• Title/Summary/Keyword: Light Rail Transit Industry

Search Result 9, Processing Time 0.027 seconds

A Study on the Development Strategies for the Light Rail Transit Industry (경전철 산업 활성화 및 발전 방안에 관한 연구)

  • Chung Kyung-Ryul;Yoon Se-Kyun;Choi Yong-Hoon
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.1 s.32
    • /
    • pp.95-101
    • /
    • 2006
  • Light rail transit system has many characteristics of better accessibility, frequency service, low construction cost, reduced air pollution and medium-capacity public transport etc. Light rail transit system as a urban transportation system has been growing worldwide since the late 20th century. More than 300 cities around the world have light railway systems. Many medium-size cities in domestic site is planning the construction of light railway. This paper describes the development strategies for the light rail transit industry.

A Study on the Development Strategies for the Light Rail Transit Industry (경전철 산업 발전방안 연구)

  • Chung Kyung-Ryul;Yoon Se-Kyun;Choi Yong-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.500-509
    • /
    • 2005
  • Light-rail transit system has many characteristics of better accessibility. frequency service, low construction cost, reduced air pollution and medium-capacity public transport etc. Light rail transit system as a urban transportation system has been growing worldwide since the late 20th century. More than 300 cities around the world have light railway systems. Many medium-size cities in domestic site is planning the construction of light railway. This paper describes the development strategies for the light rail transit industry.

  • PDF

The Strategy of Wireless Power Transfer for Light Rail Transit By Core Technologies Analysis Based on Text Mining

  • Meng, Xiang-Yu;Han, Young-Jae;Eum, Soo-Min;Cho, Sung-Won
    • Journal of the Korea Society of Computer and Information
    • /
    • v.23 no.11
    • /
    • pp.193-201
    • /
    • 2018
  • In this paper, we extracted relevant patent data and conducted statistical analysis to understand the technical development trend related to Wireless Power Transfer (WPT) for Light Rail Transit (LRT). Recently, with the development of WPT technologies, the Light Rail Transit (LRT) industry is concentrating on applying WPT to the power supply system of trains because of their advantages compared wired counterpart, such as low maintenance cost and high stability. This technology is divided into three areas: wireless feeding and collecting technology, high-frequency power converter technology and orbital and infrastructure technology. From each specific area, key words in patent document were extracted by TF-IDF method and analyzed by social network. In the keyword network, core word of each specific technology were extracted according to their degree centrality. Then, the multi-word phrases were also built to represent the concept of core technologies. Finally, based on the analysis results, the development strategies for each specifics technical area of WPT in LRT filed will be provided.

The Safety Program Plan of the LRT(Light Rail Transit) System (경량전철시스템의 안전성구축방안)

  • 정락교;윤용기;목재균;이병송;최규형
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.586-593
    • /
    • 2000
  • This paper describes a safety program plan of the LRT(Light Rail Transit) project. The SPP is a management document that describes the system safety objectives and how they will achieved so it embodies principles, methods and 1)lattices commonly used in the transit industry. In a Preliminary Hazard Analysis phase, the hazard analysis of collision and derailment is carried out. In this paper we make a definition of hazard that hazard is consist of an inner part(means a reliability) and an outer part(means a fire, flood and earthquake). Also safety principles for infrastructure, stations, electric traction system, railway control of system and train are performed.

  • PDF

A Study on the Development of Practical Systems Engineering Management Plan Template Using the Systems & Software Engineering Infra (SE & SW Infra를 활용한 실용적인 SEMP 템플릿 개발에 관한 연구)

  • Byun, Bo Suk;Choi, Yo Chul;Park, Young Taek
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.5
    • /
    • pp.442-446
    • /
    • 2012
  • This paper is a practical study on the development of SEMP template using SE & SW infrastructures. SEMP, which is a management system for systems engineers, has been developed for the LRT(Light Rail Transit) industry and has been tailored to suit domestic conditions. SE & SW infrastructures were developed to assist in creating an effective and efficient SEMP for the industry of this study. This paper proposes a method to reduce costs, manpower, and time for the LRT industry using SEMP based on SE & SW infrastructures.

