• 제목/요약/키워드: KOESWall System

검색결과 5건 처리시간 0.017초

분리형 보강토 옹벽의 개발 및 적용사례 (The Development and Application of KOESWall System)

  • 김영윤
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2001년도 가을 학술발표회 논문집
    • /
    • pp.323-328
    • /
    • 2001
  • In the ordinary reinforced earth wall, which was constructed by incremental construction method, the horizontal deformation of the facing due to the compaction induced horizontal earth pressure was unavoidable. Thus the KOESWall system which are adopted the isolated construction method was developed by I&S Eng. Co., Ltd. in 1999. Due to its systematical feature, KOESWall system is able to minimizes the horizontal deformation of reinforced wall effectively and it can be used as temporary structures more economically without the lacing block. In this report, it is shown that the concept and case histories of KOESWall system as a retaining structures.

  • PDF

임시구조물로서 분리형 보강토 옹벽의 적용사레 (The Application of KOESWall System as a Temporary Structure)

  • 김영윤
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 토목섬유 특별세미나
    • /
    • pp.53-58
    • /
    • 2000
  • The KOESWall system that minimizes the horizontal deformation of reinforced wall effectively was developed bt E&S Eng. Co., Ltd. in 1999. Due to its systematical feature i.e. isolated construction method. KOESWall system is able to use as temporary structures more economically without the facing block. In this report, it is shown that the case history of KOESWall as a temporary soil retaining structure and the field measuremnets.

  • PDF

분리형 보강토옹벽의 현장계측 및 분석 (Instrumented Field Performance of an Isolated-Reinforced Earth Wall)

  • 김영윤;한경제;김경모
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 가을 학술발표회 논문집
    • /
    • pp.117-124
    • /
    • 2000
  • As the reinforced earth wall is constructed with step by step backfill compaction method, the accumulative horizontal deformation is inevitable. It has been reported that about 80% of horizontal deformation is occurred during the construction stage of reinforced earth retaining wall. To reduce the horizontal deformation, an isolated-reinforced earth wall method(KOESWall system) was newly developed. In this system, the reinforced earth is constructed first with reinforcements and backfills only, and then facing blocks are installed after the horizontal displacement of reinforced earth is fully occurred. To evaluate the effect of a construction method and the performance of KOESWall system, two cases of full scale field performance was monitored during and after the construction stages.

  • PDF

보강토옹벽에 적용되는 지오텍스타일의 내후성 (The Weatherability of Non-woven Geotextiles Used in Reinforced Earth Wall)

  • 유중조;김영윤;전한용
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2001년도 봄 학술발표회 논문집
    • /
    • pp.419-424
    • /
    • 2001
  • In the KOESWall system, non-woven geotextiles are placed at the face of reinforced earth until the facing blocks are built up. And when this system is used as temporary structure, geotextiles facings are exposed to sunlight during service lifetime. During these periods, degradation of nonwoven geotextiles are occurred by UV light. So the UV-resistance of nonwoven geotextiles must be assessed correctly, in considering of the site conditions. In this study, laboratory test and the field test have been performed to evaluate the UV resistance of non-woven geotextiles used in KOESWall system and the results are expressed in terms of tensile characteristics & SEM photographs.

  • PDF

현장노출시험에 의한 부직포 지오텍스타일의 내후성 평가 (Weatherability Assessment of Nonwoven Geotextiles by Field Exposure Test)

  • 전한용;유승조;김영윤;변성원;이웅의
    • 한국지반신소재학회논문집
    • /
    • 제3권1호
    • /
    • pp.37-42
    • /
    • 2004
  • 보강토 옹벽시스템에서, 부직포 지오텍스타일은 블럭이 시공될 때 보강토체의 전면에 노출, 포설되어 있다. 임시구조물에 보강토 옹벽이 적용될 때 지오텍스타일은 시공기간 중 일광에 노출되게 된다. 이 기간 중, 자외선에 의해 부직포 지오텍스타일의 분해가 발생하게 된다. 따라서 현장시공의 관점에서 부직포 지오텍스타일의 자외선 저항성이 명확하게 평가되어야만 한다. 본 연구에서는 실험실 및 현장시험을 수행하여 KOESWall 시스템에 사용되는 부직포 지오텍스타일의 자외선 저항성이 평가되었고, 그 결과를 SEM 사진과 인장특성으로 나타내었다.

  • PDF