• Title/Summary/Keyword: Life-Cycle Cost (LCC)

Search Result 318, Processing Time 0.03 seconds

Development of Disaster Risk Analysis System for Environment Friendly Road (친환경 도로노선의 재해위험도 평가시스템 개발)

  • Song, Min-Tae;Kang, Ho-Geun;Kim, Heung-Rae;Lee, Tae-Ock;Lee, Han-Joo
    • International Journal of Highway Engineering
    • /
    • v.14 no.5
    • /
    • pp.123-132
    • /
    • 2012
  • PURPOSES: This study is to investigate the consideration which relates with a disaster from route alignment process and proposed the method it will be able to evaluate a disaster danger fixed quantity. METHODS: Use the landslide disaster probabilistic map of GIS based and in about landslide occurrence of the route alignment at the time of neighboring area after evaluating a risk fixed quantity, it compared LCC expense in about each alternative route. It developed the system it will be able to analyze a LCC and a disaster risk in about the alternative route. In order to verify a risk analytical algorithm and the system which are developed it selected national road 59 lines on the demonstrative route and it analyzed a disaster risk. RESULTS: Demonstrative route not only the disaster risk to be it will be able to compare a disaster risk fixed quantity like the economical efficiency degree in compliance with LCC expense productions it compared and there being the designer will be able to decide the alternative route, it confirmed. CONCLUSIONS: Roads can be designed by considering occurs repeatedly landslides and debris flow caused by disasters in advance and expect to be able to effect that can reduce the overall cost to recover losses caused by the disaster, and temporally loss is expected.

Economic Analysis on Transshipment and the Gauge-Adjustable System for Trans-Continental Container Transportation (대륙연계 컨테이너 수송을 위한 환적방식과 궤간가변방식의 경제성 비교)

  • Chung, Kwang Woo
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.5
    • /
    • pp.373-380
    • /
    • 2014
  • With a view to the commercialization of the Korean automatic variable-gauge bogie in the Eurasia railway system, the aim of this research was to perform an economic analysis concerning the possible introduction and operation of this bogie at the present time. For this purpose, we compared the possible types of freight connection service for container transportation, transshipment and the gauge-adjustable system, estimating the total life-cycle cost (LCC) incurred by each system, depending on type and quantity, over the whole process of acquisition, operation, maintenance and disposal. Based on this, we presented a case-by case analysis. Furthermore, in estimating economic feasibility, we analyzed the cost-benefit ratio taking into account not only the objective LCC, but also the reduced time required for the gauge-change and customer convenience. After estimating the LCC and analyzing the cost-benefit ratio of the respective systems, we demonstrated the economic superiority of view of the gauge adjustable system.

Case Studies of the Life Cycle Cost Analysis for Rehabilitation of Deteriorated Expressway Concrete Pavements (고속도로 노후 콘크리트 포장 보강의 경제성 분석 사례 연구)

  • Suh, Young-Chan;Park, Ji-Won;Kim, Chan-Woo
    • International Journal of Highway Engineering
    • /
    • v.18 no.3
    • /
    • pp.33-45
    • /
    • 2016
  • PURPOSES : Concrete pavement has been used in the construction of the Jungbu expressway in 1987. More than 60% of the pavement on the expressway is currently made of concrete, but most has been used far beyond their design life. Pavement life has been extended through routine maintenance or overlay. However, the structural capacity of the pavement has reached its limit, and extensive rehabilitation/reconstruction with long time traffic blocking should be considered. The three following issues on concrete rehabilitation/reconstruction will be discussed: (1) economic comparison of asphalt inlay and asphalt overlay, (2) economic comparison preventive overlay on a section which is currently good and routine overlay on the section which will be poor, and (3) economic analysis of early-strength concrete when it is used in concrete reconstruction. METHODS : First, various life cycle cost analysis tools were compared, and the proper tool for the extensive rehabilitation/reconstruction was selected. Second, a sensitivity analysis of the selected tool was performed to find the influential input variables, which should be carefully selected in the analysis. Third, three case studies, which can be issues in the rehabilitation/reconstruction of the expressway concrete pavement in Korea, were performed. RESULTS : Asphalt overlay without milling the deteriorated concrete showed 18~25% lower life cycle cost than the current asphalt inlay with milling. The good current preventive overlay on the section was economically justified within the scope of this study. The construction cost limit of the early strength concrete was suggested to be economical for 1, 3, and 7 days of construction alternative opening. CONCLUSIONS : CA4PRS was a viable tool for comparing various rehabilitation/reconstruction issue alternatives. Several concrete issues associated with the rehabilitation/reconstruction of the deteriorated concrete pavement were discussed as mentioned above.

