• Title/Summary/Keyword: Line

Search Result 40,335, Processing Time 0.051 seconds

The Study on Application of Flying Inspection Method for the 22.9kV Distribution Line (22.9kV 배전선로 비행점검 방법 적용에 관한 연구)

  • Zhang, Jeong-Il;Kang, Byoung-Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.2
    • /
    • pp.194-198
    • /
    • 2012
  • This paper describes flying inspection apparatus for 22.9kV distribution line. This apparatus is composed of multi-copter(more than 4 propellers), camcorder and remote controller. The existing inspections, such as hot-line inspection job and optical inspection method and distribution Line Checking Robot, have many restrictions. A electric working vehicle and hot-line job license are essential in hot-line inspection job. Besides its high cost, it can't be applied to the electric pole over 18m and road-blocked area. Optical method can't inspect upper side of electric facilities mounted on the electric pole. Robot method can't be applied to the corroded overhead earth wire and nothing of overhead earth wire. To solve the problems, in Korea Electric Power Co., we have applied flying inspection apparatus to the 22.9kV distribution line. The results of trial application show that this paper is practical and effective for the inspection technical method in 22.9kV distribution line

Accuracy Improvement of Screen Printed Ag Paste Patterns on Anodized Al for Electroless Ni Plating (무전해 Ni 도금을 위한 양극 산화막위에 스크린 인쇄된 Ag 페이스트 패턴의 정밀도 개선)

  • Lee, Youn-Seoung;Rha, Sa-Kyun
    • Korean Journal of Materials Research
    • /
    • v.27 no.8
    • /
    • pp.397-402
    • /
    • 2017
  • We used an etching process to control the line-width of screen printed Ag paste patterns. Ag paste was printed on anodized Al substrate to produce a high power LED. In general, Ag paste spreads or diffuses on anodized Al substrate in the process of screen printing; therefore, the line-width of the printed Ag paste pattern increases in contrast with the ideal line-width of the pattern. Smudges of Ag paste on anodized Al substrate were removed by neutral etching process without surface damage of the anodized Al substrate. Accordingly, the line-width of the printed Ag paste pattern was controlled as close as possible to the ideal line-width. When the etched Ag paste pattern was used as a seed layer for electroless Ni plating, the line width of the plated Ni film was similar to the line-width of the etched Ag paste pattern. Finally, in pattern formation by Ag paste screen printing, we found that the accuracy of the line-width of the pattern can be effectively improved by using an etching process before electroless Ni plating.

Parameter Study of Position Keeping for Semi-submersible Offshore Structure by Tugs (Tug에 의한 반잠수식 해양 구조물 위치 유지를 위한 제반 파라메터 검토)

  • Lee, Jin Ho;Park, Jun Heum;Jang, Hag Soo
    • Journal of Ocean Engineering and Technology
    • /
    • v.28 no.4
    • /
    • pp.274-279
    • /
    • 2014
  • This paper investigates the line dynamic forces connecting tugs and a floater, where the planar motion of the floater is due to the weather criteria during the position keeping of the offshore structure by tugs. The analysis situation consists of the position keeping states for the seabed mooring line connection work of the offshore structure at the offshore site. Specifically, the decision about the tug power capacity for the position keeping is essential and depends on the weather criteria, line characteristics, length of line, etc. The planar motion of the structure is constrained by the interference of the installation vessel's operational range, behavior of the underwater fairlead, and other surrounding structures. In this paper, the tug line forces and planar motion of an offshore structure are summarized dependent on the tug line length and line material characteristics in the states fora given floater draft and weather criteria. The tug line dynamic forces and planar motion evaluated here will be used to determine the proper tug power and clearance of an offshore structure.

