1 |
Hancox, M., 2011. Towing, Positioning and Hook-up for Offhore Production - Oilfield Seamanship Series Volume 8. Clarkson Research Services Ltd.
|
2 |
Lee, J.H., 2011. Analytical Research of Topside Installation in Mating Phase with Crane Vessel. Journal of Ocean Engineering and Technology, 25(4), 1-6.
과학기술학회마을
DOI
ScienceOn
|
3 |
Lee, J.H., Jung, H.S., Kim, B.W., 2013. Evaluation of Mating Dynamic Forces of Semi-submersible Offshore Structure Topside Module. Journal of Ocean Engineering and Technology, 27(1), 9-15.
과학기술학회마을
DOI
ScienceOn
|
4 |
Nachlinger, R. 2013. Reference Manual for MOSES. Ultramarine, Inc.
|
5 |
Chakrabarti, S.K., 2005. Handbook Of Offshore Engineering - Volumn 2. Elsevier.
|
6 |
Gerwick, B.C., 2007. Construction of Marine and Offshore Structures. Third Edition, CRC Press.
|
7 |
Hancox, M., 1997. Towng - Oilfield Seamanship Series Volume 4. Oilfield Publications.
|