Performance Characteristics and Economic Assessment of Heat Pump Systems with the Various Heat Source (열원에 따른 열펌프의 성능 비교 및 경제성 평가)

  • Park, Cha-Sik;Park, Kyoung-Woo;Kwon, Oh-Kyung
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.7 no.1
    • /
    • pp.23-31
    • /
    • 2011
  • The objectives of this study are to analyze the performance of a heat pump system with the various heat source and to carry out economic assessment for the heat pump system. The COP of the river water and ground source heat pump system was 20% higher than that of the air source heat pump system because river water and geothermal provide stable operating temperature compared with air temperature throughout the year. In addition, the economic assessment of a heat pump system using air, river water, and geothermal as a heat source was carried out. The ratio of the life cycle operating cost to the life cycle cost increased with the increase of building capacity. The payback period was found to be less than 3.3 and 4.5 years, respectively when the capacity of the river water and ground source heat pump was larger than 10 RT.

Application and Life Cycle Cost Analysis for Ice-rink using Seawater Heat Source Cooling System (해수 냉방시스템의 빙상경기장 적용 방안 및 LCC 분석)

  • Park, Jin-Young;Kim, Sam-Uel;Lee, Ho-Saeng;Kim, Hyeon-Ju
    • Journal of the Korean Solar Energy Society
    • /
    • v.33 no.2
    • /
    • pp.50-55
    • /
    • 2013
  • On a plan for the Winter Olympics 2018, Korean government is in the process of the world's first use of ocean energy for the Olympic ice-rink. This technology will be applied to a seaside town and have possibility of an export industry. In this study, we researched facilities and system for P ice-rink that acts as a cultural center as well as a physical plant in Busan and provided the way that apply by seawater heat source. Also, existing system and seawater heat source system of P ice-rink was analyzed by the most commonly used life cycle cost analysis among economics methods. Such economics data for ice-rink using seawater will be utilized by a basic information.

Life Cycle Cost Analysis of SCP Composite Girder Bridge for Railroad (철도용 SCP합성거더교의 LCC 분석에 관한 연구)

  • Kim, Dae-Sung;Cho, Sun-Kyu;Kwon, Chek;Choi, Young-Min
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.244-249
    • /
    • 2006
  • Recently, the SCP(Steel Confined Prestressed concrete) composite girders are developed to improve the characteristic such as displacement, vibration, and heavy dead load due to influence of self weight, and inefficiency of steel section of exiting girder-type railroad bridges. It is needed to verify the economical effciency of newly developed SCP composite girder bridge compared with the conventional girder-type bridges. In this paper, LCC analysis for alternative railroad bridges Is performed and its technique based on level of risk(probability of failure) is suggested. From the results, it may be stated that SCP composite girder bridge is more economical than a conventional one.

