The Transactions of The Korean Institute of Electrical Engineers
/
v.57
no.3
/
pp.439-445
/
2008
In this paper, the preliminary EMC analysis process between the Communication, Ocean and Meteorological Satellite (COMS) and Geostationary Earth Orbit (GEO) launch vehicles in the frequency range [1MHz-47MHz] is described. The considered launch vehicles are arian V, sea Launch, land Launch, atlas III&V, delta IV, proton M/breeze M, soyuz, HII-A and Angara. The launch vehicle Radiated Emission (RE) specifications have been compared to COMS satellite Radiated Susceptibility (RS) limits. The COMS RS limits are the RS qualification levels of COMS units during launch. As a result, The radiated emission levels of arian V, sea launch, atlas III&V, delta IV, proton M/breeze M, HII-A and angara are compliant with COMS RS limits. The negative margins appear between land launch or soyuz launch vehicle RE and COMS RS. Then, if the land launch or soyuz is chosen by the customer, The tests should be performed at satellite level in order to demonstrate the compatibility with respect to launch vehicles specifications.
Korea Aerospace Research Institute has developed an earth observation satellite whose primary mission objective is to provide high resolution electro optical earth images for Geographical Information Systems (GIS) establishment and the applications for environmental, agriculture and ocean monitoring. It was successfully launched into its mission orbit by using a commercial launch vehicle on 18th of May, 2012. This paper describes a series of launch activity at the launch site including its transportation to the launch site. Before conducting the launch site operation, satellite operation plane was prepared. Combining the satellite operation plan and launch vehicle activities, an integrated launch site operation plan and schedule have been drawn up. After arrival of the spacecraft at the launch site, post-ship check out has been conducted. And then it was fuel loaded and integrated with launch vehicle hardware. After completion of final electrical check out, count down procedure was executed. on 18th of May, it was launched into the space and was separated from the launch vehicle as planned. About 3 months of early operation and calibration/validation, now the satellite is conducting its normal mission.
The purpose of this paper is to examine empirically how to balance advertising expenditure before and after launch with regard to the direction of word of mouth in the motion picture industry. The vector auto-regression model is applied to assess the dynamic impact of advertising and word of mouth on sales. Empirical data, including advertising, word of mouth, and sales (the number of entries) of 83 movies are used for analysis. The research results show that for a movie having more positive word of mouth in the pre- and post-launch periods, it is worthwhile to spend the advertising budget in the pre-launch period only and to spare it in post-launch period. However, it is worthwhile to spare the advertising budget in the pre-launch period for movies having less positive word of mouth before and after launch, and to concentrate spending in post-launch period instead. Mangers who handle products and services facing shortened lifecycles, such as games, eBooks, and digital music contents, need to check the quality of pre-launch word of mouth for their advertising budget decisions in the pre- and post-launch periods and spend more of the advertising budget in the post- (pre-) launch period if pre-launch word of mouth is negative (positive). For products and services with a shortened lifecycle, it is recommended to spend more of the advertising budget in the post- (pre-) launch period if pre-launch word of mouth is negative (positive).
Journal of the Korean Society for Aeronautical & Space Sciences
/
v.36
no.3
/
pp.291-297
/
2008
The launch of the COMS by using Ariane-5 launch vehicle is introduced. First, the COMS is introduced briefly, and then, the Ariane-5 launch vehicle is introduced including detail description of the improvement of Vulcain-1 engine of Ariane-5G to Vulcain-2 engine of Ariane-5ECA for 20% increase of thrust. Then, the launch process of the COMS is introduced. The COMS will be launched from the Guiana Space Center in Kourou, French Guiana. After the final check at PPF the COMS is transferred to HPF in the same building for fueling, and it is integrated to the launch vehicle adaptor at HPF, too. Then, this assembly is transferred to Final Assembly Building. After the satellites to be launched together are integrated to the launch vehicle on the launch table in the Final Assembly Building, the launch table loaded with the launch vehicle is moved to the launch pad for launch. The events during the launch vehicle flight is also introduced.
Daerae Kim;Chankyoung Lim;Seongpil Yang;Yeongho Lee
Journal of the Korean Society of Propulsion Engineers
/
v.26
no.5
/
pp.52-62
/
2022
A launch vehicle is a one of the biggest hardware among the products of human technology. For huge size launch vehicles, to transport to Launch Complex and to erect on launch pad precisely and safely is very critical issue. Therefore, a final assembly, transportation, erection and holding in vertical position in launch pad requires very precise operational technology, processes and related aggregates. Those operational concept has been developed to comply with the requirement of each launch vehicle and technology level at that time. In this paper, a progress of operational methodology in global launch vehicles are described. In addition, methodologies used on the KSLV-1 Naro and the KSLV-II Nuri launch vehicle are introduced.
