In the on-line pre-learning which is applied in this study, on line pre-learning, in-class, post-learning are circulated together in the same experiments. The on-line pre-learning has been tried to 136 students in A junior college in Seoul for 3 years. The effects of their self-regulated learning are as follows. First, the self-regulated learning ability has increased by 0.42 point. The point after the self-regulated learning and before it is 3.24 and 3.66 respectively. Second, cognitive regulation, motivational regulation and behavioral regulation have also increased. Out of them, cognitive control has increased the most. Metacognitive strategy is higher than cognitive strategy. In conclusion, the result shows that the on-line pre-learning is helpful to develop the self-regulated learning ability and it is also suitable to teaching-learning method for junior college.
The Transactions of the Korean Institute of Electrical Engineers
/
v.31
no.7
/
pp.11-17
/
1982
In this paper, a reliable and convenient evaluation method for the adequacy of any radial distribution line's voltage drop is proposed for improvement of the voltage regulation of the distribution line under operation. Using the voltage measurement of the first load branch point and the last point on the given distribution line its average line voltage drop and the line voltage drop variance by pure load variation are computed. And by these values and allowable or required line drop from proper voltage regulation view point, present adequency index and operation improvement index of the line drop are newly introduced for the evaluation of the given distribution line's voltage regulation. As a result of application to the 4 cases of study, the proposed method is proved to be reliable and convenient.
Urban transit operation is to manipulate the vehicle or train of urban transit to be operated on the basis of the installations such as track, power, communication, signaling and so on. It can be performed by manual or automated, or manned or manless operation considering its system built, operation efficiency, safety, etc. Because of the heavy impact directly to the safety of passenger transport, it has been managed strictly by the Regulation for Train Operation of Urban Transit according to Urban Transit Act. However, the present regulation has been basis of the manual operation mainly, it is crossing beyond the limitation of application to the manless operation which is being introduced moment to moment. It is needed increasingly to revise the regulation for the manless operation which is close at hand now. In this paper, we examined and analysed the cases of manless operation of urban transit planed within the country such as Busan 4th Line, Shinbundang Line, Busan-Kimhae Line, etc. based on the present regulation, and proposed the review of considerations to reflec the manless operation to the regulation to be revised.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2015.10a
/
pp.1071-1074
/
2015
Technical regulation of harm prevention for power line communication prescribes the technical matters to protect human and other equipment from power line communication equipment. Unified operation of technical regulation of power line communication and line facility installation is more efficient in content. This paper is to discuss the technical background of national PLC system and the direction of reforming related techinal regulations.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.60
no.3
/
pp.126-132
/
2011
A conventional LDO(Low Dropout Regulator) uses one OPAMP and one signal path. This means that OPAMP's DC Gain and Bandwidth can't optimize simultaneously within usable power. This also appears that regulation property and settling time of LDO can't improve at the same time. Based on this idea, a proposed LDO uses two OPAMP and has two signal path. To improve regulation property, OPAMP where is used in the path which qualities DC gain on a large scale, bandwidth designed narrowly. To improve settling time, OPAMP where is used in the path which qualities DC gain small, bandwidth designed widely. A designed LDO used 0.5um 1P2M process and provided 200mA of output current. A line regulation and load regulation is 12.6mV/V, 0.25mV/mA, respectively. And measured settling time is 1.5us in 5V supply voltage.
While making a vigorous discussion about self-regulation for exponential growth of harmful health information on the Internet, many countries lave made various efforts to select and circulate high quality health information on the Internet. The purpose of this study Is to review the serf-regulation methods of health information on the Internet and to suggest quality control methods of health information on the Internet suitable for Korea. Self-regulation methods of the health information on the Internet include ‘content rating system(or content selection system)’, ‘codes of conduct or guideline’, ‘internet hot-line’, ‘education for information providers and consumers’. Any self-regulation method should be used with other methods. We can regulate health information on the Internet effectively by using both self-regulation methods and compulsive methods such as law. Also information providers, information consumers, specialists, consumer representatives, scholars, governments officers should take part in doing these efforts and make concern.
With the development of industry and the improvement of living standards, better quality in power electric service is required more than ever before. This paper deals with the optimal algorithms for voltage regulation in the case where Distributed Storage and Generation (DSG) systems are operated in distribution systems. It is very difficult to handle the interconnection issues for proper voltage managements, because the randomness of the load variations and the irregular operation of DSG should be considered. This paper proposes the optimal on-line real time voltage regulation methods in power distribution systems interconnected with the DSG systems. In order to deliver suitable voltage to as many customers as possible, the optimal sending voltage should be decided by the effective voltage regulation method by using artificial neural networks to consider the rapid load variation and random operation characteristics of DSG systems. The simulation results from a case study show that the proposed method can be a practical tool for the voltage regulation in distribution systems including many DSG systems.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.48
no.6
/
pp.699-703
/
1999
It is known that the LDC(Line-Drop Compensator) becomes to lose the function of proper voltage regulation for its load currents due to the real and reactive power generated by DGS(Dispersed Generation System), when DGS is introduced into the power distribution system of which the voltage is controlled by LDC. Therefore, in that case, it is very difficult to regulate the distribution line voltage properly by using LDC. One possible solution for this problem is the real-time voltage regulation method which is to optimally regulate the sending-end voltage in real-time by collecting the real-time load data of each load data of each load section between measuring points and by calculating the optimal seding-end voltage value from them. For this, we must know the real-time load data of each load section. In this paper, a modeling method of representing a load section on high voltage line with DGSs as an equivalent lumped load is proposed for gaining the real-time load data. In addition a method of locating the measuring points is proposed. Then, these proposed methods are evaluated through computer simulations.
This paper presents the DQ transfomation space space vector modulation method to devel control algorithm of distribu STATCON(STATic CONdenser) for line volt regulation, dc link voltage regulation harmonics compensation. The Performance an of a PI with ramp comparision and synchro reference frame current controller is carried Based on these analysis, the control perform are desirable to compensate the harmonics a regulate dc link and line voltage of Distrib line.
This paper deals with voltage regulation at the power Distribution system interconnected with DSG. Modern distribution substation adopt LDC method as the voltage regulation method to deliver suitable voltages to many customers. However, the operations of DSG interconnected with distribution system, the customers' voltage violate the permissible voltage limits. Therefore, to deliver suitable voltage to many customers at the distribution substation, an advanced voltage regulation method is required. In this paper, the on line realtime MLDC (Multiple Line Drop compensation) method, considered daedband and hysterical tap changing of the ULTC, is proposed. The result from a simulation study shows that the proposed method can be practical applications for the voltage regulation at the distribution system interconnected with DSG and unbalanced load pattern among feeders.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.