Economics analysis for life cycle cost design of bridges (LCC를 고려한 교량의 경제성 분석)

  • Shin, Yung-Seok;Pack, Jang-Ho;Ahn, Sung-Chan
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.162-165
    • /
    • 2010
  • 합리적인 교량 대안선정을 위해서는 설계 시 경제성, 경관성, 안전성 및 기능성, 유지관리 용이성, 시공성 등 다양한 속성을 고려하여야 한다. 이 중 경제성은 초기비용뿐만 아니라 공용수명에 걸쳐 발생하는 유지관리비용, 보수 보강비용, 해체 폐기비용 등의 합인 총 생애주기비용에 대해 최소의 비용으로 최상의 가치를 창출하도록 하여야 한다. 본 연구에서는 건설계획과정에서 대표적으로 고려될 수 있는 대안으로 세 가지 교량 형식(강상자형교, 소수주형교, PSC-I형 거더교)을 대상구조물로 선정하고 교량의 공용수명은 상태등급곡선으로부터 추정한 내하율 곡선을 사용하여 산정하였다. LCC최적설계를 위해 설계변수, 제약조건, 목적함수를 구성하였고, 총 생애주기비용을 공용수명으로 나눈 연간생애주기비용을 사용하여 하여 합리적인 교량의 경제성 분석을 수행하였다.

  • PDF

A Study on the optimal selection of backfill method using VE/LCC Analysis for Urban Underground Railway (VE/LCC 분석을 통한 도시철도 지하구조물 상부 되메우기의 최적대안 선정에 관한 연구)

  • Kim, Kyong-Ho;Shin, Min-Ho;Park, Jong-Kwan
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.100-106
    • /
    • 2008
  • Road on the urban underground railway has been repaired for several years right after completion caused by the settlement of backfill and the damage of utility lines, which demands the practical application of life-cycle cost on design of backfill. This study perform the VE and LCC Analysis to select a optimal method of backfill and present the models and factors of VE process in the consideration of specialists' opinion and judgement on the category of critical maintenance items.

  • PDF

VE.LCC Case Analysis on the Build-Transfer-Lease(BTL) Projects of School facility (학교시설 임대형민간투자사업(BTL)의 VE.LCC 사례 분석)

  • Lee, Do-Hyung;Park, Woo-Jin;Chu, Gook-Sik;Cho, Ki-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.143-148
    • /
    • 2008
  • This study is VE LCC case analysis on two school BTL projects which is constructed by Private sector and rented to government. Then private sector payback their initial cost and profit by rental fee from government. The VE in Korea, revised by the method of the Construction Technique - Enforcement Ordinance in 2005 is applicable to construction business which size is over 10 billion won. The VE well known as a way of productivity elevation is already proven and outstanding management method In construction industry inside and outside of the courtly. As its unique personality of BTL business, VE workshop period is too short. There is a few accomplished BTL project and data base, because BTL business begun from year of 2006. So we are trying to proof effect of VE LCC through case study of school BTL projects.

  • PDF

Optimal Replacement Scheduling of Water Pipelines

  • Ghobadi, Fatemeh;Kang, Doosun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.145-145
    • /
    • 2021
  • Water distribution networks (WDNs) are designed to satisfy water requirement of an urban community. One of the central issues in human history is providing sufficient quality and quantity of water through WDNs. A WDN consists of a great number of pipelines with different ages, lengths, materials, and sizes in varying degrees of deterioration. The available annual budget for rehabilitation of these infrastructures only covers part of the network; thus it is important to manage the limited budget in the most cost-effective manner. In this study, a novel pipe replacement scheduling approach is proposed in order to smooth the annual investment time series based on a life cycle cost assessment. The proposed approach is applied to a real WDN currently operating in South Korea. The proposed scheduling plan considers both the annual budget limitation and the optimum investment on pipes' useful life. A non-dominated sorting genetic algorithm is used to solve a multi-objective optimization problem. Three decision-making objectives, including the minimum imposed LCC of the network, the minimum standard deviation of annual cost, and the minimum average age of the network, are considered to find optimal pipe replacement planning over long-term time period. The results indicate that the proposed scheduling structure provides efficient and cost-effective rehabilitation management of water network with consistent annual budget.

  • PDF