• Title/Summary/Keyword: Large-scale Building

Search Result 695, Processing Time 0.034 seconds

Design and Implementation of Cloud-based Data Management System for Large-scale USN (대규모 USN을 위한 클라우드기반 데이터 관리 시스템 설계 및 구현)

  • Kim, Kyong-Og;Jeong, Kyong-Jin;Park, Kyoung-Wook;Kim, Jong-Chan;Jang, Moon-Suk
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2010.10a
    • /
    • pp.352-354
    • /
    • 2010
  • Recently, the efficient management system for large-scale sensor data has been required due to the increasing deployment of large-scale sensor networks. In previous studies, sensor data was managed by distributed database system which built in a single server or a grid server. Thus, it has disadvantages such as low scalability, and high cost of building or managing the system. In this paper, we propose a cloud-based sensor data management system with low cast, high scalability, and efficiency. The proposed system can be work with the application of a variety of platforms, because processed results are provided through REST-based web service.

  • PDF

Hot- Fire Injector Test for Determination of Combustion Stability Boundaries Using Model Chamber

  • Sohn Chae Hoon;Seol Woo-Seok;Shibanov Alexander A.;Pikalov Valery P.
    • Journal of Mechanical Science and Technology
    • /
    • v.19 no.9
    • /
    • pp.1821-1832
    • /
    • 2005
  • This study realizes the conceptual method to predict combustion instability in actual full-scale combustion chamber of rocket engines by experimental tests with model (sub-scale) chamber. The model chamber was designed based on the methodologies proposed in the previous work regarding geometrical dimensions and operating conditions, and hot-fire test procedures were followed to obtain stability boundaries. From the experimental tests, two instability regions are presented by the parameters of combustion-chamber pressure and mixture (oxidizer/fuel) ratio, which are customary for combustor designers. It is found that instability characteristics in the chamber with the adopted jet injectors can be explained by the correlation between the characteristic burning or mixing time and the characteristic acoustic time: In each instability region, dynamic behaviors of flames are investigated to verify the hydrodynamically-derived characteristic lengths of the jet injectors. Large-amplitude pressure oscillation observed in upper instability region is found to be generated by lifted-off flames.

R&D OF FREEZING AND REFRIGERATION SYSTEM USING CHP. (가역 화학 열 펌프(CHP)를 이용한 냉장.냉동 시스템 개발 연구)

  • 이종호;김석종
    • Proceedings of the Korea Society for Energy Engineering kosee Conference
    • /
    • 1996.04a
    • /
    • pp.132-135
    • /
    • 1996
  • This study is to develop an ammonia based chemical heat pump(STELF) for a freezing and refrigeration system coupled to gas, fuel and/or waste from industrial processes as heat sources. Recently it has been continually taking a growing interest in chemical heat pumps without electric power and having higher COP's than those of existing compression type refrigeration systems using freon. By introducing STELF technology, efficient heat recovery utilizing enormous amount of waste heat in energy consuming large scale industries or building for their own refrigeration purposes is possible. Moreover, air-conditioning systems coupled to city gas for small scale industries or building can be realized. Therefore, STELF technology can contribute much for overall energy savings and efficient energy management.

  • PDF

Review on Research and Development of Shale Gas in China

  • Zhuang, Li;Kim, Kwang Yeom;Sun, Zhi-xue;Li, Yan-chao
    • The Journal of Engineering Geology
    • /
    • v.25 no.3
    • /
    • pp.323-329
    • /
    • 2015
  • Shale gas reserves in China are large, although shale gas production is still in its infancy. This paper reviews Chinese national policies and guidelines related to shale gas development, in particular those related to recent progress in the development of shale gas reserves in Sichuan Province and Chongqing since February 2015. In addition, three large-scale R&D projects related to shale gas development, funded by the Government of China, are introduced, and the scope of the work in each project is described.

