Abstract
Recently, LNG power plants are increasing drastically and the desire of an improvement in the quality of life is growing. The delay of power plant construction can hinder the stability of power supply and increase the cost. So this study was conducted to help power plant construction progressing from now on by studying on the social acceptance of a LNG power plant. On this study I limited the scope of the study to the stage of Site Selection which is the most conflict stage and can interrupt the project. To conduct this study I researched the recently constructed power plants which have been delayed, in particular Eumseong Natural Power Plant and Daegu LNG Power Plant which are under bitter conflicts with local residents and have difficulty in construction progressing. So I found out that it is very important to collect the opinions of the residents in the stage of Site Selection and it is necessary to change ACT ON ASSISTANCE TO ELECTRIC POWER PLANTS- NEIGHBORING AREAS. Lastly it is very important to adapt the state-of-the-art facilities to increase the social acceptance of a LNG power plant.
최근 LNG발전소 건설이 늘어나고 주민들의 삶의 질 향상 욕구가 증가함에 따라 건설 추진과정에서 주민과의 갈등으로 인한 건설사업 지연으로 전력수급 안정화를 저해하거나 사회적 비용이 증가하는 실정이다. 이에 주민 수용성 강화방안을 연구하여 추후 발전소 건설추진에 도움이 되었으면 하는 바람에서 이 연구를 하였다. 여기서는 주민들의 반대가 가장 심한 단계이며 사업 지연으로 인한 경제적·사회적 손실발생은 물론 극단적일 경우 사업취소까지 연결될 수 있는 입지선정 단계에 한해서 연구를 하였다. 이를 위해 최근 10년 이내 준공한 LNG발전소 준공지연사례를 통해 수많은 발전소가 당초 계획보다 짧게는 수개월에서 길게는 몇 년씩 준공이 지연된 사례를 살펴보았으며, 특히 음성천연가스발전소와 대구LNG발전소 건설 준비중 갈등사례를 분석하여 주민 수용성 제고를 위해서는 첫째 발전소 입지 선정 시 주민의견 수렴이 필요함을 알 수 있었고 둘째 발전소 주변지역 지원에 관한 법률 정비 등 법규 개정이 수반되어야 하며 셋째 발전설비 최신기종 선정 등 환경 친화적 설비구성에 최선을 다해야 함을 알 수 있었다.