• Title/Summary/Keyword: Large Construction Projects

Search Result 460, Processing Time 0.041 seconds

A STUDY ON THE SELECTION CRITERIA OF DELIVERY SYSTEM BY TYPES OF THE PUBLIC CONSTRUCTION PROJECTS

  • Eun-A Choi;Su-Man Choi;Jai-Dong Koo;Nam-Gi Lim;Sang-Beom Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1440-1445
    • /
    • 2009
  • Clients demands have been changed by construction circumstances such as high-technology, megaprojects, and the complexity of construction. Advanced foreign nations have already introduced and applied new project delivery systems (i.e, CM, DB, etc.) to deal with the change of such that. Korea has also promoted variation of the delivery systems for the progressive measure to the rapid changeable situation. Even though government has made his efforts as stated above, some clients have uniformly used those to public construction projects. That is because there are not selection criteria of project delivery system for clients. Therefore, this study presented the selection criteria of project delivery system based on project types in the public large construction projects. In addition, the study has verified the viability of the presented models through consultation with professionals and experts.

  • PDF

LESSONS LEARNT IN THE IMPLEMENTATION OF DEVELOPMENT PROJECTS IN SOUTH AFRICA

  • Wellington Didibhuku Thwala
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.364-367
    • /
    • 2011
  • The levels of unemployment and poverty are extremely high and two of South Africa's most pressing problems. There is also a widely acknowledged need for housing and municipal infrastructure (water supply, sewerage, streets, storm water drainage, and electricity, refuse collection). From a theoretical perspective supported by experience elsewhere in Africa, there are reasons for considering that properly formulated employment creation programmes based on the use of labour-intensive methods could be established to construct and maintain the required physical infrastructure, thus creating employment, skills and institutional capacities. Over the past 30 years several projects have been initiated in South Africa to counter unemployment and poverty. Given the socio-economic conditions and political objectives (regarding development, employment creation and alleviation of poverty), it is anticipated that future large-scale construction projects will be proposed by the public sector (National, Provincial and Local Government). The paper will first examine the main tenets of the implementation of development projects through the use of labour-intensive construction and a description of progress elsewhere in Africa and their potential contribution which public works programmes could make to alleviate the poverty and unemployment problems. The research will then analyse the successes and challenges that have been experienced in South Africa in relation to the implementation of development projects over the past 30 years. The paper closes with recommendations and lessons for the future.

  • PDF

INTERNATIONAL PROJECT MANAGEMENT OF SUZHOU SCIENCE AND CULTURAL ART CENTRE AND SUZHOU INTERNATIONAL EXPO CENTRE

  • Tan Wei Szu Jackson
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.19-29
    • /
    • 2007
  • This paper shares our project management experience in the 2 large-scale projects in managing a diverse international project team of consultants and managing in a foreign land. The first part introduces the two projects, second part addresses management of the projects and the last portion presents some of the challenges we experienced and highlights the importance of understanding the peculiarities of the operating environment, their norms, cultures, effectiveness and limitations of conventional project management tools while operating in a foreign country.

  • PDF

Feasibility Analysis Information Model for Road Construction Projects (도로 프로젝트의 타당성분석 정보모델 구축방안)

  • Yang Jin-Kook;Kim Soo-Yong;An Dong-Geun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.379-384
    • /
    • 2002
  • A road construction project needs a large scale of investment and tine. In this study, we will review some elements of feasibility analysis and derive points of the existing analyses. And we make some suggestions to improve the existing methods. We propose a 'A Feasibility Information System' for road construction projects. The system will be useful to make a feasibility study for road construction project and help us to predict risks in process of the projects.

  • PDF

A Study on the Effects of Risk Perception and Opportunism on the Project Performance (위험인식과 기회주의 행동이 프로젝트 성과에 미치는 영향에 관한 연구)

  • Yoon, Chang Soo;Jo, Dong Hyuk
    • Journal of Korean Society for Quality Management
    • /
    • v.50 no.1
    • /
    • pp.63-76
    • /
    • 2022
  • Purpose: The purpose of this study is to analyze the effects of risk perception and opportunistic behavior on project performance and the moderating effect of cooperation in this relationship through literature review to identify factors affecting the performance of large-scale nuclear power plant construction projects. Methods: This study conducted a survey on nuclear power plant construction project participants and verified the hypothesis using statistical methods. Results: The results of this study are as follows; First, risk perception appeared to have a positive effect on opportunistic behavior, and it was confirmed that opportunistic behavior among participating companies could occur even in nuclear power plant construction projects. Second, it has been proven that risk perception has a negative effect on project performance as suggested in previous studies. Third, in the relationship between opportunistic behavior and project performance, it was found that opportunistic behavior had a negative effect on project performance. Finally, cooperation was found to have a moderating effect on the relationship between performance risk and project performance. Conclusion: This study is a case of empirical analysis targeting nuclear power plant construction project workers, and provided a basis for reference in future related academic research and project implementation.

The Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects (공동주택 건설공사의 발주방식 영향요인 분석)

  • Moon, Hyun-Seok;Hong, Tae-Hoon;Koo, Gyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.75-84
    • /
    • 2008
  • Recently, construction industry demands have been changed by domestic construction circumstances such as high-technology, mega-projects, and the complexity of construction. In order to deal with the change of such a domestic construction circumstances, the Ministry of Construction and Transportation (MOCT) has introduced advanced delivery methods. However, the advantages and disadvantages of the advanced delivery methods have not been effectively applied for previous projects. The reason for this is that the "Reviewing Standard for the Large-scale Construction Bidding Method" has not reflected enough prcject characteristics when the delivery method is selected in the project planning phase. Therefore, this paper proposes the Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects.

Risk-based Decision Model to Estimate the Contingency for Large Construction Projects (리스크 분석에 기초한 대형건설공사의 예비비 산정에 관한 연구)

  • Kim Du-Yon;Han Goo-Soo;Han Seung-Hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.485-490
    • /
    • 2003
  • Nowadays the rapid change in construction environment getting more globalized and complicated has caused lots of unexpected risks from inside and out of the country, so more sophisticated construction management strategies are being strongly needed. This paper suggests a risk management model with which we can estimate the appropriate contingency by quantifying the amount of probable risks immanent in large construction projects, which have a high degree of uncertainty in the anticipation of the total construction cost. To develop the model, the risk factors that make cost variations are elicited based on the real data of the contingencies assigned to the past projects. Furthermore, the influential relationship of risk factors is structured by applying the CRM(Cost Risk Model) which is the synthetic model of Monte Carlo Simulation, Influence Diagram and Decision Tree. The ultimate outcome of this research can by validated by tile case study with a large construction project performed.

  • PDF

Development of Feasibility Analysis Model for Developer-requested Housing Projects (공동주택 개발사업 참여결정을 위한 사업타당성 분석모델 개발)

  • Kim, Ki-Shin;Lee, Joong-Seok;Huh, Young-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.3
    • /
    • pp.117-125
    • /
    • 2009
  • With construction industry recession, many construction companies are increasingly conducting the development projects by themselves. However, housing projects requested by developers still stand large portion. Although many studies on feasibility analysis were released, they mainly focused on economic feasibility and lacked research on factors and criterions of overall project. Also, because previous studies overly break downed factors related to project, they rarely used in practice. Therefore, this study developed the feasibility analysis model of housing development projects to help main contractors to easily and effectively decide if it is feasible enough to promote the projects requested by developers, and verified the reliability of the model. In this study, thirty one driving factors were identified under seven different categories and the criterion of each factor was also developed. The survey on important index of each factor found 'salability', 'economic feasibility', 'site location' and 'method of raising fund' significant. 12 projects were tested by the model and its results showed resonable reliability.

Development of an Application Prototype for Small-Scale Construction Safety Management (소규모 건축공사 안전관리용 애플리케이션 프로토타입 개발)

  • Kim, Jae-Yeob;Lim, Hyeong-Eun;Kim, Eun-Ho
    • Journal of the Regional Association of Architectural Institute of Korea
    • /
    • v.21 no.6
    • /
    • pp.65-71
    • /
    • 2019
  • In Korea, there is a lack of adequate safety management for small-scale construction work, particularly when compared to large-scale construction projects. The number of construction disasters is also higher on small-scale construction sites. In this regard, this study aimed to develop the application prototype to support the safety management of small-scale construction projects. The major findings of the research are as follows. 1) About 60% of construction disasters and death occurred on small-scale construction sites over the last two years. In addition, institutional support and costs for safety management were found to be insufficient. 2) The items of the application for the small-scale construction safety management were constructed on the basis of the safety management of large-scale construction work. The contents of the application were confirmed based on a survey of small-scale construction project managers. 3) The application algorithm was developed with a focus on the roles of management subjects and information exchange. For transition from the application prototype presented in this study to a commercial product, further research needs to be conducted regarding the reflection of user requirements and application management subjects.

BIM-BASED TIME SERIES COST MODEL FOR BUILDING PROJECTS: FOCUSING ON MATERIAL PRICES

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.1-6
    • /
    • 2011
  • As large-scale building projects have recently increased for the residential, commercial and office facilities, construction costs for these projects have become a matter of great concern, due to their significant construction cost implications, as well as unpredictable market conditions and fluctuations in the rate of inflation during the projects' long-term construction periods. In particular, recent volatile fluctuations of construction material prices fueled such problems as cost forecasting. This research develops a time series model using the Box-Jenkins approach and material price time series data in Korea in order to forecast trends in the unit prices of required materials. Building information modeling (BIM) approaches are also used to analyze injection times of construction resources and to conduct quantity take-off so that total material prices can be forecast. To determine an optimal time series model for forecasting price trends, comparative analysis of predictability of tentative autoregressive integrated moving average (ARIMA) models is conducted. The proposed BIM-based time series forecasting model can help to deal with sudden changes in economic conditions by estimating material prices that correspond to resource injection times.

  • PDF