Proceedings of the Korea Society for Simulation Conference
/
2005.05a
/
pp.106-111
/
2005
LCC(Launch Control Center) in NARO Space Center perform a data monitoring and control through the interface to the external system of launch vehicle. Launch Control function needs a high reliability and processing speed. Hence, LCC's remote control system configure a real time system. An important role of the Simulation system is discovering a risk element and minimize it When developing a launch control system. Also, secure a development technique to solve the risks. Launch Vehicle simulator is composed of various component at characteristic of the Launch Vehicle. To be like this each function component the developer will be able to develop easily in order, it using the LabVIEW which is a Graphical Program and it programs, The LabVIEW GOOP(Graphical Object-orinted Programming) which supports an Object-orinted programming it uses with the Component it develops will have a strong point which reusability and a unit test, maintenance, size of program and individual developments.
The Transactions of The Korean Institute of Electrical Engineers
/
v.59
no.4
/
pp.774-778
/
2010
In this paper, the preliminary EMC analysis process between the Communication, Ocean and Meteorological Satellite (COMS) and the Geostationary Earth Orbit (GEO) launch vehicles in the frequency range is described. The considered launch vehicles are Arian Ⅴ, Sea Launch, Land Launch, Atlas III&Ⅴ, Delta IV, Proton M/breeze M, Soyuz, H II-Aa. The launch vehicle Radiated Susceptibility (RS) specifications have been compared to COMS satellite Radiated Emission (RE) limits. The COMS Radiated Emission (RE) level is determined by calculating the radiated field equal to the quadratic sum of radiated emissions of each equipment switched "ON" during launch. As a result, The RS requirements of Arian V, Atlas III&V and Delta IV lauchers are compliant with COMS RE limits. The negative margins appear between the others launch vehicle RS (Sea Launch, Land Launch, Proton M/Breeze M, Soyuz and H II-A) and COMS RE. Then, if the launchers that have negative margin were chosen by the customer, The EMC tests should be performed at satellite level in order to demonstrate the compatibility with respect to launch vehicles requirements.
Bogie(The Launch vehicle transporter) is the special land transportation vehicle for the LV (Launch vehicle) which is used for not only the transportation-means of LV from LVAB(Launch Vehicle Assembly Building) to LP(Launch Pad) but also one of principal tools for launch operation sequence. Due to the multi-role of Bogie, The technical requirements of bogie are very complicated. Especially launch operation has performed with not only bogie but also many ground support equipments. So, it is impossible to establish technical requirements of bogie without whole understanding of launch operation. This paper was made for arranging whole launch operation sequence and technical requirements of bogie based on the this sequence.
Earth to Mars ballistic mission opportunities from Naro Space Center are studied. Determining ballistic mission opportunities can be divided into two major parts, i.e. the launch window and the daily launch window determination. At the launch window determination parts, Porkchop diagrams of Earth launch C3 magnitude, total mission duration, declination of $V_{\infty}$ vector at the Earth launch, and declination & right ascension of $V_{\infty}$ vector at the Mars arrival are examined. The location of launch site and rotation effects of the Earth are considered during the daily launch window determination parts. Using Lambert method, various Porkchop diagrams of launching in 2027 are examined for example. The daily launch window of Naro Space Center at that year was checked to verify the launch possibility by comparing with the Kennedy Space Center.
Journal of the Korean Society for Aeronautical & Space Sciences
/
v.43
no.10
/
pp.936-942
/
2015
This paper suggests the significant strategies and their priority to deal with space transportation market trends. First, market trends related with technical improvement and change in demand are analyzed by the literature research. The three key trends are obtained: 'Increasing Demand of High-Performance Launch Vehicles', 'Rising of Low-Price Launch Vehicles', and 'Rising of Dual/Multi-Launch'. And then, strategies for developing the launch vehicle industry in Korea are selected from several studies about commercialization of Korean launch vehicle. The strategies are evaluated by the experts through pairwise comparison matrix and the criteria for this process is how significantly does the strategy effect on the launch vehicle industry through market assessment. As a result, reliable order of priority among the strategies are obtained. Under the three key trends, strategy to enhance reliability is most important. And, strategy to have price competitiveness has secondary priority to deal with 'Rising of Low-Price Launch Vehicles' trend and 'Rising of Dual/Multi-Launch' trend. On the contrary, strategy of government's support is secondary under 'Increasing Demand of High-Performance Launch Vehicles' trend.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.