• 제목/요약/키워드: Line Balancing

검색결과 209건 처리시간 0.022초

Line Balancing을 위한 최적 Cycle Time의 결정방법 (A Study on the Determination of Optimum Cycle Time for Assembly Line Balancing)

  • 이근부
    • 산업경영시스템학회지
    • /
    • 제3권3호
    • /
    • pp.35-39
    • /
    • 1980
  • Although the product line produces a large volume of goods in a relatively short time, once the product line is established there are numerous problems that arise in connection with this product line. One of these problems is the problem of balancing operations or stations in terms of equal times and in terms of the times required to meet the desered rate of production. The objective of line balancing is minimizing the idle time on the line for all combinations of work stations subject to certain restrictions. In general, there are two types of line-balancing situations : (1) assembly line balancing and (2) fabrication line balancing. Two approaches to the assembly line balancing problem have been used. The first assumes a filed cycle time and find the optimum number of work stations. The second approach to the assembly line balancing problem assumes the number of work stations to be fixed and systematically coverages on a solution which minimizes the total delay time by minimizing the cycle time. Here the cycle time is determined by the longest station time. In this paper, by using the second approach method, a general mathematical model, problem solutions, and computer program for the assembly line balancing problem is presented. Data used is obtained from the company which has been confronted with many problems arising in connection with their assembly line.

  • PDF

전후 처리 기능을 포함하는 조립라인 설계 방법론 (A Study on the Assembly Line Design Tool with a Pre/Post Process)

  • 문병훈;최성훈
    • 산업경영시스템학회지
    • /
    • 제37권4호
    • /
    • pp.98-105
    • /
    • 2014
  • According to a simple survey on the current status of the assembly line design, it was found that trial and error methods on the basis of experiences have been used mainly in domestic manufacturing industries, even though there exist a lot of excellent line balancing studies. It seems that more practical researches should be carried out to develop user-oriented line balancing tools especially for small and medium-sized enterprises. This study presents a design of the line balancing tool which can support the line balancing tasks of nonspecialists. The proposed design tool is composed of three major modules: pre-process, line balancing, and post-process. In particular, pre-process and post-process are newly proposed to increase its ease of use. We applied the proposed design to a test problem and test result showed that our practical method may contribute to enhance the efficiency of production operations management.

조립라인의 밸런싱을 고려한 자동 조립 순서 추론 (Generation of Robotic Assembly Aequences with Consideration of Line Balancing Using a Simulated Annealing)

  • 홍대선;조형석
    • 제어로봇시스템학회논문지
    • /
    • 제1권2호
    • /
    • pp.112-118
    • /
    • 1995
  • In designing assembly lines, it is required that the lines should not only meet the demand of the product, but also minimize the assembly cost associated with the line. For such a purpose, numerous research efforts have been made on either the assembly sequence generation or the assembly line balancing. However, the works dealing with both the research problems have been seldom reported in literature. When assembly sequences are generated without consideration of line balancing, additional cost may be incurred, because the sequences may not guarantee the minimum number of workstations. Therefore, it is essential to consider line balancing in the generation of cost-effective assembly sequences. To incorporate the two research problems into one, this paper treats a single-model and deterministic (SMD) assembly line balancing (ALB) problem, and proposes a new method for generating line-balanced robotic assembly sequences by using a simulated annealing. In this method, an energy function is derived in consideration of the satisfaction of assembly constraints, and the minimization of both the assembly cost and the idle time. Then, the energy function is iteratively minimized and occasionally perturbed by the simulated annealing. When no further change in energy occurs, an assembly sequence with consideration of line balancing is finally found. To show the effectiveness of the proposed scheme, a case study for an electrical relay is presented.

  • PDF

공정균형기법에 의한 실증적 연구 (A Practical Study on the Line Balancing)

  • 강경식;김대식
    • 산업경영시스템학회지
    • /
    • 제8권11호
    • /
    • pp.17-25
    • /
    • 1985
  • In these days the industrial management are characterized by mass production. Mass production which is not possible without the rationalization in the process of production and the efficient scale of management needs development of technical administration. The object of this study is set up on the rationalization in the process of production. And this rationalization is a means to the aim of industrial management. So as to realize the rationalization in the process of production, we should think on plan of production and the line of balancing in processes of work. The line of balancing is considered as one of very valuable administration methods. The line of balancing that controls capacities and loads so that processes of work might balance in each other makes away with happenings of idleness and stagnation during the process of work As a natural consequence it follows (1) shortening in the period of Production, (2) more efficient, (3) removing the lots of tine and matter, (4) more efficient using in elements for production. Therefore, through the labour productivity and the efficiency of the process of production increased by these effects, the line of balancing was intended to curtail the basic cost. Though the previously said line of balancing could be applied to production, it should not be said that we can completely balance in each lines of work. In other words it is impossible that the line of balancing is completely executed in every lines of work. For that reason, we should arrange the level of balancing in lines. Nowaday, in our country, it is true that the line of balancing is hardly executed at manufacturing industries. Therefore if we execute and apply the line of balancing to manufacturing industries and the larger field as well , we could curtail the basic cost, through which we could reinforce not only the international competative power but increase the labour productivity. As a result, by these effects, we would rationalize the industrial management.

