• Title/Summary/Keyword: KHST(Korea High Speed Train)

Search Result 40, Processing Time 0.025 seconds

The Feasibility Study of the Scenario of 400kph Maximum Speed Test in HEMU (High-speed Electric Multiple Unit) System (400km/h급 전차선로 시스템의 시범적용 구간선정 연구)

  • Ryoo, Hyang-Bok;Jang, Sa-Sool;Park, Jae-Woong;Lee, Hae-Won
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.761-767
    • /
    • 2011
  • Since the "Low Carbon, Green Growth" as a social requirements is attracted public attention, the policies and investments of the railway which have been less estimated than road is re-considered. Since the starting the commercial service (2004. April), the KTX have been operated successfully while transport passengers over 100million for years. And also the project for development of KHST (Korea High Speed Train ; G7) had been accomplished with a good result, the first trainset of KTX-II which base on G7 project was manufactured and testing now. On the other hand, the world's technology of the high speed train is more faster, and changing to a distributed traction system. To catch up the world's leading technology, the HEMU(High-speed Electric Multiple Unit) project will secure new technology and aims to promote the technology of domestic high-speed train. The authors indicates the result of detail review such as a curve, slope of the track and electrical dead section of the catenary to test at 400kph and also the performance simulation of the developed rolling stock in this paper. As the result, the authors devise the test scenario to perform a maximum speed test (stability at max. speed, acceleration & deceleration etc) with the restricted conditions such as track length, track available time etc by considering above result.

  • PDF

The Feasibility study of the scenario for 400kph maximum speed test in HEMU (High-speed Electric Multiple Unit) System (분산형 고속철도 시스템의 400kph 최고속도 시험을 위한 시운전 시나리오 고찰)

  • Kang, B.M.;Jeong, S.H.;An, H.K.;Cho, B.C.;Moon, J.S.
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.429-433
    • /
    • 2009
  • Since the "Low Carbon, Green Growth" as a social requirements is attracted public attention, the policies and investments of the railway which have been less estimated than road is re-considered. Since the starting the commercial service (2004. April), the KTX have been operated successfully while transport passengers over 100million for years. And also the project for development of KHST (Korea High Speed Train ; G7) had been accomplished with a good result, the first trainset of KTX-II which base on G7 project was manufactured and testing now. On the other hand, the world's technology of the high speed train is more faster, and changing to a distributed traction system. To catch up the world's leading technology, the HEMU(High-speed Electric Multiple Unit) project will secure new technology and aims to promote the technology of domestic high-speed train. The authors indicates the result of detail review such as a curve, slope of the track and electrical dead section of the catenary to test at 400kph and also the performance simulation of the developed rolling stock in this paper. As the result, the authors devise the test scenario to perform a maximum speed test (stability at max. speed, acceleration & deceleration etc) with the restricted conditions such as track length, track available time etc by considering above result.

  • PDF

Noise Prediction of Korea High Speed Train (KHST) and Specification of Sub-components (한국형 고속전철 차량소음 예측 및 부품 소음관리방안)

  • ;;;H.W. Thrane
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.12 no.10
    • /
    • pp.758-765
    • /
    • 2002
  • KITECH and ODS performed a study of internal and external noise prediction of the Korean high speed prototype test train(HSR 350X). The object of this study was 3 kinds of cars, trailer car(TT2), motorized car(TMI ) and power car(TPI) and the predicted noise was for the two different driving speeds in free field and tunnel conditions. Data of carbody design and noise sources were delivered from manufactures. Some of noise sources which were not available in the project team, were chosen by experiences of ODS. Internal noise level of each car was predicted for two cases i.e, at 300 km/h and 350 km/h. In addition sound transmission path and dominant noise sources were also investigated for each section of the car, which is circular shell typed part of whole carbody. In case of TT2, the dominating sound transmission path is the (floor in terms of structure-borne noise and air-borne noise. The main noise sources are structure-borne noise from the yaw-damper and air-borne noise from the wheel/rail contact, whereas the dominating sound transmission path of TMI are floor and sidewall below the window in terms of structure-borne noise. The main noise sources of TMI are structure-borne noise from motor/gear unit and the yaw-damper in the free field, and air-borne noise from the wheel/rail contact and structure-borne noise from motor/gear unit in the tunnel. Through the external noise prediction for the KHST test train formation, the noise form the wheel/rail contact is estimated as one of the major sources. In addition, the noise specification of sub-component was proposed for managing each sub-surpplier to reach the KHST noise requirement. The specification provide the sound power of machinery part and transmission loss of component of carbody structure. The predicted noise level in each case exceeded the required limit. Through this study, the noise characteristics of the test train were investigated by simulation, and then the actual test will be performed in near future. Both measured and calculated data will be compared and further work for noise reduction will be continued.

A Study on KHST Monitoring System Using Vehicle Signal (차량신호를 이용한 고속열차 모니터링 시스템)

  • Han, Young-Jae;Kim, Ki-Hwan;Park, Choon-Soo;Kim, Sang-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2007.11a
    • /
    • pp.206-207
    • /
    • 2007
  • We developed a measurement system for on-line test and evaluation of performances of KHST. The measurement system is composed of software part and hardware part. Perfect interface between multi-users is possible. A new method to measure temperature was applied to the measurement system. By using the system, fault diagnosis and performance evaluation of electric equipment in Korean High Speed Train was conducted during test running.

