• Title/Summary/Keyword: Korean high speed train (HSR-350x)

Search Result 58, Processing Time 0.031 seconds

Examination on the variation of ride comfort for korean high speed train through on-line test (시운전 시험을 통한 한국형 고속열차의 승차감 변화추세에 관한 연구)

  • Kim, Young-Guk;Mok, Jin-Yong;Kim, Seog-Won;Park, Chan-Kyeong;Kim, Ki-Hwan;Park, Tae-Won
    • Journal of Sensor Science and Technology
    • /
    • v.14 no.3
    • /
    • pp.144-149
    • /
    • 2005
  • In this paper, we introduce the variation of ride characteristics for HSR 350x(Korea High Speed Train project) through on-line test during about 3 years. The concept of term "ride comfort" is equivocal. Generally it is evaluated as the vehicle vibration. The ride comfort for HSR 350x has been assessed by statistical method according to UIC 513R. The testing results show that HSR 350x has no problems from the viewpoint of the comfort ride on the high speed line and conventional line and that 1st and 2nd suspensions play an important role in the ride characteristics for high speed train.

Installation of semi-active damper to HSR 350x (한국형고속열차 세미액티브 댐퍼 설치 방안)

  • Kim, Sang-Soo;Kim, Seog-Won;Kim, Jong-Sun;Kim, Ki-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1270-1275
    • /
    • 2006
  • Korean Train Express (KTX) has opened to commercial traffic since 2004 at maximum speed 300km/h, and Korea High-speed Railway (HSR-350x) was developed by Korean government, several institutes, and related companies. HSR-350x is now being investigated its performance and tested at the high speed line. In 2004 December, HSR-350x was run over 350km/h and proved its running performance. In vehicle system, the faster the vehicle runs, the more vibration increases. To improve the riding comfort of high-speed trains, it needs to devise the vibration absorber. In this paper, we propose the installation of the semi-active damper to the power car of HSR 350x and present the specification and the damping characteristics.

  • PDF

Prediction and evaluation of ride comfort at high speed above 310 km/h for Korean high speed train (한국형 고속열차에 대한 고속(310 km/h 이상) 영역에서의 승차감 예측 및 평가)

  • Kim, Seog-Won;Mok, Jin-Yong;Kim, Sang-Su;Kim, Young-Guk
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.268-273
    • /
    • 2006
  • The ride comfort is more important in the train speedup. Generally, it is defined as the vehicle vibration. There are many studies on evaluation method of ride comfort for railway. But the ride comfort for Korean high speed train(HSR 350x) has been assessed by statistical method according to UIC 513R. It is very difficult for HSR 350x to run at constant speeds above 310 km/h during 5 minutes required in UIC 513R because of the same operational condition as KTX and the infrastructures. In this paper, the ride index at high speed above 310 km/h has been predicted by using those obtained below 310 km/h and the comfort for HSR 350x has been reviewed in these speeds.

  • PDF

Analysis and Evaluation of Ride Comfort for High Speed Train using Statistical Method according to UIC 513R (UIC 513R에 따른 통계적 방법을 이용한 고속철도 차량의 승차감 분석 및 평가)

  • 김영국;김석원;목진용;김기환;박태원
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.4
    • /
    • pp.332-338
    • /
    • 2004
  • The two projects about the high speed train have been performed in Korea, one project is the commercial run of high speed train(KTX) from Seoul to Busan and the other is the development of original high speed train(HSR 350x). As the successful results, the service run of KTX had been launched on the 1st of April, 2004 and HSR 350x had been fabricated in June, 2002 and has been tested in the Kyoungbu line and Honam line since then. The railway has the track irregularities which cause vibrations, such as rail joints, turnout, level crossing, transition curves and super-elevation ramps, and variations in the track level(z-axis) and the gauge(y-axis). Generally, the ride comfort for railway is evaluated by using the vibrations. In this paper, the ride comfort indices according to mc 513R and ISO 10056 have been reviewed when the high-speed trains are operated on both Kyoungbu line and Honam line. Also, the ride characteristics for KTX and HSR 350x on the high speed line and the conventional line have been analyzed and evaluated. The results show that the high-speed train has no problem from the viewpoint of the comfort ride on the high speed line and the conventional line and the ride index for HSR 350x is same as that for KTX in the high speed(300 km/h).

Construction of Torque Measurement System for High Speed Railway (고속열차의 동력전달축 부하측정 시스템 구축 방안)

  • Kim, Sang-Soo;Kim, Young-Kuk;Kim, Ki-Hwan;Han, Young-Jae
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.780-785
    • /
    • 2007
  • Korean Train Express (KTX) has opened to commercial traffic since 2004 at maximum speed 300km/h, and Korea High-speed Railway (HSR-350x) was developed by Korean government, several institutes, and related companies. HSR-350x is now being investigated its performance and tested at the high speed line. In 2004 December, HSR-350x was run over 350km/h and proved its running performance. These high speed railways have 12 motors to transfer the traction effort or the braking force. In this paper, authors propose the construction the measurement system for monitoring the force transferred to the train from the motor. The system is installed to the tripod shaft which is located between the reduction gears and it measures the mechanical load directly.

