DOI QR코드

DOI QR Code

전후 처리 기능을 포함하는 조립라인 설계 방법론

A Study on the Assembly Line Design Tool with a Pre/Post Process

  • 문병훈 (상명대학교 기술융복합학과) ;
  • 최성훈 (상명대학교 경영공학과)
  • 투고 : 2014.11.10
  • 심사 : 2014.11.26
  • 발행 : 2014.12.31

초록

According to a simple survey on the current status of the assembly line design, it was found that trial and error methods on the basis of experiences have been used mainly in domestic manufacturing industries, even though there exist a lot of excellent line balancing studies. It seems that more practical researches should be carried out to develop user-oriented line balancing tools especially for small and medium-sized enterprises. This study presents a design of the line balancing tool which can support the line balancing tasks of nonspecialists. The proposed design tool is composed of three major modules: pre-process, line balancing, and post-process. In particular, pre-process and post-process are newly proposed to increase its ease of use. We applied the proposed design to a test problem and test result showed that our practical method may contribute to enhance the efficiency of production operations management.

키워드

참고문헌

  1. AB&S, Introduction to Time Prism, www.timeprism. co.kr, 2014.
  2. ALB-Research Group, http://www.assembly-line- balancing. de, 2014.
  3. Atworth Co. Ltd., VITAMAX Users' Manual, Seoul : Atworth Co. Ltd., 2010.
  4. Becker, C. and Scholl, A., A survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research, 2006, Vol. 168, p 694-715. https://doi.org/10.1016/j.ejor.2004.07.023
  5. Becker, C. and Scholl, A., State-of-the-art exact and heuristic solution procedures for simple assembly line balancing. European Journal of Operational Research, 2006, Vol. 168, p 666-693. https://doi.org/10.1016/j.ejor.2004.07.022
  6. Choi, S.H. and Mo, C.W., A Visual Motion and Time Study Software, VITAMAX. Journal of the Society of Korea Industrial and Systems Engineering, 2010, Vol. 33, No. 2, p 33-38.
  7. Gurevsky, E., Battaia, O., and Dolgui, A., Stability measure for a generalized assembly line balancing problem. Discrete Applied Mathematics, 2013, Vol. 161, p 37-394.
  8. Hwang, H., Work Study (2nd ed), Seoul : Youngchi Publishers, 2005.
  9. IBM, Digital Process Plan Solution, PLM Solution Roadshow, 2009.
  10. JIET, http://www.jiet.co.jp, 2014.
  11. Scholl, A. and Klein, R., SALOME : A bidirectional branch and bound procedure for assembly line balancing. INFORMS Journal on Computing, 1997, Vol. 9, p 319-334. https://doi.org/10.1287/ijoc.9.4.319
  12. Song, W.S. and Kim, Y.G., Two-Sided Assembly Line Balancing with Preemptive Multiple Goals Using an Evolutionary Algorithm. Korean Management Science Review, 2009, Vol. 34, No. 2, p 101-111.
  13. Topaloglu, S., Salum, L., and Supciller, A.A., Rulebased modeling and constraint programming based solution of the assembly line balancing problem. Expert Systems with Applications, 2012, Vol. 39, p 3484-3493. https://doi.org/10.1016/j.eswa.2011.09.038
  14. Whitehouse, G.E., IIE Microsoftware : Production Control (IBM PC), Atlanta, GA : Institute of Industrial Engineers, 1983.