• 제목/요약/키워드: LNG Plant Construction

검색결과 52건 처리시간 0.026초

LNG 플랜트 공사의 PMIS 개발방향에 관한 기초연구 (A study on the development direction for PMIS in LNG plant construction)

  • 한재구;진경호;박환표
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.298-300
    • /
    • 2013
  • Depending on the very large and complicated of the LNG plant project, for the successful execution of the project, the operating system that is seamlessly integrated in EPC phase is needed. Therefore, we surveyed and analyzed the PMIS development and application status in domestic and international plant construction. Based on the results of the research, we proposed the development direction for PMIS in LNG plant construction.

  • PDF

LNG 하역 플랜트의 Off Shore 배관시공절차 확립에 관한 연구 (Establishment of Construction Procedure on the Off Shore Piping Work of a LNG Unloading Project)

  • 김용탄;문승재;유호선
    • 플랜트 저널
    • /
    • 제5권4호
    • /
    • pp.80-85
    • /
    • 2009
  • LNG stevedoring plant offshore pipelines requires human power and the longest construction period in constructing LNG storing terminal and influences on the success of the project absolutely. In this paper, the constructing procedures of LNG stevedoring plant offshore pipeline was established. Establishment of constructing procedures of LNG stevedoring plant offshore pipeline includes procurement of main equipments, iron frame and pipelines. To predict any expectable problems, that may occur by the stage of construction the application to the field works with a base of theoretical and practical contents for the constructing procedures of LNG stevedoring plant offshore pipelines can be established.

  • PDF

LNG 공사의 건설사업관리 의사결정지원모델 개발 - 시공단계 중심 - (Development of a Decision Making Model for Construction Management in LNG Plant Construction - Focused on Construction Stage -)

  • 박환표;한재구;진경호
    • 한국건설관리학회논문집
    • /
    • 제15권3호
    • /
    • pp.47-57
    • /
    • 2014
  • LNG 플랜트사업은 그 특성상 해외에서 사업을 추진하기 때문에 사업관리도 일반적인 사업관리방식과는 차이점이 있다. LNG 플랜트 사업 프로세스는 가스탐사 및 생산, 물리적인 액화 및 화학적인 전환공정, 수송, 저장 등의 가치사슬로 구성되며, 주로 천연가스를 액체원료나 연료로 전환하는 장치를 중심으로 액화공정(초저온 액화) 및 FEED 패키지, 제어 운영, 건설수행 등 EPC 기술을 대상으로 하고 있다. 이러한 해외에서 수행되고 복잡한 LNG 플랜트공사의 성공은 사업관리 의사결정에 따른 사업의 성패가 달라질 수 있다. 따라서 본 연구는 LNG 플랜트공사의 시공단계 사업관리 의사결정지원 모델을 구축하기 위하여 EPC 단계별로 9개의 사업관리요소 항목을 도출하고, 각 항목별 중요도를 평가하였다. 중요도 평가결과, EPC 단계별로 사업관리와 리스크관리 항목이 공통적으로 중요한 것으로 도출되었다. 특히 본 연구는 사업관리 요소항목과 중요도 평가결과를 기반으로 LNG 플랜트공사의 시공단계의 의사결정지원모델을 개발하였다. 개발된 의사결정지원모델은 향후 시공단계의 사업관리 의사결정지원 시스템 구축의 기반이 될 것이다.

THE RESEARCH ON CONCEPTUAL MODEL OF LNG PLANT PROJECT PLANNING EXPERT SYSTEM

  • Moon-Sun Park;Young-Ai Kim;Seung-Wook Lee;Sung-Ryul Bae;Hyun-Wook Kang;Byoung-Jun Min;Yong-Su Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1570-1575
    • /
    • 2009
  • The purpose of this research is to propose the conceptual model of Scenario-based Project Planning Expert System which has not been used in domestic LNG plant industry. This research examines data on the plant project planning expert system of domestic and oversea, analyzes the components of project planning expert systems and benchmark excellent cases. The conceptual model of LNG plant project planning expert system is established through the procedure as has been noted above. The results of this research are as follows: First, this research draws out such components of LNG plant project planning expert system as feasibility, cost control, contract management and risk management. Second, this research proposes the conceptual model of LNG plant project planning expert system which core module is consist of feasibility evaluation, life cycle cost evaluation and decision making. Finally, each module of LNG plant project planning expert system would be integrated into the Scenario-based Project Planning Expert System.

