• 제목/요약/키워드: Korean national highway

검색결과 541건 처리시간 0.023초

고속도로 절·성토 비탈면 녹화 공법의 적용 실태 연구 (An Analytical Study on the Revegetation Methods for Highway Slopes)

  • 김남춘;송호경;박관수;전기성;이상화;이병준
    • 한국환경복원기술학회지
    • /
    • 제10권2호
    • /
    • pp.1-15
    • /
    • 2007
  • A variety of revegetation methods are being utilized and developed. However, most of revegetation methods used on highway slopes in Korea are based on foreign-introduced plant varieties to stabilize road surfaces and to administer afforestation for surface covering at an earlier phase. Therefore. it results in various problems. such as failure to achieve harmony with the surrounding vegetation and 10 cause re-denudation of slopes as the foreign-in introduced plant varieties wane out from 2~3 years after hydro-seeding, etc. In addition, some of the revegetation plants seeded in the earlier phase grow excessively high, thus causes successional problems, such as to inhibit the invasion of the secondary vegetation from the surrounding areas, etc. Therefore, in this study, 160 slopes located in the nationwide express highways have been investigated and analyzed in order to produce basic data for restoration of ecological environment in slopes created on a long-term basis by investigating and analyzing locational characteristics of cut and filled slopes in express highways, status of revegetation methods, characteristics of soil and plant-ecological environment. 1. Investigation on cut and embanked slopes in express highways was carried out in the total of 160 locations, which include 108 cut slopes and 52 embanked slopes. As a whole, the most frequently used revegetation method was seed spray, which was found to be used in the total of 55 target slops investigated. 2. Planting method of Wistaria floribunda applied to some of the blasted rock zones was found to cause damages as Wistaria floribunda trailed up the surrounding vegetation and the secondary invaded trees. In order to prevent this, this method must be used only in the lowest parts of large-sized slopes. Also, it will be required to administer continuous management and maintenance in the areas already planted with this plants. 3. The areas of blasted rock and ripping rock slopes were applied with coir net (net + seeding) method. However, many of these areas failed in achieving ground covering. Most areas where revegetation was in progress, they were covered with Eragrostis curvula(Weeping lovegrass) only. In areas with soil, such as decomposition of granite, where afforestation is difficult. In this slopes, soil base must be improved by hrdroseeding with thin-layer vegetation base application methods in order to achieve success in afforestation with native plants. 4. Woody species, rather than herb species, are more helpful in stabilization of slope surfaces. Therefore, it is important to be able to grow and protect woody species on highway slopes. Growth of woody vegetation is most largely influenced by soil depth. Thus, when hydro-seeding woody plants, it is recommended to apply at the upper layer of the slopes, which is capable to sufficiently provide the fundamentals required in plant growth.

집산로가 설치된 고속도로 위빙구간 유출입부 설계기준 제시 (Determination of Weaving Section at Highway Collector-Distrivutor)

  • 오재철;김윤미;이형무;하태준
    • 대한토목학회논문집
    • /
    • 제38권6호
    • /
    • pp.879-885
    • /
    • 2018
  • 고속도로 위빙구간은 진입과 진출차량에 의한 상충이 발생되는 지점으로 본선과의 영향을 최소화하기 위하여 집산로를 설치토록 하고 있다. 집산로의 설계속도는 50km/h이나 실제 운전자는 설계속도에 맞춰 적정한 감속이 이루어지지 않고 있다. 따라서 본 연구에서는 운전행태, 설계기준차량제원, 운전자의 시야각등을 고려하여 차량의 안전한 진출입을 위해 고어 노면표시 끝에서 합류지점까지 적정 이격거리를 검토하였으며 분석결과 합류가능지점에서 약 60m의 이격거리가 필요한 것으로 분석되었다. 향후 본 연구결과를 집산로가 설치된 위빙구간에 적용시 진출입 차량간 상충으로 인한 운전자의 안전성 증진에 기여할 것으로 판단되며 집산로가 설치된 고속도로 위빙구간의 노면표시 설치기준으로 재정립 될 것으로 기대된다.

