• Title/Summary/Keyword: Item-based construction

Search Result 164, Processing Time 0.024 seconds

Improvement of CM Fee Estimation Criteria for Efficient CM Service (건설사업관리업무 효율화를 위한 대가 산출기준 개선방향)

  • Cho, Youngjun;Sung, Youngmo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.105-112
    • /
    • 2019
  • As the Construction Technology Promotion Act was revised in 2015, the term of Supervision was removed and Construction Management was included instead. The consideration of Construction Management shall be based on the cost plus fee method specified in the Criteria for the Cost of Construction Technology Services of the Ministry of Land, Infrastructure and Transport. Nevertheless, it is based on the construction cost ratio in accordance with the Economy and Finance Ministry's Detailed Guidelines for Preparing the 2018 Budget Plan and Fund Management Plan (Manual for Business Type and Item). As a result, it has been expected that Construction Management consideration will be calculated according to a single government standard and that the Criteria will be applied reasonably. In addition, although the change in the Labor Standard Act has a significant effect on the working environment of the construction site, the nature of the construction site is not considered in this Act. Based on these problems, the study suggested that the government should apply a single standard after consultation with the relevant agencies when calculating the consideration for Construction management, that the scope of the Criteria for the Cost of Construction Technology Services should be clear, that the amount of input by the Construction Manager should be considered for the capability of engineers and the number of working days, and that construction characteristics should be considered when determining the number of working days and hours.

Development of Construction Cost Model through the Analysis of Critical Work Items (코스트 중요항목 분석을 통한 공사비 예측모델 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.212-219
    • /
    • 2003
  • In construction project planning and control, a cost model performs a critical role such as cost determination on a contract stage and cost tracing. The model can maximize owner's profit and value within the project budget and optimize cost management works on overall construction implementation stages. A BoQ(Bill of Quantities) generally adopted in a unit price contract has been applied as an important tool for cost control and forecast. However a previous cost model based on the BoQ has shown limitations in that it requires too detailed information and heavy manpower on cost management and difficulty in keeping relationship with construction planning, scheduling and progress management. The each cost items and unit prices which constitute of construction works are individually very important management factors but the relative weight for each items and prices have a difference on the contents and conditions of each conditions of each construction works. In consideration of this structural mechanism of cost determination, this research is aimed at examining the critical factors affecting the construction cost determination and propose and verify a new cost forecasting model which is more simple and efficient and also keeps the accuracy of cost management.

Development of an Information System for managing the Service Performances in Public Construction Technique Fields (공공건설기술의 용역실적관리를 위한 정보시스템 개발)

  • Kim, Seong-Jin;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5993-5999
    • /
    • 2013
  • This study presents the information management item and the business process improvement plan managed all construction technique services of Design, Construction Supervision and Construction Management which is ordered and constracted by the public institution in the field of construction and business steps. In addition, it develped the Management System of Construction Technique Service Performances based on improved processes for the Public Agencies and Construction Service Director to register, review and approve the Service Performance Information. As a result, it would be help transparently managed Technical Engineer's work duplication status of Constuction Company, and checked online without having to submit Company performance data by providing objective and reliable information.

Preventive Priority Methods Based on the Analysis of Fire Accident Causes in Construction Site (건설현장 화재 발생 요인 분석에 따른 예방우선순위 연구)

  • Kim, Hee-su;Jang, Sang-chul;Joo, Jin-gyu
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.2 no.2
    • /
    • pp.50-55
    • /
    • 2019
  • Currently, safety management is becoming important at domestic construction sites. Despite the importance of safety management, accidents at construction sites are steadily increasing. Fire accidents among safety accidents cause not only negative effects on schedule delay or work plans at construction sites, but also huge casualties. Therefore, the purpose of this research is to extract the causes of fire at the construction site through the case of fire at the construction site, and to prioritize prevention through the analysis of the factors to contribute to the prevention of fire. As a research method, we select fire factors through case, conduct surveys through expert group, and analyze survey through AHP technique. The results of the AHP analysis of the survey of expert groups showed that the workers and their sub-item ranked high. Therefore, the priority for fire prevention was given, and this research is believed to help prevent fire.

Analyzing the ODA Construction Project Competence based on IPA (IPA 기반의 공적개발원조 건설사업 역량 분석)

  • Kim, Hwarang;Jung, Mincheol;Jang, Hyounseung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.5
    • /
    • pp.66-72
    • /
    • 2021
  • Participation in official development assistance (ODA) construction projects can be proposed as a way to revitalize Korean small and medium-sized construction companies' entry into the overseas construction market. To this end, the necessary competency items were derived for the execution of the project, and a survey was conducted and an analysis of importance-current competency was performed. 24 out of a total of 32 competency items were analyzed as having a low level of competency compared to their importance, indicating that it is urgent to strengthen corporate-level capabilities for the smooth execution of related projects in the future. In detail, it is judged that it is necessary to seek to establish a preferential capacity-strengthening plan for contract management-related items such as the 'Construction-related fundamental laws, Contract management method, and International administration negotiation'.