Measurements of Defects after Machining CFRP Holes Using High Speed Line Scan (고속 라인 스캔 방식을 이용한 CFRP 가공 홀 표면 및 내부 결함 검사)

  • Kim, Teaggyum;Kyung, Daesu;Son, Unchul;Park, Sun-Young
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.33 no.6
    • /
    • pp.459-467
    • /
    • 2016
  • Using a line scan camera and a Galvano mirror, we constructed a high-speed line-scanning microscope that can generate 2D images ($8000{\times}8000pixels$) without any moving parts. The line scanner consists of a Galvano mirror and a cylindrical lens, which creates a line focus that sweeps over the sample. The measured resolutions in the x (perpendicular to line focus) and y (parallel to line focus) directions are both $2{\mu}m$, with a 2X scan lens and a 3X relay lens. This optical system is useful for measuring defects, such as spalling, chipping, delamination, etc., on the surface of carbon fiber reinforced plastic (CFRP) holes after machining in conjunction with adjustments in the angle of LED lighting. Defects on the inner wall of holes are measured by line confocal laser scanning. This confocal method will be useful for analyzing defects after CFRP machining and for fast 3D image reconstruction.

Analysis and Measurement of Lightning Parameters on Subscriber Telecommunication Lines (가입자 통신 선로에서의 뇌격 파라미터 분석과 측정)

  • Oh, Ho-Seok;Park, Dong-Chul
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.18 no.11
    • /
    • pp.1309-1317
    • /
    • 2007
  • In this paper, the Induced voltage on transmission line by lightning was calculated using FDTD method and the lightning parameters such as peak voltage, rise time, and decay time for the lightning location and line length were analyzed. To verify the results, lightning induced voltage was measured in the field using real telecommunication line. Results from the collected data were compared with the calculated results. It was found that the rise time and the decay time were increased as the line length and the distance between the line and lightning location were increased. Also, the peak voltage was affected more by the overhead line length than by the total line length, while the rise time and the decay time were more affected by the total line length.

Scheduling Algorithm to Minimize Total Error for Imprecise On-Line Tasks

  • Song, Gi-Hyeon
    • Journal of Korea Multimedia Society
    • /
    • v.10 no.12
    • /
    • pp.1741-1751
    • /
    • 2007
  • The imprecise computation technique ensures that all time-critical tasks produce their results before their deadlines by trading off the quality of the results for the computation time requirements of the tasks. In the imprecise computation, most scheduling problems of satisfying both 0/1 constraints and timing constraints, while the total error is minimized, are NP-complete when the optional tasks have arbitrary processing times. In the previous studies, the reasonable strategies of scheduling tasks with the 0/1 constraints on uniprocessors and multiprocessors for minimizing the total error are proposed. But, these algorithms are all off-line algorithms. Then, in the on-line scheduling, NORA(No Off-line tasks and on-line tasks Ready upon Arrival) algorithm can find a schedule with the minimum total error. In NORA algorithm, EDF(Earliest Deadline First) strategy is adopted in the scheduling of optional tasks. On the other hand, for the task system with 0/1 constraints, NORA algorithm may not suitable any more for minimizing total error of the imprecise tasks. Therefore, in this paper, an on-line algorithm is proposed to minimize total error for the imprecise real-time task system with 0/1 constraints. This algorithm is suitable for the imprecise on-line system with 0/1 constraints. Next, to evaluate performance of this algorithm, a series of experiments are done. As a consequence of the performance comparison, it has been concluded that IOSMTE(Imprecise On-line Scheduling to Minimize Total Error) algorithm proposed in this paper outperforms LOF(Longest Optional First) strategy and SOF(Shortest Optional First) strategy for the most cases.

