Kim, Kyung-Taek;Kim, Jae-Yong;Kim, Yong-Hwan;Park, Jin-Soo;Pyen, Sang-Yun
Proceedings of the KSR Conference
/
2008.06a
/
pp.31-38
/
2008
This Study discussed the roll forming process analysis of levitation rail for urban Maglev vehicle. To verify validity of roll forming process, we analyzed roll forming process for track shoe which is similar to levitation rail. The analysis process was composed of 12 passes and was performed for only 8 passes except overlapping passes. In the variation of temperature with each pass, surface temperature of the structure was cooled from initial $1200^{\circ}C$ to $1010^{\circ}C$ during 30 second before first pass, and central temperature and surface temperature was cooled to $980^{\circ}C$ and $900^{\circ}C$ in final pass, respectively. A length of structure after final pass is about 5 times longer than that before roll forming process. A strain of structure had a higher value in the inner part of the track shoe and show from minimum 2.5 to maximum 6.5. A torque applying on roll appear high in 2, 3 and 4 passes and a maximum value was $27,000ton{\cdot}mm$. Also it was analyzed that a load to the normal direction needs maximum 300ton.
This experiment simulated the fire driven flow of an underground station through parallel processing method. Fire analysis program FDS(Fire Dynamics Simulation), using LES(Large Eddy Simulation), has been used and a 6-node parallel cluster, each node with 3.0Ghz_2set installed, has been used for parallel computation. Simulation model was based on the Kwangju-geumnan subway station. Underground station, and the total time for simulation was set at 600s. First, the whole underground passage was divided to 1-Mesh and 8-Mesh in order to compare the parallel computation of a single CPU and Multi-CPU. With matrix numbers($15{\times}10^6$) more than what a single CPU can handle, fire driven flow from the center of the platform and the subway itself was analyzed. As a result, there seemed to be almost no difference between the single CPU's result and the Multi-CPU's ones. $3{\times}10^6$ grid point one employed to test the computing time with 2CPU and 7CPU computation were computable two times and fire times faster than 1CPU respectively. In this study it was confirmed that CPU could be overcome by using parallel computation.
Kim, Kyung-Taek;Kim, Jae-Yong;Kim, Yong-Hwan;Park, Jin-Soo;Pyen, Sang-Yun
Proceedings of the KSR Conference
/
2008.06a
/
pp.39-45
/
2008
A levitation rail is placed on the top of track structure to operate Maglev vehicles and a part of track that link up with a sleeper is applied repeated load in Maglev vehicles operation. This paper aimed to verify validity of design for levitation rail, through the fatigue analysis about load which is applied to levitation rail in Maglev vehicles operation and impact load occurring in an emergency landing. Load conditions applied design load(23kN/m) in normal operation and skid drop load(24kN/m) in vehicle drop. And boundary conditions are consider bolt fixing and welding. Through static analysis, weak point and maximum stress of levitation rail could be obtained. S-N(stress-life) method was used in oder to predict fatigue life, and Goodman relationship was applied to consider a effect of mean stress. Also damage was calculated by using Miner's. As a result of fatigue analysis, levitation rail had a fatigue life which was more than requirement ($10^6$cycle) in all analysis conditions. Assumption that $10^8{\sim}10^9$cycles is infinite life, all analysis conditions had infinite life except a case under drop load and bolt fixing($1.21{\times}10^6$).
Recently, the expansion of roads are necessary because the population and vehicles have rapidly increased, but those are restricted because of the limited site. JES(Jointed Element Structure) method is the method of the new cross-structure, which is element-traction method which draws and excavates elements under the existing structure with high accuracy within a short time. Also JES(Jointed Element Structure) method has a facility of the economical execution, a small effect on the train-service during construction period and no limit of the crossing length under the trade In this study, the tractive force and settlement are compared with the upper element, side wall element and the lower element respectively in the section which the JES method is applied In the case of element located at left side wall, the tractive force measured by a guage is double or more than the tractive force calculated by a formula. It is expected that many boulder contented in the ground contrary to the site investigation data cause high tractive force. For comparison of the settlement, the settlement as excavating the upper element is the largest in all steps. It is expected that this is the same as the cause of high tractive force. Also in this study, the practical use of the JES method when some under pass structures are extended in the future is studied.
Ha, Jong-Eun;Han, Seon-Ho;Park, Jae-Hong;Lee, Dae-Won
Proceedings of the KSR Conference
/
2006.11b
/
pp.1240-1246
/
2006
Generally, there are two types of main factors to affect output power quality of a auxiliary power supply an EMU(electric multiple unit). One is a voltage flicker by amplitude modulation of short time and air compressors. The other is repetitive motion of large capacity motor such as air compressors, HVAC unit etc. in main factors. This paper compared two kinds of fluorescent lamp, 32W (after remodeling interior) and 40W(before remodeling interior) and measured the light output varying input power(AC220V) for a flicker phenomenon related power supply of lamps in EMU. Also, we analyzed a flicker considering EMU operating time and density in order to grasp main factors of a load change to cause a voltage change. As a results of test, a 40W fluorescent lamp was more insensitive with 20.26% degree an eye recognition degree sides about changes of the input power and lower with 19.9% voltage side generating flicker compare with fluorescent lamp 32W. Also, we confirmed the fact which the fluorescent lamp flicker was generated by varying fluorescent lamp output voltage when the commercial EMU was in high driving density and at the busy time. Additionally, we confirmed the frequency band which an EMU passenger could feel sensitively blinking of a fluorescent lamp was visually $8Hz{\sim}15Hz$.