  • PDF

TFT-LCD 공장의 라인 밸런싱을 고려한 MPS 수립에 관한 연구 (A Study of Master Production Scheduling Scheme in TFT-LCD Factory considering Line Balancing)

  • 원대일;백종관;김성식
    • 산업공학
    • /
    • 제16권4호
    • /
    • pp.463-472
    • /
    • 2003
  • In this study we consider the problem of MPS(master production planning) of TFT-LCD(Thin Film Transistor - Liquid Crystal Display) production factory. Due to the complexities of the TFT-LCD production processes, it is difficult to build effective MPS. This study presents an algorithm having a concept of IDPQ(Ideal Daily Production Quantity) that considers line balancing of TFT-LCD production process. In general, the MPS building procedure does not consider line balancing in non-bottleneck processes. MPS without considering line balancing may make ineffective schedule. We present algorithms for building MPS considering factory capacity and line balancing according to the sales order.

Design of flexible assembly line for printed circuit board(PCB) manufacturing of amdahl company

  • Park, Kwangtae;Adiga, Sadashiv
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1992년도 춘계공동학술대회 발표논문 및 초록집; 울산대학교, 울산; 01월 02일 May 1992
    • /
    • pp.159-168
    • /
    • 1992
  • 생산라인의 line balancing이 흐름생산에 있어서 일관된 생산을 하기 위한 필수조건이다. 여러 다양한 제품을 생산하는 printed circuit board(PCB) 공장에서의 line balancing을 얻기 위해서는 mixed model line balancing절차를 설명하고자 한다.

  • PDF

자기베어링을 이용한 잔류질량불균형이 존재하는 초고속 회전체의 온라인 밸런싱 (On-line Balancing of a Ultra-high speed Rotor with Residual Unbalance)

  • 송상호
    • 한국생산제조학회지
    • /
    • 제7권1호
    • /
    • pp.51-57
    • /
    • 1998
  • In order to minimize vibration problems of rotating machinery rotors have been assembled through balancing machines. Since perfect balancing is impossible, residual unbalances cause serious vibration while the rotor is in high speed region. To minimize unbalance effects of magnetic bearing systems (AMB) during rotation on-line balancing methodology was studied. Unbalances were considered as disturbances of the system. The disturbance observer was used to estimate unbalance force from measurable state and input variables. Balancing inputs computed according to LQR and outputs of the observer were applied to eliminate unbalances during high speed rotation of the AMB. the effectiveness of the on-line balancing was verified through numerical simulations.

  • PDF

직렬 조립라인의 라인밸런싱에 관한 연구 (A study on line balancing for serial assembly line)

  • 장석호;이노성;안인석;박승규;최준열;우광방
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1993년도 한국자동제어학술회의논문집(국내학술편); Seoul National University, Seoul; 20-22 Oct. 1993
    • /
    • pp.1123-1128
    • /
    • 1993
  • In this paper, utilizing the line balancing algorithm proposed to deal with various situations of automated assembly line, the optimal solution can be derived by the branch and bound method of analysis. By the application of line balancing algorithm to telephone assembly line, thoughput is improved by 3.38%. Therefore, in the proposed line, blicking phenomena were reduced and smooth line-flow was achieved, and uniform distribution of utilization rate of each machine is obtained.

  • PDF

유전 알고리듬을 이용한 U형태 혼합모델에서의 작업시간과 육체적 작업부하를 고려한 최적 라인밸런싱 (A U-shape Mixed Model Assembly Line Balancing Problem for Processing Time and Physical Workload Using the Genetic Algorithm)

  • 최경현;김찬우
    • 산업경영시스템학회지
    • /
    • 제28권3호
    • /
    • pp.98-108
    • /
    • 2005
  • The assembly line balancing problem has been focused by many research works because the efficient management of the assembly line might influence not only the quality of the products but also the working conditions for the workers. This paper deals with U-shape mixed-model assembly line balancing and considers both the processing time and the physical workloads. We suggest the goal programming approach for this situation and to overcome some difficulties of finding optimal solution, we adopt the genetic algorithm that is one of the most promising solution techniques. We tested several test problems and present the results that indicate some improvement for the line balancing as well as the stable performance of the algorithm.

라인밸런싱 이론을 활용한 축구시스템의 개발 (A Development of Soccer System Using Line Balancing)

  • 최동순
    • 한국산업경영시스템학회:학술대회논문집
    • /
    • 한국산업경영시스템학회 2002년도 춘계학술대회
    • /
    • pp.309-317
    • /
    • 2002
  • Line Balancing is the method enflowing workparts smoothly by balancing the worktime of processes, and reduces the cycle time. Soccer is the sports attacking the opposite team and defending a friendly area efficiently by means of ball. To accomplish this purpose, space balancing is the necessary condition. Soccer 'system' what we called 'formation' is the basic frame to balance the space of playground, operate the tactics. This paper introduces 'Dual Hexagon System', a quite new system in soccer, using line balancing principle. It also explains the correlations between line balancing and dual hexagon system, distinctions and position names of dual hexagon system, and then suggests success factors.

  • PDF