• Title/Summary/Keyword: Limited Time

Search Result 5,417, Processing Time 0.031 seconds

Multitrack run-length limited codes for intertrack interference channels (트랙간 간섭 채널을 위한 다중트랙 RLL(Run-length Limited) 코드)

  • 이재진
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.22 no.7
    • /
    • pp.1559-1565
    • /
    • 1997
  • A new multitrack RLL codes with immunity to intertrack interference (ITI) is proposed. This code takes aim at a high density storage channels by reducing the track width and/or guard bands between tracks since it prevents transition in neighboring tracks at the same time epoch. The capacities of the codes are found for each maximum and minimum constraint pair.

  • PDF

Challenges to Prevent in Practice for Effective Cost and Time Control of Construction Projects

  • Olawale, Yakubu A.
    • Journal of Construction Engineering and Project Management
    • /
    • v.10 no.1
    • /
    • pp.16-32
    • /
    • 2020
  • Cost and time control of projects is important in preventing project failure. However, achieving effective cost and time control in practice is often challenging. The challenges of project cost and time control in practice are investigated by carrying out a questionnaire survey on the top 150 construction contractors in the UK followed by in-depth semi-structured interviews of practitioners from 15 construction companies in the country. Quantitative analysis reveals that design change is the most important factor inhibiting the ability of UK contractors from effectively controlling both the cost and time of construction projects. Four of the top five factors inhibiting effective cost control are also the top factors inhibiting effective time control albeit in a different order. These top factors-design changes, inaccurate evaluation of project time/duration, risk and uncertainty, non-performance of subcontractors and nominated suppliers were also found to be endogenous factors to the project. Additionally, qualitative analysis of the interviews reveals 16 key challenges to prevent for effective project cost and time control in practice. These are classified into four categorised based on where they stem from as follows; from the organisation (1. Lack of integration of cost and time during project control, 2. lack of management buy-in, 3. complicated project control systems and processes, 4. lack of a project control training regime); from the construction management/project management approach (5. Lapses in integration of interfaces, 6. project control not being implemented from the early stages of a project, 7. inefficient utilisation and control of labour, 8. limited time devoted to planning how a project will be controlled at the outset); from the client; (9. Excessive authorisation gates, 10. use of adversarial and non-collaborative forms of contracts, 11. communication problems within client set-up, 12. obstructive client representatives) and; from the project team (13. Lack of detailed/complete design, 14. lack of trust among the project partners, 15. limited time devoted to project control on site, 16. non-factual reporting). The study posits that knowledge of these project control inhibiting factors and challenges is the first step at ensuring they are avoided and enable the implementation of a more effective project cost and time control process in practice.

A Trajectory Identification Technique for Two Rotating Sound Sources with Different Frequencies (서로 다른 주파수를 갖는 두 개의 회전음원의 위치추적에 대한 연구)

  • Lee, Jong-Hyun;Lee, Ja-Hyung;Rhee, Wook;Choi, Jong-Soo
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.19 no.7
    • /
    • pp.710-718
    • /
    • 2009
  • The time difference of arrival(TDOA) algorithm is being used widely for identifying the location of a source emanating either electrical or acoustic signal. It's application areas will not be limited to identifying the source at a fixed location, for example the origin of an earthquake, but will also include the trajectory monitoring for a moving source equipped with a GPS sensor. Most of the TDOA algorithm uses time correlation technique to find the time delay between received signals, and therefore difficult to be used for identifying the location of multiple sources. In this paper a TDOA algorithm based on cross-spectrum is developed to find the trajectory of two sound sources with different frequencies. Although its application is limited to for the sources on a disk plane, it can be applied for identifying the locations of more than two sources simultaneously.

