• Title/Summary/Keyword: K공사

Search Result 2,768, Processing Time 0.038 seconds

Analysis of the present state after establishment & amendment System reorganization of electrical standard estimation (전기부문 표준품셈의 체계개편 이후 제.개정 현황 분석)

  • Kim, H.J.;Hwang, M.S.;Kim, H.J.;Park, I.S.
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.2081-2082
    • /
    • 2008
  • 본 논문에서는 전기공사의 표준 공사원가 산정기준인 전기부문 표준품셈 체계개편이 2002-2004년까지 있었던 바, 동 체계개편 과정에서의 문제점 보완과 신규 제정 품셈에 대한 현황을 분석하고 공사원가에 미치는 영향 및 품셈 제.개정 과정에서의 문제점 등을 분석하여 합리적이고 객관적인 공사원가 산정기준을 만드는데 기여하고자 체계개편 내용과 동 내용을 적용한 2006년 이후 최근 2년간의 제 개정 현황을 비교하여 종합적으로 분석 표준품셈 제.개정의 합리적 개선방안을 제시하고자 한다.

  • PDF

OLAP and Decision Tree Analysis of Productivity Affected by Construction Duration Impact Factors (공사기간 영향요인에 따른 생산성의 OLAP 분석과 의사결정트리 분석)

  • Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.2
    • /
    • pp.100-107
    • /
    • 2011
  • As construction duration significantly influences the performance and the success of construction projects, it is necessary to appropriately manage the impact factors affecting construction duration. Recently, interest in the construction industry has been rising due to the recent change in the construction legal system, and the competition among the construction companies on construction time. However, the impact factors are extremely diverse. The existing productivity data on impact factors is not sufficient to properly identify the impact factor and measure the productivity from various perspectives, such as subcontractor, time, crew, work and so on. In this respect, a multidimensional analysis by a data warehouse is very helpful in order to view the manner in which productivity is affected by impact factors from various perspectives. Therefore, this research proposes a method that effectively takes the diverse productivity data of impact factors, and generates a multidimensional analysis. Decision tree analysis, a data mining technique, is also applied in this research in order to supply construction managers with appropriate productivity data on impact factors during the construction management process.

Development of Risk Breakdown Structure of Nuclear Power Plant Decommissioning Project: Focusing on Structural Damage / Work Process Risks (원전 차폐 콘크리트 구조물 제염해체공사 리스크 분류체계 구축: 구조적 / 작업 리스크를 중심으로)

  • Kim, Byeol;Lee, Joo-Sung;Ahn, Yong-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.3
    • /
    • pp.38-45
    • /
    • 2018
  • The purpose of this study is to deduct the structural damage / work process risks factors which can be occurred during the decommissioning in the NPP containment concrete structure. To achieve these purpose, risk profile specified in the construction industry is analyzed, and the work process of NPP decommissioning and the construction project were matched based on the similarity of each works. Accordingly, human and physical risk factors are classified. Finally, the risk associated with the building structure and work process was classified as per their process activities, and risk typology explaining the disaster which put the structure, equipments, machine and workers in serious danger was developed.

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

Analysis of Standard Cost and the Construction Period Applied TBM Excavation Method (TBM 굴착 공법 적용 구경별 표준 공사비 및 공사기간 분석 연구)

  • Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.4
    • /
    • pp.319-327
    • /
    • 2012
  • This research collected work drilling report of TBM method site developed by WRITH company to TBM equipment company in Germany and analyzed work operating productivity. Based the data analyzed TBM operating productivity, This research derived and presented excavation speed(m/day) by TBM diameter (2.6m, 3.0m, 3.5m, 5.0m, 8.0m) and rock. Also, based on the excavation speed(m/day) by TBM diameter, This research estimated a day direct construction cost and total direct construction costs by applying a direct construction cost which spent on per 1m. Based on hard rock 40.0%, soft rock 30.0%, usually rock 20%, weathered rock 10.0%, TBM boring velocity, m per cost, total construction period shall estimate the construction cost and the construction period by the effective use by diameter when future applying TBM method to the basic planning stages and in the preliminary design phase.

Study on real time monitoring to detect third party damage using vibration signal (진동신호를 이용한 타공사 조기 감시 기술 연구( I ))

  • Cho S.H.;Jeon K.S.;Park K.W.;Cho Y.B.;Li S.Y.;Kyo Y.T.
    • Journal of the Korean Institute of Gas
    • /
    • v.4 no.1 s.9
    • /
    • pp.1-8
    • /
    • 2000
  • Third party damage is one of the causes intrimiting the safety of a buried pipelines and it is very important to detect third party damage on pipelines as soon as possible. The purpose of this study is whether third-party damage can be detected by accelerometer sensor and how far the third-party damage signal can propagate. And a pilot experiment was carried out in order to find third-party damage location. As a result, the detected signal's spectum is high frequency at short distances, as the distance is far, the signals in high frequency range are attenuated and those in low frequency range remain. It was also proved that third-party damage within 5.3km distance can be detected by monitoring vibration signals.

