• Title/Summary/Keyword: Liability of contract

Search Result 151, Processing Time 0.026 seconds

Direction of CM Services Defect Liability in the CM Contract

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.3
    • /
    • pp.209-217
    • /
    • 2013
  • The execution of a construction project involves the engagement of many participants. Generally, the Authority uses CM to certify that the Work is built according to the contract documents. The CM work scope is expressed in the Construction Technology Management Act and its Regulation. The mandated and delegated CM services are limited to the construction period. If Contractor is required to repair a construction defect, the Contractor should bear the burden of the inspection service for the defect repair, because it is associated with him. Nevertheless, CM should submit a bond to provide the inspection and supervision service for the defect repair. These may result in conflict with each liability. Therefore, CM service in the law and regulation was investigated and analyzed in this study to classify the characteristics of CM contracts, and it was suggested that the CM liability for the inspection and supervision service for the defect repair should be reconsidered.

A Study on the Direction of the Warranty Contract in Constructions (건설공사 성능계약제도 도입방향에 관한 연구)

  • Kim, Hyun;Park, Sung-Yong;Seo, Young-Chil;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.153-157
    • /
    • 2008
  • The construction market has gradually become complexity, variety and specialization, and then owner's requirements about quality has become various. In order to solve the problem such as stated above, advanced constructions in United Kingdom, Japan and United States have introduced warranty contract which is warranted to quality and performance for need of owner in determined term to ensure the quality of construction since 1960s. However, the interior of a country encounter another problem result from defects liability what indefiniteness of defects standard, excess responsibility period, social recognition of be identical fraudulent work and defects, and contract with ascendancy of owners. etc, so builders concerned more excess defects liability than the quality of construction. The purpose of this study is to analysis of warranty contract in order to solve the problem such as stated above.

  • PDF

The Liability of Participants in Commercial Space Ventures and Space Insurance (상업우주사업(商業宇宙事業) 참가기업(參加企業)의 책임(責任)과 우주보험(宇宙保險))

  • Lee, Kang-Bin
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.5
    • /
    • pp.101-118
    • /
    • 1993
  • Generally there is no law and liability system which applies particulary to commercial space ventures. There are several international treaties and national statutes which deal with space ventures, but their impact on the liability of commercial space ventures has not been significant. Every state law in the United States will impose both tort and contract liability on those responsible for injuries or losses caused by defective products or by services performed negligently. As with the providers of other products and services, those who participate in commercial space ventures have exposure to liability in both tort and contract which is limited to the extent of the resulting damage The manufacturer of a small and cheap component which caused a satellite to fail to reach orbit or to operate nominally has the same exposure to liability as the provider of launch vehicle or the manufacturer of satellite into which the component was incorporaded. Considering the enormity of losses which may result from launch failure or satellite failure, those participated in commercial space ventures will do their best to limit their exposure to liability by contract to the extent permitted by law. In most states of the United States, contracts which limit or disclaim the liability are enforceable with respect to claims for losses or damage to property if they are drafted in compliance with the requirements of the applicable law. In California an attempt to disclaim the liability for one's own negligence will be enforceable only if the contract states explicitly that the parties intend to have the disclaimer apply to negligence claims. Most state laws of the United States will refuse to enforce contracts which attempt to disclaim the liability for gross negligence on public policy grounds. However, the public policy which favoured disclaiming the liability as to gross negligence for providers of launch services was pronounced by the United States Congress in the 1988 Amendments to the 1984 Commercial Space Launch Act. To extend the disclaimer of liability to remote purchasers, the contract of resale should state expressly that the disclaimer applies for the benefit of all contractors and subcontractors who participated in producing the product. This situation may occur when the purchaser of a satellite which has failed to reach orbit has not contracted directly with the provider of launch services. Contracts for launch services usually contain cross-waiver of liability clauses by which each participant in the launch agrees to be responsible for it's own loss and to waive any claims which it may have against other participants. The crosswaiver of liability clause may apply to the participants in the launch who are parties to the launch services agreement, but not apply to their subcontractors. The role of insurance in responding to many risks has been critical in assisting commercial space ventures grow. Today traditional property and liability insurance, such as pre-launch, launch and in-orbit insurance and third party liability insurance, have become mandatory parts of most space projects. The manufacture and pre-launch insurance covers direct physical loss or damage to the satellite, its apogee kick moter and including its related launch equipment from commencement of loading operations at the manufacture's plant until lift off. The launch and early orbit insurance covers the satellite for physical loss or damage from attachment of risk through to commissioning and for some period of initial operation between 180 days and 12 months after launch. The in-orbit insurance covers physical loss of or damage to the satellite occuring during or caused by an event during the policy period. The third party liability insurance covers the satellite owner' s liability exposure at the launch site and liability arising out of the launch and operation in orbit. In conclusion, the liability in commercial space ventures extends to any organization which participates in providing products and services used in the venture. Accordingly, it is essential for any organization participating in commercial space ventures to contractually disclaim its liability to the extent permitted by law. To achieve the effective disclaimers, it is necessary to determine the applicable law and to understand the requirements of the law which will govern the terms of the contract. A great deal of funds have been used in R&D for commercial space ventures to increase reliability, safety and success. However, the historical reliability of launches and success for commercial space ventures have proved to be slightly lower than we would have wished for. Space insurance has played an important role in reducing the high risks present in commercial space ventures.