  • PDF

LNG선 개조 발전플랜트 기획연구 (Planning research for Floating Power Plant by modifying LNG carriers)

  • 이강기;배재류;신재웅;박종복
    • 플랜트 저널
    • /
    • 제16권3호
    • /
    • pp.37-41
    • /
    • 2020
  • 최근 노후화된 LNG선박의 증가, 선박가격 하락으로 중고 LNG선 재활용 가능성이 증대되고 있다.또한 노후발전소 대체관련 Needs가 늘고 있으며 가스생산량 증가 및 친환경 연료가 각광받고 있어 가스 발전플랜트 매력도도 상승하고 있다. 이에 본 연구에서는 중고 LNG선을 개조하여 LNG저장 및 발전플랜트 기능을 갖추게 하고 이밖에 재기화기능,벙커링 기능을 갖춘 복합기능 플랜트에 대한 기획연구를 수행하였다.이를 통해 노후 화력발전 중단,원전해체 등으로 인한 에너지 공백을 대체하고 국가 위기사태에 이동형 발전 플랜트를 긴급으로 투입가능해지며 대북 경협 등 정책에 새로운 대안으로 활용할 수 있다.

LNG 플랜트 공정계통의 실패율이 가용도에 미치는 영향에 관한 연구 (A Study on the Availability with Failure Rate of Process for LNG Plant)

  • 강경원;윤명오;이홍철;황인주
    • 설비공학논문집
    • /
    • 제24권4호
    • /
    • pp.358-363
    • /
    • 2012
  • The simulation investigation on the availability of LNG plant with scenario of failure events and failure rate has been carried out. This study focuses on the availability, productivity, criticality induced by failure rate of major equipment. The methodologies for simulation such as the equipment classification of LNG plant and failure type and event schematic are established. The availability and mean time to repair have second order function profile in the all cases except general equipment, but these profiles have different inclination. The production and criticality of the specified LNG plant, simulated by Monte-Carlo algorithm, is located in the range of P = 86~92% and PL = 6~13%.

LNG발전소 입지선정에 관한 주민 수용성 제고연구 (On the Social Acceptance of Site Selection for a LNG Power Plant)

  • 박동규;이재헌
    • 플랜트 저널
    • /
    • 제18권3호
    • /
    • pp.41-51
    • /
    • 2022
  • 최근 LNG발전소 건설이 늘어나고 주민들의 삶의 질 향상 욕구가 증가함에 따라 건설 추진과정에서 주민과의 갈등으로 인한 건설사업 지연으로 전력수급 안정화를 저해하거나 사회적 비용이 증가하는 실정이다. 이에 주민 수용성 강화방안을 연구하여 추후 발전소 건설추진에 도움이 되었으면 하는 바람에서 이 연구를 하였다. 여기서는 주민들의 반대가 가장 심한 단계이며 사업 지연으로 인한 경제적·사회적 손실발생은 물론 극단적일 경우 사업취소까지 연결될 수 있는 입지선정 단계에 한해서 연구를 하였다. 이를 위해 최근 10년 이내 준공한 LNG발전소 준공지연사례를 통해 수많은 발전소가 당초 계획보다 짧게는 수개월에서 길게는 몇 년씩 준공이 지연된 사례를 살펴보았으며, 특히 음성천연가스발전소와 대구LNG발전소 건설 준비중 갈등사례를 분석하여 주민 수용성 제고를 위해서는 첫째 발전소 입지 선정 시 주민의견 수렴이 필요함을 알 수 있었고 둘째 발전소 주변지역 지원에 관한 법률 정비 등 법규 개정이 수반되어야 하며 셋째 발전설비 최신기종 선정 등 환경 친화적 설비구성에 최선을 다해야 함을 알 수 있었다.