  • PDF

Development of the Construction Post-evaluation System in Public Construction Projects (공공건설사업에서의 건설공사 사후평가시스템 구축에 관한 연구)

  • Ok, Hyun;Yang, Sung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7364-7371
    • /
    • 2014
  • Construction post-evaluation (CPE) boosts the efficiency of public construction projects by assessing the performance results of public construction projects and using the results to pursue similar projects. This evaluation comprehensively analyzes and assesses the planning of construction work, the estimated and actual construction costs, the construction period, the demand for construction projects, and the effects of construction projects after the construction work to ensure efficiency. The data was used to prevent lax project execution and enhance the quality and efficiency of similar construction projects. On the other hand, CPE results information must be managed systematically to refer to and use CPE data in similar construction projects. Therefore, in this study, the CPE system was developed as a measure of the systematic and comprehensive management and use of the CPE results information of individual ordering agencies. Therefore, the groundwork was laid for the assurance of quality enhancement and efficient project execution in public construction projects. This system is expected to serve as a useful tool for comprehensively analyzing and assessing construction works.

Removal method of Burden elements from Construction using Cloud services (클라우드 서비스를 이용한 건설현장의 부담요소 제거 방안)

  • Kim, Joon-Yong;Yoon, Myung-Seob;Park, Koo-Rack;Kim, Jin-Mook
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2014.07a
    • /
    • pp.123-125
    • /
    • 2014
  • 기존의 건설현장은 오프라인에 의한 의사 전달 또는 유.무선 전화 등을 통한 일괄적인 보고를 통해 즉각적인 상황 파악 및 의사결정이 불가능한 제약조건을 갖는다. 이로 인해서 공사기간의 연장, 공사비용 증가, 투입 인력 증대 등으로 인한 부작용이 발생하고 있다. 그러므로 건설 산업 현장에서 발생하는 다양한 예외 상황들에 대해 즉각적인 처리를 하지 못하는 현실적인 문제들을 클라우드 컴퓨팅 환경과 서비스를 이용하여 건설 현장에서 발생 가능한 예외상황에 대한 빠른 보고가 가능하도록 하고, 이를 바탕으로 의사 결정권자가 정확한 상황 판단을 통해 빠르고 경제적인 의사결정을 지원할 수 있는 처리 방법에 대해 제안하고자 한다. 제안시스템은 클라우드 서비스를 이용해 건설현장에서 빠른 의사결정이 가능하도록 함으로써 건설 현장의 정확한 상황 파악 및 효과적인 의사전달이 가능하며, 공사비 절감 및 공사 중에 발생할 수 있는 사소한 견해 차이로 인한 공사기간 낭비도 막을 수 있다.

  • PDF

A Fundamental Research on Scope Definition for Efficient Landscape Architecture Construction Project (효율적 조경공사 프로젝트 수행을 위한 과업범위설정관련 기초 연구)

  • Joo, Sang-Hyun;Lee, Jae-Keun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.36 no.3
    • /
    • pp.96-110
    • /
    • 2008
  • Differing from civil engineering and construction, landscape architecture projects are far from efforts in operation and project management. Under the circumstances, it is worthwhile to adopt scope definition from project management for construction and civil engineering in some respects. First, scope definition is able to be conducted through a simple procedure without additional investment in capital and time. Second, the output produced by scope definition is very substantial. The research scrutinized scope definition procedures accompanied by landscape architecture project execution and derived various methods in order to help scope definition for efficient landscape architecture projects. Based on the literature review, a design case study, and an exert interview, the project success elements were developed consisting of 3 sections, 8 categories and 50 elements, grounded on the theoretical base of PDRI. The elements are expected to pave a way to an adequate level of scope definition among participants of landscape architecture projects and contribute in efficient project execution.

Analysis of Standard Construction by TBM Diameter through the Rock Scenario Models in the Field (현장 암반 시나리오 모델을 통한 TBM 구경별 표준 공사기간 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.195-205
    • /
    • 2013
  • Construction Management means a comprehensive plan of given the resources and the operation of the elements to complete the construction within the construction period. The construction period of these shall be determined by calculation based on reliable initial business. However, in actual field, inaccurate task duration is determined to the intuitive judgments of representative, reference of a similar project construction period of the past. As previous studies for the improvement of existing methods, This study presented a standard model that can be utilized in the early stages of construction projects for the TBM method operating by diameter (2.6m, 3.0m, 3.5m, 5.0m, 8.0m), and This study presented and calculated construction period which can estimated quickly the entire outline the construction period Therefore, When performing TBM construction work in the future, the total construction period which presented and analyze by TBM diameter, can be used as a useful material which plan and manage construction contracts, construction estimating, construction planning to the basic planning stage, and the basic design stage.