K 최대근접이웃 방법을 이용한 통행시간 예측에 대한 연구 (A Study of Travel Time Prediction using K-Nearest Neighborhood Method)

  • 임성한;이향미;박성룡;허태영
    • 응용통계연구
    • /
    • 제26권5호
    • /
    • pp.835-845
    • /
    • 2013
  • 통행시간은 교통정보 중에서 가장 대표적이고 이용자 선호도가 높은 정보이다. 본 연구에서는 일반국도를 대상으로 실시간 시스템에 적용 가능한 통행시간 예측 방법을 개발하고자 하였다. 통행시간 예측방법으로 비모수적 접근 방법인 K 최대근접이웃 방법을 적용하였다. K 최대근접이웃 방법은 데이터에 대한 특별한 가정이 필요 없고, 모수 추정 과정이 필요 없어 실시간 교통관리시스템에 적합하다. K 최대근접이웃 방법의 우수성을 평가하기 위해 교통 분야에서 많이 적용되고 있는 이력자료 평균방법과 칼만 필터방법을 선정하여 평균절대백분율오차와 변동계수를 통해 평가하였다. 평가 결과 K 최대근접이웃 방법이 이력자료 평균방법과 칼만 필터방법에 비해 우수한 것으로 분석되었다. 통행시간 정보 제공 시 본 연구에서 개발된 방법을 통해 도출된 통행시간과 구간검지기로부터 관측된 통행시간을 탄력적으로 적용함으로써 통행시간 정보의 신뢰도를 향상시킬 수 있을 것으로 기대된다.

교통사고심각도 영향요인 분석에 관한 연구 - 곡선부가 포함된 국도를 중심으로 - (Analysis on Factors Affecting Traffic Accident Severity - Case Study : Arterial Included Curve Section -)

  • 박재홍;윤덕근;성정곤
    • 한국안전학회지
    • /
    • 제28권6호
    • /
    • pp.84-89
    • /
    • 2013
  • The main causes of traffic accidents can be classified by 3 factors - human error, vehicle deficiency and road environmental problem and most accidents occurs not only 1 factor but combination of 2 or 3-factors. Among these factors, road environmental factor is the most important factor due to influence the behavior of cars and road users and road environmental factor affects 30% of total accidents approximately. The 5 years traffic accidents data analyzed to verify the accidents severity on Korea National Highways. In order to analyze the severity, Ordered Probit Model was used. As a independent variables of this model the number of lane, neighbor road environments, sight distance, vertical grade, lane width, shoulder width and traffic volume were used and as a dependent variables the minor injuries, serious injuries and fatalities were used. Research results shows that sight distance and lane width are identified as significant factors for the traffic accident severity and lesser sight distance and lane width shows greater traffic accident severity.

고속도로 강우 유출수내 오염물질의 EMC 및 부하량 원단위 산정 (Determination of Event Mean Concentrations and Pollutant Loadings in Highway Storm Runoff)

  • 김이형;강주현
    • 한국물환경학회지
    • /
    • 제20권6호
    • /
    • pp.631-640
    • /
    • 2004
  • This research was conducted to understand the magnitude and nature of the stormwater emissions with the goal of quantifying stormwater pollutant concentrations and mass emission rates of pollutants. Eight highway sites in Southern California area were monitored for three years with collecting of grab and flow-weighted composite samples, rainfall and runoff flow. Generally the EMCs cannot be determined by simple statistical averaging of measured pollutant concentrations because of random characteristics of runoff quality and quantity. Therefore, this manuscripts will show a new EMC determination method. The EMC ranges of 95% confidence intervals are 102.78-216.37mg/L for TSS, 104.53-251.79mg/L for COD, 5.42-10.58mg/L for oil & grease and 2.42-10.18mg/L for TKN. The ranges of washed-off mass loading are determined to $0.06g/m^2-17.27g/m^2$ for TSS and $0.1-3.23g/m^2$for COD.

강우시 발생하는 고속도로 유출수의 초기우수 특성 및 기준 (Characteristics of First Flush in Highway Storm Runoff)

  • 김이형;강주현
    • 한국물환경학회지
    • /
    • 제20권6호
    • /
    • pp.641-646
    • /
    • 2004
  • Vehicle emissions from highway landuse include different pollutants such as heavy metals, oil and grease and particulates from fuels, brake pad wear and tire wear. Since highways are impervious and have high pollutant mass emissions from vehicular activity, it is considered as stormwater intensive landuses. Therefore this research was performed to understand the magnitude of first flush and to suggest the criteria of first flush for storm runoff management in highways. The fractions of washed-off mass are very high in first 30% of runoff volume, which suggests a definition of first flush. The washed-off mass stabilizes after 30% of the runoff volume and it is apparent that treatment capacity in the early part of a storm is more valuable than treatment capacity in the later part of the storm. Using the criteria of "high" first flush and "medium" first flush, as 50% of the mass in the first 30% of the volume, and 30 to 50% in the first 30% volume, respectively, more than 30% of the storms showed high first flush. A "first flush friendly" best management practice(BMP), meaning a BMP that can treat a high percentage or all of the initial flow, would be advantageous up to 80% of the events.