Analysis of the Relations between Design Errors Detected during BIM-based Design Validation and their Impacts Using Logistic Regression (로지스틱 회귀분석을 이용한 BIM 설계 검토에 의하여 발견된 설계 오류와 그 영향도간의 관계 분석)

  • Won, Jong-Sung;Kim, Jae-Yeo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.6
    • /
    • pp.535-544
    • /
    • 2017
  • This paper analyzes the relations between design errors, prevented by building information modeling (BIM)-based design validation, and their impacts in order to identify critical consideration factors for implementing BIM-based design validation in architecture, engineering, and construction (AEC) projects. More than 800 design errors detected by BIM-based design validation in two BIM-based projects in South Korea are categorized according to their causes (illogical error, discrepancy, and missing item) and work types (structure, architecture, and mechanical, electrical, and plumbing (MEP)). The probabilistic relations among the independent variables, including the causes and work types of design errors, and the dependent variables, including the project delays, cost overruns, low quality, and rework generation that can be caused by these errors, are analyzed using logistic regression. The characteristics of each design error are analyzed by means of face-to-face interviews with practitioners. According to the results, the impacts of design error causes in predicting the probability values of project delays, cost overruns, low quality, and rework generation were statistically meaningful.

The fashion consumer purchase patterns and influencing factors through big data - Based on sequential pattern analysis -

  • Ki Yong Kwon
    • The Research Journal of the Costume Culture
    • /
    • v.31 no.5
    • /
    • pp.607-626
    • /
    • 2023
  • This study analyzes consumer fashion purchase patterns from a big data perspective. Transaction data from 1 million transactions at two Korean fashion brands were collected. To analyze the data, R, Python, the SPADE algorithm, and network analysis were used. Various consumer purchase patterns, including overall purchase patterns, seasonal purchase patterns, and age-specific purchase patterns, were analyzed. Overall pattern analysis found that a continuous purchase pattern was formed around the brands' popular items such as t-shirts and blouses. Network analysis also showed that t-shirts and blouses were highly centralized items. This suggests that there are items that make consumers loyal to a brand rather than the cachet of the brand name itself. These results help us better understand the process of brand equity construction. Additionally, buying patterns varied by season, and more items were purchased in a single shopping trip during the spring season compared to other seasons. Consumer age also affected purchase patterns; findings showed an increase in purchasing the same item repeatedly as age increased. This likely reflects the difference in purchasing power according to age, and it suggests that the decision-making process for pur- chasing products simplifies as age increases. These findings offer insight for fashion companies' establishment of item-specific marketing strategies.

A Study on the Applicability of Character Recognition Technology for Construction Supply Chain Management of Structural Steel Components and Precast Concrete Works (철골 및 PC 공사의 물류관리를 위한 문자 인식 기술의 적용성 검토)

  • Kim, Jun-Sik;Chin, Sangyoon;Yoon, Su-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.20-29
    • /
    • 2014
  • As construction projects increase their complexity, variety, and scale, various recognition applications (such as RFID, bar-code etc.) have been tried for managing material effectively in construction projects. However, existing recognition applications for construction material management have some limitations that cause additional works (such as attaching RFID tag), additional cost (labor cost, recognition device cost, etc.), and cognitive impairment of workers. Therefore, this study proposed a character recognition technology as an alternative of previous recognition technologies such as RFID, bar-code, etc. The technical feasibility of proposed technology was validated by three recognition tests. Additionally, this study proposed code the structure to manage materials using the character recognition technology. The effects of character recognition technology are presented by comparing with existing RFID-based logistics processes.

DEVELOPMENT OF LIFE CYCLE COST ANALYSIS SYSTEM FOR THE BUILD-TRANSFER-LEASE PROJECTS

  • Chun-kyong Lee;Bong-ho Cho;Tae-keun Park
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.119-129
    • /
    • 2007
  • In January 2005, the BTL private investment project was introduced in the Korean construction market as part of the plan to provide high-quality public service and expand the required facilities in a timely manner. Nonetheless, problems such as the low earning rate at the beginning of the business, burden of service compared to the cost of the proposed business, and limitations of the local small and medium-sized companies in relation to their participation in the project arose. The LCC analysis system for the BTL projects was developed as part of efforts toward efficiently investigating the investment eligibility. Specifically, methods for LCC analysis were selected for each stage of the BTL project in relation to the requests of experts for military residential facilities and public educational facilities. Variables were then extracted to derive an accurate analysis value, LCC for the 5 cost items (initial investment cost, operating expenses, maintenance expenses, energy cost, and disposal cost), analyzed, and system enabling comparative analysis for single and multiple initiatives by year and item, developed. Thus, we have to clearly require the accumulation of data to examine the appropriateness of the results of LCC analysis based on data and results.

  • PDF

Specifying and Analyzing Formative Measurement of High-order Factor (고차 요인의 형성적 측정방법에 대한 식별 및 분석방법)

  • Yim, Myung-Seong
    • Journal of Digital Convergence
    • /
    • v.11 no.3
    • /
    • pp.101-113
    • /
    • 2013
  • Although the methodological literature is replete with advice regarding the development and validation of multi-item scales based on reflective measures, the issue of index construction using formative measures has received little attention. The aim of this paper is to enhance researchers' understanding of formative measures of high-order factor and assist them in their index construction efforts. This article is also to provide some insights into the nature of formative indicators for researchers to reach an informed choice as to the appropriate high order formative measurement model for their needs. We first provide a brief background on formative indicators, drawing from the limited and fragmented literature on the topic. Next we give an example of constructing an index based on actual survey data and highlight the procedures used to assess its quality. We conclude the article with some thoughts about the use of indexes in empirical studies.