  • PDF

Torque Measurement of Tripod Shaft for HSR-350x (한국형고속열차의 동력전달축 부하측정)

  • Kim, Sang-Soo;Kim, Young-Guk;Kim, Ki-Hwan;Park, Choon-Soo
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.6
    • /
    • pp.660-664
    • /
    • 2007
  • Korea High-speed Railway (HSR-350x) was developed by Korean government, several institutes, and related companies. HSR-350x was investigated its performance and tested at the high speed line. In 2004 December, HSR-350x was run over 350km/h and proved its running performance. And Korean Train Express (KTX) served the commercial traffic for 4 years. These high speed railways have 12 motors to transfer the traction effort or the braking force. To obtain the load of the transfer shaft, it is necessary to measure the transferred torque of the shaft. In this paper, authors propose the construction the measurement system fur monitoring the force transferred to the train from the motor The system was installed to the tripod shaft which is located between the reduction gears and it measures the mechanical load directly.

A Study on Performance Evaluation Plan of Next-Generation High-Speed Prototype Train during Test Run (차세대고속열차 본선 시운전 성능평가 방안에 대한 연구)

  • Kim, Sang-Soo;Choi, Snng-Hoon;Park, Choon-Soo;Kim, Seok-Won;Kim, Ki-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1814-1820
    • /
    • 2010
  • Korean Train Express (KTX) has been commercially operating and achieving elevation on transport capacity since 2004. And the first hish-speed prototype test train, HSR-350x, was developed and succeeded in testing of running over 350km/h. Now KTX-II based on HSR-350x was started in service run. The new high-speed train development project, HEMU-400x project, has started since 2007. The protype train is being designed and manufactured. After the train are developed completely, it will run on the commercial line and will be test to verify the estimated performance. The authors devised the performance evaluation method and process of the HEMU-400x prototype system. And we introduce the definite performance test items and the method to vitrificate them in this paper.

  • PDF

Discussion of the ride comfort for Korean high speed train according to the operational conditions (운행조건에 따른 한국형 고속열차의 승차감에 관한 고찰)

  • Kim, Young-Guk;Kim, Seog-Won;Mok, Jin-Yong;Kim, Ki-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.686-691
    • /
    • 2007
  • The ride comfort is more important according to train speedup. Generally it is defined as the vehicle vibration. There are many studies on evaluation method of ride comfort for railway. In the case of Korean high speed train(HSR 350x), the ride comfort has been assessed by statistical method according to UIC 513R. To verify the design requirements for the performance of HSR 350x, the qualification tests had been conducted from August 19, 2002 to December 2004 and the stabilization and reliability tests are carried out nowadays. Up to December 2006, total test runs and the accumulated milage of the train were 357 times and 164,000km, respectively. A total of 352 ride indices had been acquired through the on-line test from Aug. 2002 to Dec. 2006. In this paper, we have reviewed the characteristics of ride comfort for HSR 350x according to the operational conditions, such as load and track conditions, season and used time, by using the tests data.

  • PDF

Semi-Active Vibration Control for HSR 350x (한국형고속열차 세미액티브 진동 제어)

  • Kim, Sang-Soo;Kim, Young-Kuk;Kim, Ki-Hwan
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2007.11a
    • /
    • pp.169-173
    • /
    • 2007
  • To improve the riding comfort and to increase the speed of high-speed railway, it needs active suspension system for railway more and more. In Korea, Korean Train Express (KTX) was opened to commercial traffic 3years ago. Korea High-speed Railway (HSR 350x) was developed and succeeded 350km/h test run by Korean government and several related institute. With the increase of the speed, the vibration control of the high-speed railway becomes important to improve high ride quality. To meet this request, the authors suggest the installation of lateral semi-active damper to the power car of HSR 350x. The result shows better performance.

  • PDF

A Study on Lateral Vibration Control Method of High-speed Train (고속열차의 횡진동 제어 특성 연구)

  • Kim, Sang-Soo;Kim, Ki-Hwan;Park, Choon-Soo;Mok, Jin-Yong;Choi, Sung-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.969-974
    • /
    • 2008
  • As the railway becomes higher, the reliable stability and riding comfort of higher railway are required. To improve the riding comfort of high-speed trains, it is very helpful to use active suspension system for railway. In Japan, the high-speed train, Shinkansen has adopted semi-active suspension system and now it is running in the main trunk. In this paper, the authors introduce several technical trends of vibration control methods of Japanese Shinkansen. And the installation of semi-active suspension to HSR 350x and the test result of test run on the Kyoung-Bu high speed ling are also explained. After development of HSR 350x, new R&D national project of high speed train is progressed by Ministry of Land, Transport, and Maritime Affairs. This project is the development of Electric Multiple Unit of high speed train with 400km/h of maximum test speed. These result would be helpful to progress next generation high speed project.

  • PDF