• Title/Summary/Keyword: Life cycle cost evaluation model

Search Result 65, Processing Time 0.026 seconds

A case on the Evaluation of the Effectiveness of Model based Configuration Management System for Small/ Medium-Sized Plant (모델 기반 중소형 플랜트 형상관리 시스템의 효과성 평가 사례)

  • Ha, Ga Yeon;Kim, Jinil;Shin, Junguk;Yeom, Choong Sub
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.17 no.1
    • /
    • pp.107-113
    • /
    • 2021
  • Plant Configuration Management(CM) is an activity to maintain consistency of design requirements, physical configuration, facility configuration information throughout the life cycle of the plant by systematically managing changes that occur during the plant design and operation process. Conformity between information must be ensured not only in the design stage, but also in the case of design changes in the operation and maintenance stages, and thus a computer system capable of efficiently managing them is required. In particular, in consideration of an application to small and medium-sized domestic plants, a computer system that can support configuration management at a low cost is needed. Accordingly, in this study, a configuration management system has been developed to support the management of plant design information and change procedures in the operation stage of small and medium-sized plants. Here, a case for quantitatively evaluating the effectiveness of the developed system is described.

A Study on the Estimation Measure of Delay Cost on Work Zone Using the Traffic Flow Model (교통류 모형을 이용한 도로 점용공사 구간의 지체비용 산정방안)

  • Kim, Yunsik;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.120-129
    • /
    • 2016
  • The user cost is an important analysis item which should be considered together with life-cycle of facility, administrator cost and discount rate in LCCA for efficient asset management of SOC facilities. Especially, a significant delay cost occurs often for users in the road field due to a work zone for cleaning and maintenance, and in such case, the administrator should consider the administrator cost as well as the user cost for more rational decision making. However, the user cost has not been considered in most decision making steps until recently and relevant studies also have not been carried out actively. In this study, the methodology to estimate the user cost and delay cost required in the decision making step using the traffic flow model and the direct benefit estimation model in the traffic facility investment evaluation guideline is suggested. And, the traffic flow model was estimated on 4 national highway sections where maintenance was actually carried out in 2014 using VISSIM and, the user cost and the delay cost were estimated based on the suggested methodology. The analysis result showed that the average user cost of $17,569,000KRW/km{\times}day$ occurred on Section A with approximately 30,000 AADT before a work zone occurred, and in case the first lane was blocked for maintenance, the delay cost of $10,193,000KRW/km{\times}day$ (158%) on average occurred additionally. The delay cost of $1,507,000KRW/km{\times}day$ (115%) and $1,985,000KRW/km{\times}day$ (119%) occurred on Sections B and D with approximately 20,000 AADT respectively and the delay cost of $262,000KRW/km{\times}day$ (105%) occurred on Section C with approximately 10,000 AADT. This result of this study was estimated based on the simulation of traffic flow model so that there is a limitation in its actual application. A study ot develop a highly appropriate model using actual observation data and improve the possibility to apply it through the verification using the simulation will be necessary in future.

A Quantitative Analysis Theory for Reliability of Software (소프트웨어 신뢰성의 정량적 분석 방법론)

  • Cho, Yong-Soon;Youn, Hyun-Sang;Lee, Eun-Seok
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.15 no.7
    • /
    • pp.500-504
    • /
    • 2009
  • A reliability of software is a type of nonfunctional requirement. Traditionally, a validation of the reliability is processed at the integration phase in software development life cycle. However, it increases the cost and the risk for the development. In this paper, we propose reliability analysis method based on mathematical analytic model at the architecture design phase of the development process as follows. First, we propose the software modeling methodology for reliability analysis using Hierarchical combined Queueing Petri Nets(HQPN). Second, we derive the Markov Reward Model from the HQPN based model. We apply our approach to the video conference system to verify the usefulness of our approach. Our approach supports quantitative evaluation of the reliability.