On Slimming down the Functions Room of Light Rail Transit Stations by Utilizing an Enhanced DSM Method (개선된 DSM 기법을 통한 경전철 정거장 기능실의 슬림화에 관한 연구)

  • Kim, Joo-Uk;Park, Kee-Jun;Kim, Young-Min;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.2
    • /
    • pp.927-939
    • /
    • 2015
  • It appears that the rapid advance in technology has allowed to broaden the variety of rail systems technology, thereby fostering new business opportunity in rail industry. The direction of rail systems operations is mainly two fold. In one direction, long distance operations between mega cities are pursued with help of high speed trains under development. In the other case, relatively short distance operations for covering intra-city or suburban area are becoming popular. A good example of the latter case is light rail transit (LRT) systems. Due to the short distance operation, it is thus expected that both the development and operation cost for LRT systems be reduced to some extent. The cost reduction desired in there can be gained by scaling down the sizes of both the trains and stations as compared to those of normal rail systems. However, it is not well known how the LRT stations can be scaled down. The objective of this paper is to study on how to slim down the stations (particularly, the functions room) of LRT systems. To achieve the objective, an approach is studied based on a modified method of design structure matrix (DSM). Specifically, using the enhanced DSM method, an integrated architecture is developed for the functions room, in which equipments are housed to perform the functions of electricity, signaling, and communication for LRT stations. The use of the result indicates that the desired reduction can be obtained with the approach taken in the paper.

A Study on the Determination of Optimum L.R.T Route from the Viewpoint of Revenue Maimization Principles (수익성을 감안한 경전철의 최적노선 결정방법에 관한 연구)

  • 원제무;박창호;이성모
    • Journal of Korean Society of Transportation
    • /
    • v.12 no.3
    • /
    • pp.29-47
    • /
    • 1994
  • Although subway system continues to be the backbone of transportation systems in a city like Seoul, there will still be areas across the city where subway services are not avaliable. Interest has steadily grown to fill this missing routes in overall urban transportation system. Light Rail Transit (L.R.T) system has been recently thought to be an appropriate mode of transportation by businessmen, professionals and transportation industry. In this regards, the purpose of this study is to explore whether L.R.T can be a feasible form of urban rail mode in the context of Seoul. First, the study develops the mathematical models to derive optimum route networks and stations. Integer Programming is employed to determine whether alternative routes are financially viable from the viewpoint of revenue maximization principles. Second, mathematical models developed are applied to Yoido area in order to examine the validity of model structures. The models constructed turns out be capable of handling alternative routes and stations. Application of models are successfully carried out to derive financially feasible set of routes and stations.

  • PDF

Simulation Analysis of the Train Overhaul Maintenance Capacity for Rolling Stock Depot (열차 차량기지의 중정비 검수 용량 시뮬레이션 분석)

  • Jeon, Byoung-Hack;Lee, Won-Young;Jang, Seong-Young;Yoo, Jae-Kyun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1481-1498
    • /
    • 2007
  • As railroad industry face the new Renaissance era, effective and efficient maintenance methods for rolling stock operation are required with advanced railroad technology. All kinds of railroad systems such as high speed long distance train, metropolitan mass transit and light rail require systematic maintenance technology in order to maintain the safe railroad operation. Simulation models for detailed operations of the sample maintenance center are developed. In this study, standard maintenance procedures, layout, equipments and number of workers of Siheung Metropolitan Railroad Maintenance Rolling Stock Depot are considered. The proposed simulation models are developed using simulation package ARENA. Three simulation analysis using the developed simulation model are done. First, the bottleneck operation is identified. Second, the relationship between maintenance center size, number of workers and cycle time is analyzed. Lastly, the scheduling performances between PERT/CPM and Critical Chain Project Management(CCPM) are compared.

  • PDF

Evaluation of Train Overhaul Maintenance Capacity for Rolling Stock Depot Using Computer Simulation Method (시뮬레이션 기법을 활용한 열차 차량기지의 중정비 검수 용량 평가)

  • Jang, Seong-Young;Jeon, Byoung-Hack;Lee, Won-Young;Yoo, Jae-Kyun
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.231-242
    • /
    • 2007
  • As railroad industry faces the new Renaissance era, effective and efficient maintenance methods for rolling stock operation are required with advanced railroad technology. All kinds of railroad systems such as high-speed long-distance train, metropolitan mass transit and light rail require systematic maintenance technology in order to maintain the safe railroad operation. Simulation models for regular operations of the example maintenance center are developed. In this study, standard maintenance procedures, layout, equipments, and number of workers of Siheung Metropolitan Railroad Maintenance Rolling Stock Depot are considered. The proposed simulation models are developed using simulation package ARENA. After simulation, four types of observations are analyzed. First, the bottleneck operation is identified. Second, the relationship between maintenance center size, number of workers and cycle time is analyzed. Third, the scheduling performances between PERT/CPM and Critical Chain Project Management(CCPM) are compared. Lastly, the simulation results according to worker's working coverage shows expanding the worker's coverage decreases the cycle time and increases throughput per train. However, workers are to be fully trained to do multiple skill work.