Shanghai Korean Restaurant Interior Planning, CHINA (중국 상해 한국 레스토랑 실내디자인 기본계획)

  • Suh, Seung-Ha
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2004.11a
    • /
    • pp.187-190
    • /
    • 2004
  • The world has been transfiguring so rapidly thesedays. Especially, Shanghai, the symbol of the modernization of China, its speed is now so transcendental, indeed. A lot of Korean companies have made inroads into the China market so actively. There a building called PosPlaza was investigated by PohangJechul(POSCO) in the financial business trade area of Pudong, Shanghai. It has a main building of thirty-four stories with an industrial of four stories as an office area, which is now perceived as a symbolic architecture of Pudong. As for many employers who needed a large-scale restaurant, it was planned to pursue the convenience, to feel the Korean traditions and the cozy of the sunshine through the large flat window with the simplicity as the people enter the main hall.

  • PDF

A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System (성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구)

  • Lee, Sang-Hyun;Kim, Woo-Joong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF

Experimental Research of Map Building and Localization at Human Co-existing Real Environments

  • Lee, Dong-Heui;Chung, Woo-Jin;Kim, Mun-Sang
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.1184-1189
    • /
    • 2003
  • Map building and position estimation capabilities are practically indispensable for a mobile robot to execute its given tasks in its working environments. An autonomous map building method and a smart localization method is proposed in our previous works. The experimental verifications are carried out in this paper. We applied the proposed algorithms to mobile service robots in large-scale indoor buildings. Experimental results show that our strategy is reliable and feasible in tough conditions like non-polygonal and dynamic environments. The advantages of the algorithms are well-illustrated through real experiments.

  • PDF

A Continuous Wavelet Study on Approach Wind and Building Pressure (접근풍속과 건물 변동풍압력에 대한 연속파동변화법의 적용)

  • Ham, Hee-Jung
    • Journal of Industrial Technology
    • /
    • v.25 no.B
    • /
    • pp.89-97
    • /
    • 2005
  • Application of proper orthogonal decomposition (POD) and continuous wavelet transform (CWT) is introduced to study wind speed and building roof pressures of flow separation region. In this study, a detailed analysis of the approach wind flow, wind-induced building pressure and the relation between the two fields was carried out using the POD technique and CWT analysis. The results show potential of the application of POD and CWT in characterization of spatio-temporal and spectral properties of the approach wind and its induced dynamic pressure events. Some of findings resulting from the application of this analysis can be summarized as follows: (1) The POD first principal coordinate of the roof pressure in the separated shear layer is closely correlated with the longitudinal component of oncoming flow. (2) The CWT analysis suggests that the extreme peak pressure in the separated shear layer is due to condensed large-scale eddy motions.

  • PDF

A Study on Program Development for Preventive Maintenance of Electrical Facilities (전기수용설비 예방보전을 위한 보수지원용 프로그램 개발)

  • Kim, Se-Dong;Choi, Do-Hyuk;Ryu, Seung-Ki
    • Proceedings of the KIEE Conference
    • /
    • 1996.07a
    • /
    • pp.232-234
    • /
    • 1996
  • As a building is getting large-scale, composition and intelligence, it is required the stability of building electrical facilities. And it is very difficult of rapidly repair on a breakdown of building electrical facilities. Therefore high-reliability and efficiency of building safety is required. And thus, this study presents the repair-maintenance support program for preventive maintenance on a builing electrical facilities. This program makes offer some functions, facilities history input mode, checking and result mode. User can be made offer the cause and effect information of facilities-faults by this preventive maintenance program.

  • PDF

Assessment of Fire Evacuation Safety for Building Construction (건축물 건설공사시 화재피난안전성 평가에 관한 연구)

  • Jeong, Myeong-Jin;Lee, Myeong-Gu;Ham, Eun-Gu
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.6
    • /
    • pp.119-124
    • /
    • 2014
  • Recently buildings are constructed in larger and higher scales and becoming more complex. However from small to large scale buildings and on construction sites there still are fire safety accidents that occur continuously. Therefore this study is aimed to assess of evacuation safety for building construction by use of simulation. On this study, the evacuation times required were estimated for the permissible evacuation times in cases. Fire safety management plans were suggested for building construction.