Abstract
Constructing large-scale mat foundation mass concrete is increasing for the stability of building structure, because a lot of high rise building are being built in order to make full use of limited space. However, It is of increasing concerns that because limited placing equipments, available job-site and systems for mass concete placement in construction field do not allow to place great quantity of concrete at the same time in large scale mat foundation, consistency between placement lift can not be secured. And also, it is likely to crack due to stress caused by the difference of hydration heat generation time. To find out the solution against above problems, this study is to reconfirm the performance of normal concrete designed by mix proportion and super retarding concrete. The Fundamental test shows what happens if low heat proportioning and control method of setting time are applied at the job-site of newly constructed high rise building. The test result show that slump flow of concrete has been somewhat increased as the target retarding time gets longer, while the air content has been slightly decreased but this is no great difference from normal concrete. The setting time shows to be retarded as target retarding time gets longer, the range of retarding time increases. It is necessary to increase the amount of mix of super retarding agent in the proportion ration by setting curing temperature high since outdoor curing is about 6 hours faster than standard curing, which means the temperature of the concrete will be higher than the temperature of the surrounding environment, due to its high hydration heat when applying in a construction site. The compressive strength of super retarding concrete appears to be lower than normal concrete due to the retarding action in the early stage. However, as the time goes by, the compressive strength gets higher, and by the 28th day the strength becomes the same or higher than normal concrete.
Keywords
Mat Foundation; Mass Concrete; Super Retarding Agent; Setting Time;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 伊藤眞純 外, 遲延および超遲延のメカニズム、セメント.コンクリート, No.472, pp.31-37, 1986
2 椎葉大和, 超遲延劑, コンクリート工學, Vol.16 No.3, pp.50-54, 1988
3 한국콘크리트학회, 최신콘크리트공학, 기문당, pp.618-626, 2005.2
4 (주)선엔지니어링종합건축사사무소 외, 백설탕액, PEO 증점제, AE제를 일정비율로 혼합한 당류계 초지연제(슈퍼리에 : Superea)의 응결시간차를 활용한 수평분할타설 건축기초 매스콘크리트의 수화열 조정공법, 신기술 제353호, 2002.11
5 J. F. Young, A Review of Mechanisms of Set-retardation in Portland Cement Paste Containing Organic Admixture, Cement and Concrete Research, Vol.2, pp.415-433, 1972   DOI   ScienceOn
6 김진근 외, 매스 콘크리트의 수화열 및 온도응력에 대한 영향요인, 한국콘크리트학회지, 제9권 제3호, pp.15-23, 1997. 7   과학기술학회마을   ScienceOn
7 한민철, 고로슬래그를 사용한 초지연 콘크리트의 응결시간 예측, 대한건축학회 논문집, 제22권 제12호, pp.87-95, 2006. 12   ScienceOn
8 한천구 외, 초지연제의 응결시간차에 의해 구분타설된 매스 콘크리트의 수화열 저감 효과에 관한 연구, 대한건축학회 논문집, 제19권 제7호, pp.79-86, 2003.7   ScienceOn