  • PDF

The Harmony and Moderation of Between Defect Liability and Default Liability in the Construction Contract (도급계약에서 하자담보책임과 채무불이행책임의 조화와 중용 - 대법원 2020.6.11. 선고 2020다201156판결에 대한 고찰 -)

  • Ahn, Sanghyo;Sin, Manjoong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.65-75
    • /
    • 2022
  • On 11 June 2021, the Supreme Court ruled that the judgment of the lower court was justified for the subject case, that the plaintiff could assert the defendant's liability for default due to incomplete performance even though the warranty period for defects which stipulated in the particular condition of the contract has expired. In Korean civil law, the concurrent between the exclusion period for defect warranty and the extinctive prescription for default liability is conceded, since the exclusion period and the extinctive prescription have their respective purposes in law, therefore these two should be judged by harmonizing them based on that they are mutually related. If the subject judgment is generalized, there is no reason to exist for the provisions of defect liability in the construction contract any longer. This study examines the subject judgments through the general theory and precedent case studies on the defect liability and default liability, then derived any problems that may arise if the subject judgment is generalized. In addition, based on a realistic model, it was suggested for a practical improvement method that both the provisions of the warranty period shall be changed realistic and to stipulate the character of its nature as written provisions in the contract.

A Legal Study on the Standard for Conformity of the Goods in the International Sale of Goods (국제물품매매계약상(國際物品賣買契約上) 물품일치성(物品一致性)의 기준(基準)에 관한 법리적(法理的) 고찰(考察))

  • Song, Myeong-Bok
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.12
    • /
    • pp.133-162
    • /
    • 1999
  • The international sale transaction is in essence a sale of goods and presents all those commercial and legal problems in any sale of goods. As a result, A International sales contract imposes several duties on the parties : the seller must deliver the goods and transfer ownership in them, while the buyer must pay the price and take delivery of the goods. However, there are several problems which impede a active transaction between seller and buyer who have their places of business in other countries each other. Therefore, It is necessary to provide the concept on the conformity of goods in the Int'l Sale of Goods. Especially, In our consideration for the point of time when defects occurs, the existence of non-conformity of goods should be judged on the basis of time of delivery rather than time of contract. Moreover, The burden of proof about nonconformity of goods is another fact which make an international dispute between the contractual parties in an international trade. Thus, The consistency in the interpretation of law must be maintained betweened the warranty and seller's liability. In the Uniform Commercial Code and UN Convention, non-conformity of contract is made of contract liability. And in our civil and commercial law provisions of warranty should be understand as the special ones of the provisions of general non-performance of obligation liability. As a result, More concrete study of them is required because they may have a great influence especially on international trade. As a result, We should be our best in finding a helpful and systematic structure that the dualistic structure of nonperformance of obligation liability and warranty liability must be unified by studying the theories of English and American warranty and our legal system, as well as international practice and usage being used in an international trade.

  • PDF

A Breach of Medical Contract and Consolation Money (의료계약상 채무불이행과 위자료)

  • Bong, Youngjun
    • The Korean Society of Law and Medicine
    • /
    • v.14 no.2
    • /
    • pp.217-260
    • /
    • 2013
  • In connection to the civil liability of the medical malpractice, plaintiff and courts are solving the medical disputes with theory of the liability based on tort law. because contract law does not enact the right of claim of solatium and a plaintiff's lawyer and courts hesitate to use contract law. Medical treatment of doctor is main debt in medical contract and its in-complete performance gives rise to the violations of human's life, body and health. Consequently a breach of medical contract leads to violations of person-al rights. These violations spring from liability of contract as well as tort and damages from them are recognized based on medical contract law. A duty of explanation of doctor is a independent and appendant debt to the treatment debt. However its breach provokes violations of human's life, body and health as well as a right self-determination. Therefore consolation money claim should be recognized. In case of the violation of patient's life, body and health, patient's family al-so can demand consolation money due to the violation of their's own mental pain. However in case of the violation of only patient's self-determination without informed concent, they can not demand it by reason of the violation of patient's self-determination. But by reason of the violation of patient's life, body and health that were recognized by proximate causal relation between violation of duty of explanation and abd execution, they can do.