  • PDF

Reliability Improvement of Insulation Diagnosis Using the Hydro-Generator On-Line Partial Discharge Monitoring System (수력발전기 On-line 부분방전 측정 시스템을 이용한 절연상태 진단의 신뢰성 향상)

  • Ok, Yeon-Ho;Lee, Eun-Woong;Lim, Jae-Il;Park, Ji-Kun;Kwak, Won-Ku;Lee, Jae-Heung;Shin, Jae-Pil;Shin, Byoung-Chol
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.4
    • /
    • pp.469-475
    • /
    • 2009
  • Accident dangerousness of domestic hydro power generators which are operated in Korea is on the increase because of use at the long term. On this, the Off-line diagnosis techniques developed to the On-line by continued domestic technical development since 2000. Especially, On-line insulation diagnosis of domestic hydro power generator is possible by localization of partial electric discharge sensor and On-line insulation diagnosis system. This paper shows the diagnosis result that is applied localized Ceramic Coupler and PDMS-HG(Partial Discharge Monitoring System for Hydro Generator) at four Chung-ju hydro Generator used for 25 years. Particularly, the confidence of insulation diagnosis is improved by using high frequency filter and sampling the partial discharge signals which occur in site. For reviewing the confidence of On-Line insulation diagnosis system, we measured the outside noises and partial discharge signals during practical operation by using the partial discharge diagnosis system of the Full A/D process. And we reviewed the confidence of the On-Line insulation diagnosis system by comparing and analyzing these data.

Design and Implementation of Fishing Gear Type Setting System for Long Line (연승어업을 위한 어구 유형 설정 시스템의 설계 및 구현)

  • 이태오;윤희철;임재홍
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.04a
    • /
    • pp.111-116
    • /
    • 2004
  • A fishing gear is an used tool to achieve fishery effectively. Especially, long line is fishery method to confect branch line to fixed space to main line and bind fishhook 1 in branch line end. This paper presents the design and implementation of fishing gear type setting system for fishing gear layout management in the long line work. In this paper, we design overall fishing gear type setting system. For this purpose, the modules such as system user and communication environment setting module, fishing gear type setting module, module of fishing gear shooting model are designed and implemented. For the validity evaluation of this paper, fishing gear type design and shooting process are implemented and tested.

  • PDF

Analysis of the electrostatic induction voltage and electromagnetic induction current on the Parallel Circuit in 765kV Double Circuit Transmission Line (765kV 2회선 송전선로를 765kV 및 345kV로 병행운전시 유도현상 예측)

  • Woo, J.W.;Shim, E.B.;Kwak, J.S.;Jeon, M.R.;Kim, K.I.;Kim, T.O.
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.169-171
    • /
    • 2002
  • The western route of KEPCO's 765kV transmission line has been tentatively operating as 345kV voltage before commercial operation. After finishing the test operation of 765kV substation in 2002. KEPCO decided to operate the 765kV line for commercial operation. During the applying of 765kV voltage to the transmission line, double circuit transmission line will be operated with two voltage grades of 765kV and 345kV. Because the earthing switch is installed on both end of transmission line, we had estimated the electrostatic induction voltage and electromagnetic induction current before the line energizing in order to confirm the ratings of earthing switch. The induced voltage and current is very important for the maintenance of parallel circuit. This paper describes the simulation study of electrical phenomena such as electrostatic induction voltage from the parallel line and electromagnetic induction current from the parallel circuit. The transmission line model was developed by EMTP (Electro-Magnetic Transient Program).

  • PDF

Characteristics of Insertion Loss of Transmission Line with Different Line Length Crossing a Rectangular Aperture in a Backplane (백 플레인의 개구를 통과하는 길이가 다른 전송 선로의 삽입 손실 특성)

  • Jung, Sung-Woo;Kim, Ki-Chai
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.19 no.2
    • /
    • pp.237-243
    • /
    • 2008
  • This paper presents the backplane effects for two-wire transmission line with different line length crossing the rectangular aperture in an infinite ground backplane. The FDTD method is used to determine the characteristics of the backplane insertion loss and return loss of the transmission line in accordance with the transmission line spacing and additional wire lengths. The results show that the insertion gain is obtained for the narrow spacing of the transmission line and the insertion loss is appeared for the transmission line with the additional wire The measurements of return loss are performed to verify the theoretical analysis.