performance (내뢰성 향상을 위한 154 kV 송전선용 피뢰기의 성능 시험)

  • Kwak, J.S.;Kang, Y.W.;Woo, J.W.;Shim, E.B.;Kim, Y.S.
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.454-456
    • /
    • 2003
  • This paper describes a type test results of 154 kV transmission line arrester with external gap. The test was carried on surge arrester unit and line arrester with external gap, respectively. Withstand voltage test demonstrate the voltage withstand capability of the line arrester with external series gap under the dry and wet conditions. In insulation coordination test external series gap shall be discharged every time when lightning impulse voltage with the steepness of more than 1500 $kV/{\mu}s$ are applied under the wet condition.

  • PDF

Development and Test of Line-Telemetry DPS for KSLV-I Upper Stage (나로호 상단부 Line-Telemetry 데이터처리시스템 개발 및 시험)

  • Kim, Kwang-Soo;Lee, Soo-Jin;Chung, Eui-Seung
    • Aerospace Engineering and Technology
    • /
    • v.10 no.1
    • /
    • pp.107-115
    • /
    • 2011
  • The line-telemetry data processing system is necessary for monitoring the status of each onboard systems of KSLV-I upper stage during the ground tests and launch preparation. The mission of line-telemetry system is to provide reference telemetry data and to monitor the status of upper stage. The line-telemetry data processing system consists of a PCM acquisition/processing server, a system management server, and 9 monitoring consoles. In this paper, we will describe the overview of onboard remote measurement system, the design of the line-telemetry data processing system, anomaly setup information for indicating alarm signal in case of abnormal occurrence, and the result of the ground test and flight test.

Site Evaluation and Application of the On-line and Off-line Test for the 13[kV] Class Hydropower Generator Stator Windings (13[kV]급 수력발전기 고정자 권선의 운전 및 정지 중 진단시험 현장적용 평가 및 분석)

  • Chang, Jeong-Ho;Lee, Dong-Keun;Lee, Heung-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.11
    • /
    • pp.73-82
    • /
    • 2011
  • The solid insulation system of stator windings in high voltage rotational machines is usually aging in accordance with long time operation. The partial discharge test have been known to check whether insulation deterioration exist or not, and the PD test can effectively diagnose a solid insulation condition regardless of during operation(on-line) or not(off-line). The on-line PD measurement have proven to be a successful technique in monitoring stator insulation condition nowadays. This paper describes the characteristics of comparing the on-line PD measurement data using PDMS-HG(Partial Discharge Monitoring System for Hydro-electric Generator) installed in field with the off-line diagnosis measurement data(insulation resistance, winding resistance, PI, ${\Delta}tan{\delta}$ and PD) on hydro generator(13[kV]) stator windings. These results make good use of managing rotational machines through evaluating the solid insulation condition of stator windings.