  • PDF

API RP 581 Code를 기반으로한 LNG 플랜트의 Risk-Based Inspection(RBI) 기술 개발 (Development of Risk-Based Inspection(RBI) Technology for LNG Plant Based on API RP581 Code)

  • 최송천;최재붕;황인주
    • Corrosion Science and Technology
    • /
    • 제11권5호
    • /
    • pp.179-183
    • /
    • 2012
  • As one of promising solutions to overcome high oil price and energy crisis, the construction market of high value-added LNG plants is spotlighted world widely. The purpose of this study is to introduce LNG-RBI system to develop risk assessment technology with RAM(Reliability, Availability, Maintainability) modules against overseas monopolization. After analyzing relevant specific features and their technical levels, risk assessment program, non-destructive reliability evaluation strategy and safety criteria unification class are derived as core technologies. These IT-based convergence technologies can be used for enhancement of LNG plant efficiency, in which the modular parts are related to a system with artificial optimized algorithms as well as diverse databases of facility inspection and diagnosis fields.

해외 LNG Plant 프로젝트 초기 프로세스 분석 및 지식관리시스템 프로토타입 구축 (Analysis of Pre-construction Processes and Development of KMS Prototype of LNG Plant Projects)

  • 원서경;이준복;한충희
    • 한국건축시공학회지
    • /
    • 제9권6호
    • /
    • pp.151-159
    • /
    • 2009
  • 최근 LNG 수요 증가로 인한 해외 LNG 플랜트 프로젝트의 지속적인 발주 증가로 국내 건설업체의 해외 진출이 크게 증가하고 있다. 또한 시공 및 사업관리 기술의 발전으로 예전에 비해 고부가가치를 창출할 수 있는 기회가 많아지고 있다. 그러나 일부 선도기업을 제외한 대부분의 중견 건설업체는 고급 인력과 실무 경험의 부족으로 인한 어려움을 겪고 있는 실정이다. 선진기업의 경우 체계화된 업무 프로세스 구축을 통해 이러한 어려움을 해결하였다. 이에 본 연구에서는 플랜트 사업의 생애주기 업무 프로세스 중 시공 전 단계를 대상으로 업무를 규명하고 지식관리 항목을 포함한 상세 프로세스를 분석하였다. 이는 전체 생애주기 업무 프로세스를 분석하고 표준화하는 연구의 사전 단계로 향후 지식관리 시스템을 개발하여 통합관리를 하는데 활용 할 수 있을 것으로 기대한다.

해외 LNG 플랜트 리스크요인 도출 및 우선순위 평가 - 설계단계를 중심으로 - (Risk Identification and Priority method for Overseas LNG Plant Projects - Focusing on Design Phase -)

  • 장우식;홍화욱;한승헌
    • 한국건설관리학회논문집
    • /
    • 제12권5호
    • /
    • pp.146-154
    • /
    • 2011
  • 국내 건설기업은 1960년대 처음으로 해외건설시장에 진출한 이래 지속적으로 성장해왔으며 2010년에는 해외건설시장에서 716억 달러를 수주하는 등 국가 경제에 많은 기여를 해왔다. 특히 플랜트산업의 경우 2010년에 사상 최대인 574억 달러를 수주하여 전제 해외건설 수주금액의 80% 이상을 차지하였다. 그럼에도 불구하고 국내 건설기업은 해외 선전기업에 비해 설계단계의 기술경쟁력 부족 및 사업관리 능력의 부족으로 해외 플랜트 사업을 수행하는데 있어 어려움이 크다. 본 연구는 최근 국제 유가의 상승, 에너지 수요의 증가, 친환경 건설에 대한 관심의 증가로 시장규모가 확대되고 있는 해외 LNG 플랜트사업의 수익률 안정을 위해 설계단계의 리스크를 규명하고, 이를 보다 합리적으로 평가하기 위한 방법을 제시하였다. 본 연구의 결과로서 첫째, 기존문헌의 분석, 기업 설계보고서, 전문가 인터뷰를 통해 해외 플랜트 설계단계에서 총 57개 리스크 요인을 도출하였다. 둘째 기존의 우선순위 평가방법(이축, PI)에 플랜트의 특성을 반영 할 수 있는 조정지수(Coordination Index, CI)를 추가하여 해외 LNG 플랜트 설계단계에 보다 적합한 삼축(PIC)우선순위 평가방법을 제시하였다. 마지막으로 전문가 설문조사 및 인터뷰를 통해 삼축 평가방법의 적절성 및 실무 적용성을 확인하였다. 따라서 국내 건설기업이 자신의 경험을 바탕으로 본 연구에서 제시된 리스크 요인과 평가방법을 해외 LNG 플랜트 설계단계에 적용한다면, 보다 합리적이고 객관적인 리스크 관리가 가능할 것으로 기대된다.