An Analysis on the Current Status of Maintenance System for Introducing the Asset Management System of Power Generation Companies (발전시설물의 자산관리체계 구축을 위한 전산시스템 개발)

  • Park, Jeonggwon;Yoon, Hyeongseok;Kim, Changhak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.41-49
    • /
    • 2021
  • Domestic maintenance strategies are shifting from safety assessment to performance assessment, and related systems and laws are being restructured to meet those criteria. In order to introduce asset management based on performance evaluation, related evaluation methods such as performance measures and level of service should be made to evaluate performance according to the characteristics of the structure, but these are not well-prepared in Korea. In this study, we present a computerized model and system for implementing asset management that introduces techniques such as performance evaluation, life cycle cost analysis, performance measures, and level of service in conjunction with existing maintenance and safety diagnosis procedures. The features of this system consist of three modules to enable separate operations of existing maintenance, safety management and asset management. The system is designed to be used as a reference for public institutions to introduce asset management in the future.

A Study on the Selection of a Bridge Structure Type Using DEA and LCC (DEA기법과 LCC개념을 활용한 교량형식 선정 방법에 관한 연구)

  • Han, Sam-Heui;Kim, Jong-Gil
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.4
    • /
    • pp.101-111
    • /
    • 2013
  • In this study, DEA (Data Envelopment Analysis) was carried out on the four bridges, which have the same extension (L=1,615m), in order to select the most superior, economical method of construction using the LCC concept of each bridge structure in the case of the Ulsan-Pohang double track railway which is scheduled to be constructed. DEA models were analyzed with the CCR model, which was designed for the evaluation of relative efficiency of each model. The initial construction costs, maintenance costs, indirect costs (user costs + indirect loss of social costs), and life cycle costs were used as input variables, and average duration was applied as the output variable. LCC was applied to calculate the input variables, and to get the costs of LCC, 100 years of period and 4.83% of real discount rate were applied, and the costs are classified into initial construction, maintenance, user, and indirect loss of social cost. The analysis results showed that the Method 2 and 3 were evaluated as the most efficient, and the other alternatives were evaluated as the following order; Method 1, the default, and Method 4.

Technical Value Model and Evaluation for Smart In-vehicle Network (스마트 차량내(內) 네트워크 기술가치 모델 및 평가)

  • Kim, Byung-Woon
    • Journal of Korea Technology Innovation Society
    • /
    • v.20 no.2
    • /
    • pp.368-386
    • /
    • 2017
  • The purpose of this study is to present the technology value model based on profit approach and IITP practical guide for Ethernet network technology, which is the core technology of autonomous vehicles and connected cars in the hyper-connected industry. In-vehicle network, Ethernet technology, Ethernet port count, port pricing, and application data for technology assessment are sources of global market research organizations. The data on the company's COGS (Cost of Goods Sold), operating capital requirement, capital expenditure, and income statement data are used by the Bank of Korea's Business Analysis Report. According to the results of the study, the product market size was estimated to be US $470.3 billion and the technology market size was $52.1 billion over the seven years of economic life cycle of technology. The market value of the technology was estimated to be $260 million reflecting the possibility of entry into the market. In the case of the corporate management analysis report, the average value of the IITP and the top 25% were $0.7 million and $40.2 million, respectively. -27.8 million, and -73.6 million dollars respectively. This implies that government support for policy support is needed when conducting corporate R&D with high cost-to-sales ratio. The results of this study can be used as a reference for the evaluation of technology demand based ICT R&D technology in the industrial internet market in the fourth industrial revolution era.

A Strategy for Developing New Road Projects (경관도로 등 신개념의 도로사업 개발에 관한 연구)

  • Kim, Eung-Cheol
    • International Journal of Highway Engineering
    • /
    • v.9 no.2 s.32
    • /
    • pp.115-127
    • /
    • 2007
  • Developed countries, especially in road construction and management fields, introduce new road porjects such as National Scenic Byways Program(NSBP program) in USA and the Eco-road project in Japan. This study develops a conceptual model for deploying new road projects in Korea. The four step approach is suggested to create new road projects, including foundation of an act based on the existing Road Act, creation of new road project ideas, development of evaluation process and guidelines, and enhancement of an administrative scheme. To create new road projects, three different ways are devised; (1) designation of national roads having uniqueness in overall spectrum, (2) designation of roads having intrinsic values in a different aspect, (3) designation of single structures of engineering outcomes such as bridges, tunnels, new design techniques, considerable Value Engineering output, and well analyzed Life Cycle Cost Analysis practices. For the evaluation process, NSBP program of USA and/or Sustainable City Award program of Korea would be recommended. An administrative scheme and integrated funding process for the new road projects are also suggested based on evaluation of tasks of each team or division of Korea Ministry of Construction and Transportation.

