1 |
S.H. Jang (2008) Technical Development of Variable Gauge Device, KRRI Report.
|
2 |
F. Ardiaca, V. Kinderis (2008) Interoperability Unit : Feasibility study for the EU 1520/1524 rail system interoperability, European Railway Agency.
|
3 |
H. Jurgen Geissle (2009) Results of Feasibility Study : Automatic Gauge Changeover Systems, UIC Seminar, Russia Sochi.
|
4 |
M. Kanclerz (2007) Study on European Automatic Track Gauge Changeover Systems (ATGCS), Second International Seminar 1435/1520, UIC.
|
5 |
Y.S. Ham, J.N. Yoon (2003) International Development Direction of Variable Gauge Vehicles, Proc. of Korean Society for Railway, pp. 418-423.
|
6 |
H.S. Na et al. (2004) A Comparative Study of the Technical Characteristics of Variable-Gauge Systems, Proc. of Korean Society for Railway, pp. 63-69.
|
7 |
M. Szkoda, A. Tulecki (2008) Decision Model in Effectiveness of Europe-Asia Transportation Systems, WCRR, Seoul, Korea.
|
8 |
A. Tuecki (1996) Technical - organizational problems of gauge changes in the 1520/1435 European transport corridors East- West, Scientific Conference : The use of European transport corridors, Kielce-Cedzyna.
|
9 |
M. Szkoda (1995) Analysis of organizational and economic options for transportation of petroleum products on the railways with different gauge, Working group IPSz PK Poland.
|
10 |
K.W. Chung, C.S. Kim, S.H. Jang (2012) Technical Evaluation of Railway Transportation System with the Change of Gauge, Journal of the Korea Academia-Industrial cooperation Society, 13(5), pp. 1954-1962.
과학기술학회마을
DOI
|
11 |
K.W. Chung, J.Y. An, C.S Kim, H.S. Na (2012) Effectiveness Evaluation of the Bogie Exchange and the Automatic Variable Gauge System Using LCC Analysis, Journal of the Korean Society for Railway, 15(4), pp. 334-342.
과학기술학회마을
DOI
ScienceOn
|