Regular File Access of Embedded System Using Flash Memory as a Storage (플래시 메모리를 저장매체로 사용하는 임베디드 시스템에서의 정규파일 접근)

  • 이은주;박현주
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.1
    • /
    • pp.189-200
    • /
    • 2004
  • Recently Flash Memory which is small and low-powered is widely used as a storage of embedded system, because an embedded system requests portability and a fast response. To resolve a difference of access time between a storage and RAM, Linux is using disk caching which copies a part of file on disk into RAM. It is not also an exception on embedded system. A READ access-time of flash memory is similar to RAMs. So, when a process on an embedded system reads data, it is similar to the time to access cached data in RAM and to access directly data on a flash memory. On the embedded system using limited memory, using a disk cache is that wastes much time and memory spaces to manage it and can not reflects the characteristic of a flash memory. This paper proposes the regular file access of limited using a page cache in the file system based on a flash memory and reflects the characteristic of a flash memory. The proposed algorithm minimizes power consumption because access numbers of the RAM are reduced and doesn't waste a memory space because it accesses directly to a flash memory Therefore, the performance improvement of the system applying the proposed algorithm is expected.

  • PDF

Applications of Rotating Noise Source Positioning Using TDOA Algorithm (회전하는 소음원의 위치추적에 대한 TDOA기법의 적용)

  • Lee, Jong-Hyun;Lee, Ja-Hyung;Rhee, Wook;Choi, Jong-Soo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2009.04a
    • /
    • pp.483-489
    • /
    • 2009
  • The Time Difference of Arrival (TDOA) algorithm is being used widely for identifying the location of a source emanating either electrical or acoustic signal. It's application areas will not be limited to identifying the source at a fixed location, for example the origin of an earthquake, but will also include the trajectory monitoring for a moving source equipped with a GPS sensor. Most of the TDOA algorithm uses time correlation technique to find the time delay between received signals, and therefore difficult to be used for identifying the location of multiple sources. In this paper a TDOA algorithm based on cross-spectrum is developed to find the trajectory of two sound sources with different frequencies. Although its application is limited to for the sources on a disk plane, but it can be applied for identifying the locations of more than two sources simultaneously.

  • PDF

Optimized Charging in Large-Scale Deployed WSNs with Mobile Charger

  • Qin, Zhenquan;Lu, Bingxian;Zhu, Ming;Sun, Liang;Shu, Lei
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.10 no.12
    • /
    • pp.5307-5327
    • /
    • 2016
  • Restricted by finite battery energy, traditional wireless sensor networks (WSNs) can only maintain for a limited period of time, resulting in serious performance bottleneck in long-term deployment of WSN. Fortunately, the advancement in the wireless energy transfer technology provides a potential to free WSNs from limited energy supply and remain perpetual operational. A mobile charger called wireless charging vehicle (WCV) is employed to periodically charge each sensor node and keep its energy level above the minimum threshold. Aiming at maximizing the ratio of the WCV's vocation time over the cycle time as well as guaranteeing the perpetual operation of networks, we propose a feasible and optimal solution to this issue within the context of a real-time large-scale deployed WSN. First, we develop two different types of charging cycles: initialization cycles and renewable cycles and give relevant algorithms to construct these two cycles for each sensor node. We then formulate the optimization problem into an optimal construction algorithm and prove its correctness through theoretical analysis. Finally, we conduct extensive simulations to demonstrate the effectiveness of our proposed algorithms.

Development of Processor Real-Time Monitoring Software for Drone Flight Control Computer Based on NUTTX (NUTTX 기반 드론 비행조종컴퓨터의 통합시험을 위한 프로세서 모니터링 연구)

  • Choi Jinwon
    • Journal of Platform Technology
    • /
    • v.10 no.4
    • /
    • pp.62-69
    • /
    • 2022
  • Flight control systems installed on unmanned aircraft require thorough verification from the design stage. This verification is made through the integrated flight control test environment. Typically, a debugger is used to monitor the internal state of a flight control computer in real time. Emulator with a real-time memory monitor and trace is relatively expensive. The JTAG Emulator is unable to operate in real time and has limitations that cannot be caught up with the processing speed of latest high-speed processors. In this paper, we describe the results of the development of internal monitoring software for drone flight control computer processors based on NUTTX/PIXHAWK. The results of this study show that the functions provided compared to commercial debugger are limited, but it can be sufficiently used to verify the flight control system using this system under limited budget.