  • PDF

Evaluation of Static Strength and Fatigue Strength for Bogie of a Korea High Speed Train Including Eddy Current Brake System (와전류 제동장치를 포함한 한국형 고속전철 대차의 정적강도 및 피로강도 평가)

  • 노규석;이상록;강재윤
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.267-272
    • /
    • 2001
  • A FEM-based analytical approach was used to evaluate the static strength and the fatigue strength of a KHST bogie including eddy current brake system. Calculation was carried out in the fields of linearity and small deformation. The yield strengths were used as criteria for evaluating the static strength and the fatigue limits were used as criteria for evaluating the fatigue strength. The analysis results show that there is not any location that exceeds the allowable criteria.

  • PDF

Finite Element Analysis of the Gangway of a Korea High Speed Train (한국형 고속전철 관절장치의 구조해석)

  • 노규석;이상록;강재윤
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.222-229
    • /
    • 2001
  • This paper aims to verify the static strength of a KHST gangway structure including fixed ring and carrying ring according to tile load cases in the defined specification. The structure has been analyzed by the finite element method. Calculation carried out in tile fields of linearity and small deformation. The admissible limit is tile yield strength for the available materials. The analysis results show that Von-Mises stress at some locations of the structure is a little beyond the admissible limit. These results are successfully reflected on the adjusted design.

  • PDF

Noise Prediction of Korea High Speed Train (KHST) and Specification of Sub-components (한국형 고속전철 차량소음 예측 및 부품 소음관리방안)

  • ;;;H.W. Thrane
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.917-923
    • /
    • 2002
  • KITECH and ODS performed a study of internal and external noise prediction of the KHST test train. The object of this study was 3 kind of cars; trailer car(TT2), motorized car(TM1) and power car(TP1) and the predicted noise was calculated for the two different driving speeds in free field and tunnel conditions. Data of carbody design and noise sources were delivered from each manufactures. Some of noise sources which were not available in project team, were chosen by experiences of ODS. Internal noise level of each car were predicted for two cases i.e, at 300 km/h and 350 km/h. In addition sound transmission path and dominant noise sources were also investigated of each section of car, which is circular shell typed part of whole carbody. In case of TT2, the dominating sound transmission path is floor in terms or structure-borne noise and air-borne noise. The main noise sources are structure-borne noise from the yaw-damper and air-borne noise from the wheel/rail contact, whereas the dominating sound transmission path of TM1 are floor and sidewall below the window in terms of structure-borne noise. The main noise sources of TM1 are structure-borne noise from motor/gear unit and the yaw-damper in the free field, and air-borne noise from the wheel/rail contact and structure-borne noise from motor/gear unit in the tunnel. Through the external noise prediction for the KHST test train formation, the noise form the wheel/rail contact is estimated as one of the major sources. In addition, the noise specification of sub-component was proposed for managing each sub-surpplier to reach the KHST noise requirement. The specification provide the sound power of machinery part and transmission loss of component of carbody structure. The predicted noise level in each case exceeded the required limit. Through this study, the noise characteristics of the test train were investigated by simulation, and then the actual test will be performed in near future. Both measured and calculated data will be compared and further work for noise reduction will be continued.

  • PDF

A Study on the Optimum Design of Multi-Object Dynamic System for the Rail Vehicle (철도차량 동적 진동특성을 고려한 다목적함수 최적설계)

  • Park, Chan-Kyoung;Lee, Kwang-Ki;Kim, Ki-Hwan;Hyun, Seung-Ho;Park, Choon-Soo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2000.06a
    • /
    • pp.894-899
    • /
    • 2000
  • Optimization of 26 design variables selected from suspension characteristics for Korean High Speed Train (KHST) is performed according to the minimization of 58 responses which represent running safety and ride comfort for KHST and analyzed by using the each response surface model from stochastic design experiments. Sensitivity of design variables is also analyzed through the response surface model which ineffective design prameters to the performance index are screened by using stepwise regression method. The response surface models are used for optimizing design variables through simplex algorism. Values of performance index simulated by optimized design parameters are totally lower than those by initial design parameters. It shows that this method is effective for optimizing multi-design variables to multi-object function.

  • PDF

Development of Position Detection System using GPS (GPS를 이용한 위치검지시스템 개발)

  • Han, Young-Jae;Mok, Jin-Yong;Kim, Ki-Hwan;Kim, Seog-Won;Eun, Jong-Phil
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1729-1734
    • /
    • 2007
  • Recently, as the feasibility study shows that trans-Korea railway and trans-continental railway are advantageous, interest in high-speed railway system is increasing. Because railway vehicle is environment-friendly and safe compared with airplane and ship, its market-sharing increases gradually. We developed a measurement system for on-line test and evaluation of performances of KHST. The measurement system is composed of software part and hardware part. Perfect interface between multi-users is possible. Nowadays, position data inputs to pulse signal from wheel. Perfect position measurement was limited to slip and slide of vehicle. This measurement makes up for the weak points, Position Detection System using GPS develops. By using the system, Korean High Speed Train is capable of accurate fault position detection.

  • PDF

A Study on the Evaluation of Curved Track to Speed Up of Railway Vehicle (고속열차 주행시 곡선부의 궤도성능평가)

  • Kang Yun-Suk;Kim Eun;Park Ok-Jung
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.948-954
    • /
    • 2004
  • This study deals with the Evaluation of track system, when Newly developed Korea High Speed Train(KHST) by KRRI and KTX trains are running pass curved track of conventional line. In order to evaluate stability of track and vehicle running safety. the effect of curve radius, the field tests were performed at sharply curved track.

  • PDF