Utilization of Fly Ash in Asphaltic Concrete Mixtures

  • Min, Jeong-Ki
    • 한국농공학회지
    • /
    • 제42권
    • /
    • pp.85-91
    • /
    • 2000
  • Dwindling supplies and increasing costs of conventional highway materials used in road construction as well as concerns over shrinking landfill spaces prompt researchers to investigate the use of waste products, such as fly ash, as substitute materials in highway construction. The highway industry is capable of utilizing waste materials in large quantities if their effect on pavement performance proves to be technically, economically and environmentally satisfactory. This research examines the effects of fly ash when used as partial replacement of aggregate in asphaltic concrete mixtures. And measuring the effect of fly ash on bulk specific gravity, air void, indirect tensile strength (ITS) under dry and wet conditioning as well as the tensile strength ratio (TSR) of asphaltic concrete mixture. The results indicated that asphaltic concrete mixtures containing 2% and 5% fly ash produced about the same TSR value as control mixture. And all of the mixtures met the minimum ITS and TSR requirements established by the South Carolina Department of Transportation (SC DOT) for Type 1A surface courses. At this point and with this limited study, these asphaltic concrete mixtures is recommended in several applications such as parking lot, secondary roads and driveways.

  • PDF

일반국도 통행시간 추정을 위한 동질구간 기반 지점검지기 배치에 관한 연구 (A Study on Placement of Point Detectors Based on Homogeneous Section for Travel Time Estimation in National Highway)

  • 김성현;임강원;이영인
    • 대한교통학회지
    • /
    • 제24권1호
    • /
    • pp.73-84
    • /
    • 2006
  • 본 연구는 지점검지기의 효율적 배치기준인 동질구간 결정 로직을 정립하고자 수행되었다. 동질구간의 결정은 도로 및 운영조건과 실시간 교통패턴의 변동을 고려하며 시간대별 동질구간 및 최종 동질구간을 결정하였다 교통조건의 동질구간 결정은 실시간 자료에 기반한 군집분석을 이용하였다. 동질구간의 검증을 위해 모든 링크에 검지기를 설치하는 경우와 동질구간에 검지기를 설치하는 경우에 대하여 각각 통행시간 추정력을 비교한 결과 동질구간의 효과가 입증되었다. 본 연구결과는 향후 국토교통관리 및 정보제공시스템에 유용하게 적용될 것으로 기대된다. 본 연구결과에 의하면 본 연구에서 제안한 동질구간 결정 로직을 대규모 국도 ITS 구축사업에 적용할 경우 통행시간 추정력의 향상과 함께 지점검지기의 효율적 배치를 통한 구축 및 운영비용의 절감이 예상된다.

AVI 자료를 이용한 동적 통행시간 예측 (Dynamic Travel Time Prediction Using AVI Data)

  • 장진환;백남철;김성현;변상철
    • 대한교통학회지
    • /
    • 제22권7호
    • /
    • pp.169-175
    • /
    • 2004
  • 본 논문은 일반국도 실시간 통행시간 정보제공을 위한 동적 통행시간 예측모형을 개발했다. 교통정보 제공을 위한 통행시간 예측에 관한 기존의 많은 연구가 있었지만, 우리나라에서 일반국도에 대한 통행시간 예측모형은 아직 없었다. 통행시간 예측을 위해 현재 일반국도 1호선에 약 10km 간격으로 연속하여 설치된 AVI자료를 이용했고, 예측모형 평가를 위한 통행시간 기준값 수집을 위해 프로브차량을 이용했다. 본 논문에 사용된 일반국도 1호선 구간은 잦은 유출 입 지점으로 인해 원시 AVI 자료에 많은 이상치가 관측되었다. 이러한 이상치를 제거하기 위해 저자가 제안한 알고리즘을 사용하여 이상치를 제거한 후, 칼만필터링 알고리즘을 이용하여 통행시간을 예측했다. 수집주기를 달리하여 예측모형을 평가한 결과 5분, 10분, 15분 수집주기에 대해서는 MARE가 $0.061{\sim}0.066$로 비슷하게 나왔고, 30분 수집주기는 0.078로 나와 다소 높은 오차율을 나타냈다.