A study on the development direction for PMIS in LNG plant construction (LNG 플랜트 공사의 PMIS 개발방향에 관한 기초연구)

  • Han, Jae-Goo;Chin, Kyng-Ho;Park, Hwan-Pyo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.298-300
    • /
    • 2013
  • Depending on the very large and complicated of the LNG plant project, for the successful execution of the project, the operating system that is seamlessly integrated in EPC phase is needed. Therefore, we surveyed and analyzed the PMIS development and application status in domestic and international plant construction. Based on the results of the research, we proposed the development direction for PMIS in LNG plant construction.

  • PDF

Establishment of Construction Procedure on the Off Shore Piping Work of a LNG Unloading Project (LNG 하역 플랜트의 Off Shore 배관시공절차 확립에 관한 연구)

  • Kim, Yong-Tan;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.4
    • /
    • pp.80-85
    • /
    • 2009
  • LNG stevedoring plant offshore pipelines requires human power and the longest construction period in constructing LNG storing terminal and influences on the success of the project absolutely. In this paper, the constructing procedures of LNG stevedoring plant offshore pipeline was established. Establishment of constructing procedures of LNG stevedoring plant offshore pipeline includes procurement of main equipments, iron frame and pipelines. To predict any expectable problems, that may occur by the stage of construction the application to the field works with a base of theoretical and practical contents for the constructing procedures of LNG stevedoring plant offshore pipelines can be established.

  • PDF

Development of a Decision Making Model for Construction Management in LNG Plant Construction - Focused on Construction Stage - (LNG 공사의 건설사업관리 의사결정지원모델 개발 - 시공단계 중심 -)

  • Park, Hwan Pyo;Han, Jae Goo;Chin, Kyung Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.47-57
    • /
    • 2014
  • LNG plant projects tend to be implemented in overseas owing to its characteristics, so their project management scheme is somewhat different from those of general projects. Value chain in a LNG plant project includes exploration/production of gases, physical liquefaction/chemical conversion processes, transportation and storage. Key factors in the chain include liquefaction process (including ultra-low temperature liquefaction) to convert natural gas into liquid materials or fuel, and Front End Engineering Design (FEED) package, as well as Engineering, Procurement and Construction (EPC) technology comprising control, operation and construction. Success of a complex LNG plant project implemented in overseas depends on decision-making process in project management. Accordingly, to develop a decision-making model in of plant construction, the study extracted none factors in project management by EPC stage and assessed importance of each factor. The result showed that items in both project management and project risk management are important. Especially, the study developed a decision-making model in the construction stage of a LNG plant project based on the project management factors and importance assessment. The developed decision-making model would lay groundwork in building a decision-making system in construction stage of project management.

THE RESEARCH ON CONCEPTUAL MODEL OF LNG PLANT PROJECT PLANNING EXPERT SYSTEM

  • Moon-Sun Park;Young-Ai Kim;Seung-Wook Lee;Sung-Ryul Bae;Hyun-Wook Kang;Byoung-Jun Min;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1570-1575
    • /
    • 2009
  • The purpose of this research is to propose the conceptual model of Scenario-based Project Planning Expert System which has not been used in domestic LNG plant industry. This research examines data on the plant project planning expert system of domestic and oversea, analyzes the components of project planning expert systems and benchmark excellent cases. The conceptual model of LNG plant project planning expert system is established through the procedure as has been noted above. The results of this research are as follows: First, this research draws out such components of LNG plant project planning expert system as feasibility, cost control, contract management and risk management. Second, this research proposes the conceptual model of LNG plant project planning expert system which core module is consist of feasibility evaluation, life cycle cost evaluation and decision making. Finally, each module of LNG plant project planning expert system would be integrated into the Scenario-based Project Planning Expert System.

  • PDF

Planning research for Floating Power Plant by modifying LNG carriers (LNG선 개조 발전플랜트 기획연구)

  • Lee, Kangki;Bae, Jaeryu;Shin, Jaewoong;Park, Jongbok
    • Plant Journal
    • /
    • v.16 no.3
    • /
    • pp.37-41
    • /
    • 2020
  • Lately old LNG carriers increased and ship price is getting down. So Interest for reuse and modification of used LNG carriers is growing. Also the needs for replacement of old power plant is increasing. Additionally eco friendly fuel such as LNG become attractive. Consequently gas power plant is getting much more popular than before. So in this research planning, we consider the floating power plant by modifying LNG carriers. This plant has the various function including storage, power plant and bunkering fuction etc. Through this multifunctional plant, we are ready for the old power plant shutdown and energy crisis in the future when we can supply the urgent mobile floating power plant quickly in time.

