Browse > Article
http://dx.doi.org/10.6108/KSPE.2022.26.5.052

A Study on Operational Concepts on Final Assembly-Transportation-Erection Methodology of Launch Vehicles  

Daerae Kim (Launch Complex Development Team, Korea Aerospace Research Institute)
Chankyoung Lim (Launch Complex Development Team, Korea Aerospace Research Institute)
Seongpil Yang (Launch Complex Development Team, Korea Aerospace Research Institute)
Yeongho Lee (Launch Complex Development Team, Korea Aerospace Research Institute)
Publication Information
Journal of the Korean Society of Propulsion Engineers / v.26, no.5, 2022 , pp. 52-62 More about this Journal
Abstract
A launch vehicle is a one of the biggest hardware among the products of human technology. For huge size launch vehicles, to transport to Launch Complex and to erect on launch pad precisely and safely is very critical issue. Therefore, a final assembly, transportation, erection and holding in vertical position in launch pad requires very precise operational technology, processes and related aggregates. Those operational concept has been developed to comply with the requirement of each launch vehicle and technology level at that time. In this paper, a progress of operational methodology in global launch vehicles are described. In addition, methodologies used on the KSLV-1 Naro and the KSLV-II Nuri launch vehicle are introduced.
Keywords
Launch Operation; Transportation and Erection of Launch Vehicle; Launch Pad; KSLV II; Assembly Building;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Steven, J. Isakowitz, Joseph, P. Hopkins Jr., and Joshua B. Hopkins, International Reference Guide to Space Launch Systems, 4th ed., AIAA, Virginia, U.S.A., 2004. 
2 "First stage of an Delta II 7925 on a truck trailer," retrieved 12 Sep. 2021 from https://commons.wikimedia.org/wiki/File:Thor_XLT_first_stage_of_an_Delta_II_7925_rocket.jpg. 
3 "The first stage of the Delta II for ACE is erected," retrieved 12 Sep. 2021 from https://commons.wikimedia.org/wiki/File:First_stage_of_a_Delta_II_rocket.jpg. 
4 "Next generation NASA satellite set to improve weather forecast," retrieved 13 Sep. 2021 from https://www.zmescience.com/space/next-generation-nasa-satellite-set-to-improve-weather-forecast.
5 "Delta II Second Stage Engine," retrieved 13 Sep. 2021 from https://www.nasa.gov/mission_pages/NPP/multimedia/gallery/2011-08-02-2.html. 
6 "Mobile Service Tower rolls over the Delta II on SLC-2W after first launch attempt," retrieved 12 Sep. 2021 from https://commons.wikimedia.org/wiki/File:Mobile_Service_Tower_rolls_over_the_Delta_II_on_SLC-2W.jpg. 
7 "PSLV-C44 first stage inside Mobile Service Tower," retrieved 20 Nov. 2021 from https://en.wikipedia.org/wiki/Polar_Satellite_Launch_Vehicle#/media/File:PSLV-C44_Integrated_upto_First_Stage_inside_Mobile_Service_Tower.jpg. 
8 "PSLV-C50 second stage with Vikas engine," retrieved 20 Nov. 2021 from https://en.wikipedia.org/wiki/Polar_Satellite_Launch_Vehicle#/media/File:PSLV_C50_second_stage_with_Vikas_engine.jpg. 
9 "PSLV C29 at First Launch Pad of Satish Dhawan Space Centre, Sriharikota Range," retrieved 20 Nov. 2021 from https://ko.wikipedia.org/wiki/PSLV#/media/file:PSLV-CA-C29.jpg. 
10 "Initial Ariane 5 assembly is completed for Arianespace's July mission with the MSG-4 and Star One C4 satellites," retrieved 11 Nov. 2021. from https://www.arianespace.com/mission-update/initial-ariane-5-assembly-is-completed-for-arianespaces-july-mission-with-the-msg-4-and-star-one-c4-satellites/. 
11 "Ariane 5 launch vehicle being transported from the Launcher Integration Building (BIL) to the Final Assembly Building (BAF)," retrieved 12 Nov. 2021. from https://www.spaceflightinsider.com/organizations/arianespace/ariane-5-send-duo-communications-satellites-orbit/attachment/ariane-5-kopia/. 
12 "Assembly and launch facilities," retrieved 9 Nov. 2021 from https://ariane5.cnes.fr/en/assembly-and-launch-facilities. 
13 "Ariane 5ES with ATV 4 on its way to ELA-3," retrieved 10 Nov. 2021 from https://en.wikipedia.org/wiki/File:Ariane_5ES_with_ATV_4_on_its_way_to_ELA-3.jpg. 
14 "ELA-3 ground infrastructure. This is where Ariane 5 is launched," retrieved 9 Nov. 2021. from https://www.ohb.de/en/magazine/provider-of-equipment-of-space-transportation. 
15 "Falcon 9 Flight 1 Mission - Highlights," retrieved 22 Jan. 2019 from https://www.youtube.com/watch?v=H6hYEqrP56I. 
16 Lim, C.K., Kim, D.R., Yang, S.P., Lee, Y.H. and Kang, S.I., "The Operation Concept and Procedure of Mechanical Ground Support Equipment for KSLV-II Launch Complex," Journal of the Korean Society of Propulsion Engineers, Vol. 22, No. 4, pp. 125-132, 2018. 
17 "The gateway to the moon," retrieved 27 Feb. 2022 from https://apollo11space.com/nasas-gateway-to-space/. 
18 "The Mobile Service Structure," retrieved 27 Feb. 2022 from http://apollolaunchcontrol.com/v20test/http___www.apollolaunchcontrol.com_/Mobile_Service_Structure.html. 
19 "The Soyuz site at Europe's Spaceport in French Guiana," retrieved 9 May 2021 from https://galileognss.eu/the-soyuz-site-at-europes-spaceport-in-french-guiana/. 
20 Kang, S.I. and Nam, J.W., "Introduction of Fuel Ground Support Equipment of Launch Complex for KSLV-1 NARO Launch Operations," Proceedings of KSAS 2013 Fall Conference, Jeju, Korea, pp. 1427-1431, Nov. 2013. 
21 Kang, S.I., Oh, H.Y. and Kim, D.R., "Basic Design of Propellant Ground Support Equipment and Flame Deflector for KSLV-II Launch Complex," Journal of the Korean Society of Propulsion Engineers, Vol. 19, No. 1, pp. 76-86, 2015.    DOI
22 Jang, J.T., Jung, I.H., Ahn, J.C., Moon, K.R., Ra, S.H. and Lyou, J., "Construction of Control System for Ground Equipments of KSLV-1 Launch Complex," 2013 Conference on Information and Control Systems, Boryeong, Korea, pp. 1-2, Oct. 2013. 
23 Moon, K.R., Ahn, J.C., Jung, I.H., Hong, I.H. and Kang, S.I., "Development of Technological Equipment Power Supply System in KSLV-II Launch Complex," 2017 KSPE Spring Conference, Jeju, Korea, pp. 36-40, May 2017.