  • PDF

A Study on the Rule of Warranty in the English Law of Marine Insurance (영국 해상보험법상 담보(warranty)에 관한 연구)

  • Shin, Gun-Hoon
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.42
    • /
    • pp.275-305
    • /
    • 2009
  • Marine insurance contracts, which intended to provide indemnity against marine risks upon the payment of price, known as a premium, originated in Northern Italy in the late 12th and early 13th centuries. The law and practice were later introduced into England through the Continent. It is, therefore, quite exact that English and European marine insurance law have common roots. Nevertheless, significant divergences between English and European insurance systems occurred since the late 17th century, mainly due to different approaches adopted by English courts. The rule of warranty in English marine insurance was developed and clarified in the second part of the 18th century by Lord Mansfield, who laid the foundations of the modern English law of marine insurance, and developed different approaches, especially in the field of warranty in marine insurance law. Since the age of Lord Mansfield, English marine insurance law has a unique rule on warranty. This article is, therefore, designed to analyse the overall rule of the rule of warranty in English marine insurance law. The result of analysis are as following. First, warranties are incorporated to serve a very significant function in the law of insurance, that is, confining or determining the scope of the cover agreed by the insurer. From the insurer's point of view, such the function of warranties is crucial, because his liability, agreed on the contract of insurance, largely depend on in, and the warranties, incorporated in the contract play an essential role in assessing the risk. If the warranty is breached, the risk initially agreed is altered and that serves the reason why the insurer is allowed to discharge automatically further liability from the date of breach. Secondly, the term 'warranty' is used to describe a term of the contract in general and insurance contract law, but the breach of which affords different remedies between general contract law and insurance contract law. Thirdly, a express warranty may be in any form of words from which the intention to warrant is to be inferred. An express warranty must be included in, or written upon, the policy, or must be contained in some document incorporated by reference into the policy. It does not matter how this is done. Fourthly, a warranty is a condition precedent to the insurer's liability on the contract, and, therefore, once broken, the insurer automatically ceases to be liable. If the breach pre-dates the attachment of risk, the insurer will never put on risk, whereas if the breach occurs after inception of risk, the insurer remains liable for any losses within the scope of the policy, but has no liability for any subsequent losses. Finally, the requirements on the warranty must be determined in according to the rule of strict construction. As results, it is irrelevant: the reason that a certain warranty is introduced into the contract, whether the warranty is material to the insurer's decision to accept the contract, whether or not the warranty is irrelevant to the risk or a loss, the extent of compliance, that is, whether the requirements on the warranty is complied exactly or substantially, the unreasonableness or hardship of the rule of strict construction, and whether a breach of warranty has been remedied, and the warranty complied with, before loss.

  • PDF

Systematic Improvement for Effective Operation of Long-Term Continuous Construction Contracts (장기계속공사계약의 효율적 운영을 위한 제도 개선)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.3-10
    • /
    • 2019
  • The entire duration of the long-term continuous construction contract project cannot be expected when calculating the initial budget as the construction of the contract is carried out annually according to the budget composition. In addition, the statutes related to the defect liability and execution of contracts have not been established systematically in relation to the contract. Therefore, there are many problems at the actual construction site with regard to the defect liability or the performance of the contract in relation to the contract. In this study, the following improvement directions were presented for the efficient operation of the contracts: First, the defect liability is legal and should be specified in an Act rather than an enforcement decree. Second, if the parties to the contract vary in the following order in the contract, the special agreement should be specified in the enforcement decree. Third, in the event of an indirect cost due to the extension of the period of the long-term continuous work, the contingency items of the total project cost management policy should be utilized. Fourth, in the case of general construction contract conditions, clauses related to the purchase of the premium of the CAR, inspection, taking over, defect repair, and defect inspection shall be supplemented.

A Comparative Study on the Seller's Duty to Deliver the Goods in Conformity with the Contract (국제물품매매계약상 물품의 계약적합성 의무에 관한 비교 연구)

  • Lee, Byung-Mun
    • Korea Trade Review
    • /
    • v.42 no.6
    • /
    • pp.1-25
    • /
    • 2017
  • This is a comparative and analytical study which comprises of the analysis of the rules of the seller's liability for non-conforming goods of four legal systems under the CISG and the CESL. A purpose of this study is to examine all the rules as to, first, the concept and the nature of the seller's duty to deliver the goods in conformity with the contract, second, the contents of the seller's duty to deliver the goods in conformity with the contract, third, the time when the goods must be in conformity with the contract and the cases where the seller is exempted from his liability for non-conforming goods. Another purpose is to compare the rules of the CISG with those of the CESL, and to evaluate them in light of the discipline of comparative law. This is for the purpose of facilitating the systematic development and reform of one jurisdiction by any solution from the other jurisdiction found by the comparative study. In addition, this study provides legal and practical advice to the contracting parties when they intend to use one of those regimes in their contract as a governing law.

  • PDF