Implementation of Hydrological Survey Scheduling using Real-Time Water Level Information (실시간 수위정보를 활용한 수문조사 스케줄링 구현)

  • Jae Myeong Choi
    • Journal of Platform Technology
    • /
    • v.11 no.2
    • /
    • pp.66-75
    • /
    • 2023
  • Hydrological survey measurement technology has improved due to the introduction of high-tech equipment and advances in technology, but hydrological survey still requires a lot of manpower and time, and the manpower invested is very limited compared to the size and scope of work. In addition, although automatic flow measurement facilities are in operation, it is difficult to expand them nationwide due to limited field conditions. Therefore, it is necessary to improve the operating infrastructure and environment rather than the measurement technology itself for hydrological investigation. In addition, in terms of flow investigation, it is necessary to schedule an investigation using real-time water level information in order to inventory the accuracy of the water-flow relationship equation and improve work efficiency. Therefore, in this paper, research related to domestic hydrological surveys was analyzed and a hydrological survey scheduling system using real- time water level information based on Open API was implemented to increase the economic and efficiency of hydrological surveys.

  • PDF

Wireless Fieldbus for Networked Control Systems using LR-WPAN

  • Choi, Dong-Hyuk;Kim, Dong-Sung
    • International Journal of Control, Automation, and Systems
    • /
    • v.6 no.1
    • /
    • pp.119-125
    • /
    • 2008
  • This paper examines the use of a wireless Fieldbus based on IEEE 802.15.4 MAC protocol. The superframe of IEEE 802.15.4 is applied to a transmission scheme of real-time mixed data. The transmission and bandwidth allocation scheme are proposed for real-time communication using a superframe. The proposed wireless Fieldbus protocol is able to transmit three types of data (periodic data, sporadic data, and non real-time messages), and guarantee realtime transmission simultaneously within a limited timeframe.

A Fundamental Test of Temperature Crack Reduction Method Application by Setting Time Control of Large-Scaled Mat Foundation Mass Concrete (초대형 매트기초 매스 콘크리트의 응결시간조정에 의한 온도균열저감 공법적용의 기초적 실험)

  • Han, Cheon-Goo;Lee, Jae-Sam;Noh, Sang-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.3
    • /
    • pp.95-101
    • /
    • 2009
  • Constructing large-scale mat foundation mass concrete is increasing for the stability of building structure, because a lot of high rise building are being built in order to make full use of limited space. However, It is of increasing concerns that because limited placing equipments, available job-site and systems for mass concete placement in construction field do not allow to place great quantity of concrete at the same time in large scale mat foundation, consistency between placement lift can not be secured. And also, it is likely to crack due to stress caused by the difference of hydration heat generation time. To find out the solution against above problems, this study is to reconfirm the performance of normal concrete designed by mix proportion and super retarding concrete. The Fundamental test shows what happens if low heat proportioning and control method of setting time are applied at the job-site of newly constructed high rise building. The test result show that slump flow of concrete has been somewhat increased as the target retarding time gets longer, while the air content has been slightly decreased but this is no great difference from normal concrete. The setting time shows to be retarded as target retarding time gets longer, the range of retarding time increases. It is necessary to increase the amount of mix of super retarding agent in the proportion ration by setting curing temperature high since outdoor curing is about 6 hours faster than standard curing, which means the temperature of the concrete will be higher than the temperature of the surrounding environment, due to its high hydration heat when applying in a construction site. The compressive strength of super retarding concrete appears to be lower than normal concrete due to the retarding action in the early stage. However, as the time goes by, the compressive strength gets higher, and by the 28th day the strength becomes the same or higher than normal concrete.