Japanese railroad companies continued growing by developing diversification based on a railroad enterprise. However, after entering in the 1990s, the diversification model of a railroad company reached the management limit. Under economic depression, A decrease in the birthrate and aging progressed and passenger transport changed to the downward tendency. Nevertheless, since railroad investment was expanded, railroad achievements got worse and price competitiveness with JR East Japan became weak. But the achievements of a diversification section got worse compared with the railroad enterprise. Therefore, group management was thought as important and enterprise reorganization was developed.
For a thorough train control, the precise train position detection is necessarily required. The widely used current way for train position detection is the one of using track circuits. The track circuit has a simple structure, and has a high level of reliability. However trains can be detected only on track circuits, which have to be installed on all ground sections, and much amount of cost for its installation and maintenance is needed. In addition, for the track circuit, only discontinuous position detection is possible because of the features of the closed circuit loop configuration. As the recent advances in telecommunication technologies and high-tech vehicle-based control equipments, for the train position detection, the method to detect positions directly from on trains is being studied. Vehicle-based position detection method is to estimate train positions, speed, timing data continuously, and to use them as the control information. In this paper, the features of GPS navigation and DR navigation are analyzed, and the navigation filters are designed by constructing vehicle-based train position detection method by combining GPS navigation and DR navigation for their complementary cooperation, and by using kalman filter. The position estimation performance of the proposed method is also confirmed by simulations.
Monorail is a type of LRT that a train, made with $2{\sim}4$ cars runs on single track. Monorail can be divided into two types - straddled type, running on track beam and suspended type, running suspended from track beam. After Wuppertal, world's first monorail in German, many monorails are currently operated in Australia, U.S.A, Japan etc. In macountry, it was decided to introduce monorail to 3rd line of Daegue. Daegue's 3rd line is public financial project and supported about 60% of total project cost by central government. The central government announced a standard for rubber-wheel type LRT and steel-wheel type LRT. It becomes a guide to local government willing to introduce this type of LRT. The standard for monorail hasn't announced yet although the necessity of research has grown. Korea Railroad Research Institute which has been asked to research by Ministry of Land Transport and Maritime Affairs has carried out research on standard of monorail considering domestic condition. The on-going research is described in this paper. We wish that it becomes national standard and a good guide for local government.
A girder height limitation is the critical parameter for rapid construction of bridge deck and construction space limitation especially in urban area such as high population area and high density habitats. A standard post-tensioned I-shaped concrete girder usually demands relatively higher girder height in order to retain sufficient moment arm between compression force and tensile force. To elaborate this issue, a small U-shaped section with wide flanges can be used as a possible replacement of I-shaped standard girder. This prestressed concrete box girder allows more flexible girder height adjustment rather than standard I-shaped post-tensioned girder plus additional torsion resistance benefits of closed section. A 30m-long, 1.7m-high and 3.63m-wide actual small prestressed concrete box girder is designed and a laboratory test for its static behaviors by applying 6,200kN amount of load in the form of 4-point bending test was performed. The load-deflection curve and crack patterns at different loading stage are recorded. In addition, to extracting the dynamic characteristics such as natural frequency and damping ratio of this girder, several excitation tests with artificial mechanical exciter with un-symmetric mass are carried out using operational frequency sweep-up. Nonlinear finite element analysis of this 4 point bending test under monotonic static load is investigated and discussed with aids of concrete damaged plasticity formulation using ABAQUS program.
KSCE Journal of Civil and Environmental Engineering Research
/
v.41
no.5
/
pp.533-541
/
2021
Retaining walls have been used to prevent slope failure through resistance of earth pressure in railway, road, nuclear power plant, dam, and river infrastructure. To calculate dynamic earth pressure and determine the characteristics for seismic behavior, many researchers have analyzed the nonlinear response of ground and structure based on various numerical analyses (FLAC, PLAXIS, ABAQUS etc). In addition, seismic fragility evaluation is performed to ensure safety against earthquakes for structures. In this study, we used the FLAC2D program to understand the seismic response of the inverted T-type wall with a backfill slope, and evaluated seismic fragility based on relative horizontal displacements of the wall. Nonlinear site response analysis was performed for each site (S2 and S4) using the seven ground motions to calculate various seismic loadings reflecting site characteristics. The numerical model was validated based on other numerical models, experiment results, and generalized formula for dynamic active earth pressure. We also determined the damage state and damage index based on the height of retaining wall, and developed the seismic fragility curves. The damage probabilities of the retaining wall for the S4 site were computed to be larger than those for the S2 site.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.