A Study on the Availability with Failure Rate of Process for LNG Plant (LNG 플랜트 공정계통의 실패율이 가용도에 미치는 영향에 관한 연구)

  • Kang, Kyung-Won;Yoon, Myung-O;Lee, Hong-Cheol;Hwang, In-Ju
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.24 no.4
    • /
    • pp.358-363
    • /
    • 2012
  • The simulation investigation on the availability of LNG plant with scenario of failure events and failure rate has been carried out. This study focuses on the availability, productivity, criticality induced by failure rate of major equipment. The methodologies for simulation such as the equipment classification of LNG plant and failure type and event schematic are established. The availability and mean time to repair have second order function profile in the all cases except general equipment, but these profiles have different inclination. The production and criticality of the specified LNG plant, simulated by Monte-Carlo algorithm, is located in the range of P = 86~92% and PL = 6~13%.

On the Social Acceptance of Site Selection for a LNG Power Plant (LNG발전소 입지선정에 관한 주민 수용성 제고연구)

  • Park, Dongkyu;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.18 no.3
    • /
    • pp.41-51
    • /
    • 2022
  • Recently, LNG power plants are increasing drastically and the desire of an improvement in the quality of life is growing. The delay of power plant construction can hinder the stability of power supply and increase the cost. So this study was conducted to help power plant construction progressing from now on by studying on the social acceptance of a LNG power plant. On this study I limited the scope of the study to the stage of Site Selection which is the most conflict stage and can interrupt the project. To conduct this study I researched the recently constructed power plants which have been delayed, in particular Eumseong Natural Power Plant and Daegu LNG Power Plant which are under bitter conflicts with local residents and have difficulty in construction progressing. So I found out that it is very important to collect the opinions of the residents in the stage of Site Selection and it is necessary to change ACT ON ASSISTANCE TO ELECTRIC POWER PLANTS- NEIGHBORING AREAS. Lastly it is very important to adapt the state-of-the-art facilities to increase the social acceptance of a LNG power plant.

  • PDF

Development of Risk-Based Inspection(RBI) Technology for LNG Plant Based on API RP581 Code (API RP 581 Code를 기반으로한 LNG 플랜트의 Risk-Based Inspection(RBI) 기술 개발)

  • Choi, Song-Chun;Choi, Jae-Boong;Hawang, In-Ju
    • Corrosion Science and Technology
    • /
    • v.11 no.5
    • /
    • pp.179-183
    • /
    • 2012
  • As one of promising solutions to overcome high oil price and energy crisis, the construction market of high value-added LNG plants is spotlighted world widely. The purpose of this study is to introduce LNG-RBI system to develop risk assessment technology with RAM(Reliability, Availability, Maintainability) modules against overseas monopolization. After analyzing relevant specific features and their technical levels, risk assessment program, non-destructive reliability evaluation strategy and safety criteria unification class are derived as core technologies. These IT-based convergence technologies can be used for enhancement of LNG plant efficiency, in which the modular parts are related to a system with artificial optimized algorithms as well as diverse databases of facility inspection and diagnosis fields.

Analysis of Pre-construction Processes and Development of KMS Prototype of LNG Plant Projects (해외 LNG Plant 프로젝트 초기 프로세스 분석 및 지식관리시스템 프로토타입 구축)

  • Won, Seo-Kyung;Lee, Jun-Bok;Han, Choong-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.151-159
    • /
    • 2009
  • Recently, overseas construction projects have been increasing in the Middle East and Southeast Asia regions. These projects require various licenses and technologies for the manufacturing and handling processes. Additionally, the efficiency of the entire process management life cycle determines the success or failure of the business. Nonetheless, there exist various risks involved in the whole life cycle process due to a lack of experience and knowledge of management techniques. The objective of this paper is to analyze the business process of a LNG plant throughout the pre-construction and procurement phases, and to identify the knowledge and information needed for the development of the KMS. The study also plans to build a comprehensive knowledge management system throughout the whole life cycle as its final objective.

Risk Identification and Priority method for Overseas LNG Plant Projects - Focusing on Design Phase - (해외 LNG 플랜트 리스크요인 도출 및 우선순위 평가 - 설계단계를 중심으로 -)

  • Jang, Woo-Sik;Hong, Hwa-Uk;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.146-154
    • /
    • 2011
  • Korean contractors have been maintained sustainable growth since entering into overseas construction market for the first time in 1960' s. In 2010, Korean contractors ordered 761 billion (USD) from overseas markets. Especially, billion (USD) were earned by Korean contractors in overseas plant construction market which account for more than 80% of the total amount by Korean contractors. Nevertheless, many Korean contractors are suffering from lack of technological competitiveness and construction management skills in the design phase compared with global leading contractors. These conditions have directly effect on the success of projects in terms of cost, duration, and quality. So, this study focused on identifying the risk factors and developing risk priority method for the design phase of LNG plant projects whose market is expanding. Research procedures were conducted by the following three steps. First, total 57 risk factors were identified in design phase through extensive literature reviews and experts survey. Second, the authors developed risk priority method which are more suitable for design phase of LNG plant projects by using three criteria, Probability(P), Impact(I), and Coordination Index(CI). Finally, the suitability of risk priority method and practical applicability were verified through expert survey and interview. Consequently, if korean contractors use the suggested risk factors and priority method based on their own know-how and experiences, then more reasonable and rational risk management will be conducted in the design phase of LNG plant projects.