  • PDF

The Improvement of maintainability evaluation method at system level using system component information and fuzzy technique (시스템의 구성품 정보와 퍼지 기법을 활용한 시스템 수준 정비도 평가 방법의 개선)

  • Yoo, Yeon-Yong;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.3
    • /
    • pp.100-109
    • /
    • 2019
  • Maintainability indicates the extent to which maintenance can be done easily and quickly. The consideration of maintainability is crucial to reduce the operation and support costs of weapon systems, but if the maintainability is evaluated after the prototype production is done and necessitates design changes, it may increase the cost and delay the schedule. The evaluation should verify whether maintenance work can be performed, and support the designers in developing a design to improve maintainability. In previous studies, the maintainability index was calculated using the graph theory at the early design phase, but evaluation accuracy appeared to be limited. Analyzing the methods of evaluating the maintainability using fuzzy logic and 3D modeling indicate that the design of a system with good maintainability should be done in an integrated manner during the whole system life cycle. This paper proposes a method to evaluate maintainability using SysML-based modeling and simulation technique and fuzzy logic. The physical design structure with maintainability attributes was modeled using SysML 'bdd' diagram, and the maintainability was represented by an AHP matrix for maintainability attributes. We then calculated the maintainability using AHP-based weighting calculation and fuzzy logic through the use of SysML 'par' diagram that incorporated MATLAB. The proposed maintainability model can be managed efficiently and consistently, and the state of system design and maintainability can be analyzed quantitatively, thereby improving design by early identifying the items with low maintainability.

A Study on the Design Value Analysis Methodology for Bridge Structure Using Reliability Analysis (신뢰성 해석을 이용한 교량구조물의 설계VA기법 연구)

  • Kim, Seong-Il;Lee, Kwang-Mo;Choi, Suk-Won;Jung, Jun-Hwa;Kim, Seong-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.114-125
    • /
    • 2009
  • In this study, a design value analysis technique that considered stochastic LCC and stochastic performance evaluation was proposed, and by introducing the concept of reliability analysis, a decision making that secured reliability was supported. The results of this study, which was carried out according to the above objectives and methods, are summarized as follows: 1) The design value analysis procedures and value state function, improved in order to carry out a reliable analysis when evaluating alternate proposals that were extracted after the function definition was complete, were formalized, and in order to secure consistency and efficiency for value evaluation procedures, an evaluation index scheme was proposed; 2) Database collection and analysis were done for a bridge's LCC analysis. As for the collection scope of data, literature of previous research done on a bridge's LCC analysis was used as the basis for analysis, and for securing reliability regarding analysis results and dealing with uncertainty of collected data, the MCS technique was applied; 3) Weights and evaluation ranks for performance evaluation of each of the alternate proposals, as well as LCC analysis model, analysis period, discount rate, user expense, safety inspection and safety diagnosis expense conditions for LCC analysis were proposed. Lastly, a feasibility study was done and conclusion was made about "OO grand bridge and connecting road construction work execution design" project centered on value analysis execution case.

Effectiveness Evaluation of the Bogie Exchange and the Automatic Variable Gauge System using LCC Analysis (LCC 분석을 이용한 대차교환과 자동궤간가변 시스템의 효율성 평가)

  • Chung, Kwang-Woo;An, Joon-Yong;Kim, Chul-Su;Na, Hee-Seung
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.4
    • /
    • pp.334-342
    • /
    • 2012
  • It is connected with various gauges existing in Euro-Asian continents. Such differences impedes the operation seriously as on the contact of railway tracks of different gauge the cargo must be either transshipped or the running assemblies of rail vehicles must be exchanged. Those operations are costly, time-consuming and require extended infrastructure together with very expensive storage and transshipment facilities at border-crossing point. Moreover, those operations extend transportation time considerably. Therefore, effectiveness of railway transportation systems significantly depends on track gauge change 1435/1520mm, which connects with complicated handling-shifting operations. The paper concerns assessment of effectiveness in strategical rail systems with gauge changing. The paper presents short description of transport system with gauge changing and initial assessment of shifting technologies. Method of system assessment comparison based on Life Cycle Cost model is described here as well.