• Title/Summary/Keyword: Item-based construction

Search Result 164, Processing Time 0.024 seconds

Analysis and Realistic Estimation of Maintenance Cost of Construction Equipment Expenses (건설기계 경비의 관리비 구성 분석 및 현실화)

  • Kim, Kyung-A;Huh, Young-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.503-508
    • /
    • 2007
  • The Equipment Expenses section of the Poom-Saem, that is used for Construction Cost Estimation on public sectors in Korea, has been rarely revised, and so does not reflect changes of construction equipment technology and construction methods, since it was established based on data from Japan and the U.S in the early 1960s. In order to make reasonable estimation of maintenance costs(Interest, Storage, Insurance, Tax), the equipment expenses section of the Poom-Saem and the domestic and overseas documentary records were investigated. Further, 16 construction sites were visited, and 20 Construction Equipment leasing services were surveyed. Based on results from analysing figures related with the estimation of maintenance costs, the maintenance cost is redefined. Then, construction equipment was classified into 6 exclusive construction equipment and general one, and realistic figures of the maintenance cost, which consists of interest, storage, insurance, tax, are suggested respectively. The optimum level of each item which consists of equipment costs was revealed based on the result of the analysis on the figures of equipment costs calculation from the Poom-Saem and the collected data. The research will be the foundation that helps to estimate appropriate construction costs and the ground work of related studies.

  • PDF

ANALYSIS AND IMPROVEMENT OF FINISHING WORK PROCESS FOR COST MANAGEMENT (FOCUSED ON INDOOR FINISHING WORK OF APARTMENT)

  • Hoon-Ku Lee;Yoon-sun Lee;Ja-Young Yoon;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.711-720
    • /
    • 2007
  • Apartment housing in the Korean domestic construction industry has had various and high-quality finishing work since the enforcement of price deregulation in 1998. Before the enforcement of price deregulation, feasibility studies of housing projects have not had particular difficulties as uniform description of finishing work items were reflected and finishing work cost also was equalized. However, the recent distinction of finishing work based on the same floor plan brings about project cost variation, along with many effects on construction management due to project cost increment. Accordingly, this paper suggests the improved plan of cost management to control the feasibility study result consistently during the life cycle of a project through an analysis based on cost management phase due to cost blackout, appearing at the commencement of a project, cost gradation caused by high-quality finishing work item, and cost reduction due to the degradation of finishing work after analysis of current apartment construction process focused on finishing work using the IDEF process analysis technique.

  • PDF

Automatic Inference of Standard BOQ(Bill of Quantities) Items using BIM and Ontology (BIM과 온톨로지를 활용한 표준내역항목 추론 자동화)

  • Lee, Seul-Ki;Kim, Ka-Ram;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.99-108
    • /
    • 2012
  • The rough design information is only available from BIM(Building Information Model) based schematic design. So, it is difficult to obtain sufficient information for generating BOQ. Like 2D design, there are some problems that the results are depend on what the choice of cost estimator. However, the most research of BIM based cost estimation are focus on quantity takeoff, the consideration of work item for generating BOQ is insufficient. Therefore, this paper present automatic inference process of work items in a BOQ using ontology. The proposed process and ontology is validated through applying tiling construction. If the proposed process is utilized, it is expected the basis of developing generation method for consistent BOQ by resolving intervention of cost estimator's arbitrary decision.

Operational Efficiency and Value Relevance of Unbilled Revenue in the Construction Company (건설기업의 경영효율성과 미청구공사의 가치관련성)

  • Kim, Young Hoon;Cho, Seokhee
    • Journal of the Korean Data Analysis Society
    • /
    • v.20 no.6
    • /
    • pp.3003-3014
    • /
    • 2018
  • This paper investigates whether the value relevance of unbilled revenue in the construction company is differentiated according to the degree of company's operational efficiency. Unbilled revenue is an item that appears in the assets of the statement of financial position based on the IFRS. It is an item that has a nature of accounts receivable, but it is calculated based on subjective judgment of management. In this paper, we hypothesized that the value relevance of unbilled revenue will be differentiated according to operational efficiency of the construction company. The results of hypothesis test are as follows. First, unbilled revenue has a significant relationship with firm's value, which is consistent with previous research results. Second, the value relevance of unbilled revenue is higher in companies with high operational efficiency. In conclusion, this paper is different from previous researches in that this paper presents not only that unbilled revenue has a value relevance but also provides evidence that it can be differentiated according to the degree of operational efficiency.

Analysis on Learning Effects of the Education Program Applying the Team-based Learning Method for Building Construction (팀 기반 학습을 이용한 건축시공 교육의 학습효과 및 만족도 분석)

  • Kim, Jae-Yeob;Won, Jongsung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.1
    • /
    • pp.101-109
    • /
    • 2017
  • This study aims to quantitatively analyze impacts of the team-based learning (TBL) method on learning of architectural engineering students. A TBL-based education program, consisted of preparation, readiness assurance, and application phases, was proposed by considering characteristics of architectural engineering education in South Korea and was applied in building construction classes. In order to measure learning effects and satisfaction levels of the proposed TBL-based education program, a set of questionnaires was conducted with students who took the building construction classes. As the results, learning effects and satisfaction levels of the TBL-based approach were higher than those of traditional approaches. Individual and team readiness assurance tests in the readiness assurance phase were the most effective and satisfactory items, while assessment in the application phase was the least effective and satisfactory item.

Construction of Tailored Learning Contents by Learner's Level using LCMS (LCMS를 이용한 학습자 수준별 맞춤형 학습 콘텐츠 구성)

  • Jeong, Hwa-Young
    • Journal of Internet Computing and Services
    • /
    • v.11 no.2
    • /
    • pp.165-172
    • /
    • 2010
  • In Web-based learning systems, the techniques, as self-regulated learning, self-directed learning, are used to improve the effect of learner's study. These techniques are methods considering learner's study level but to consider the learner's study ability properly, the tailored course for learner should be applied. In this research, the learning system considering learner's study ability was proposed. To decide a learner's study ability, IRT(Item Response Theory) was applied and learning contents and question items were developed and applied by the degree of difficulty.

A Basic Contents Item for the User Interface in the Internet Shopping Mall (인터넷쇼핑몰의 사용자 인터페이스를 위한 기본 컨텐츠 항목)

  • Moon Byung-Koo
    • Journal of Internet Computing and Services
    • /
    • v.4 no.5
    • /
    • pp.31-41
    • /
    • 2003
  • At present, the market size of electronic commerce has increased and also the construction of internet shopping mall has expended. But it raises question about issue that the manpower who develope user interface lack of the comprehensive and systematic approach. For that reason this study identified the main factor of the user interface contents in internet shopping mall and suggested the contents item based on the reliability, safety and ease of uses for the customer. Eventually, the developed basic contents items are company information, the protection policy of private information, user agreement. product information, settlement information, order process, delivery process and customer support.

  • PDF

A Decision Making Support Model of Work Item-based Adaptation Strategy for RFID-based Construction Logistics and Progress Management (RFID 기반의 건설 물류 및 진도관리 통합체계를 위한 공종별 적용전략 의사결정모델)

  • Koo, Do-Hyung;Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.3-15
    • /
    • 2009
  • As building construction projects have been more higher and bigger in scale, the needs for cost reduction, productivity improvement, and reducing of work terms have rapidly increased in recent years. There has been, accordingly, a great emphasis on the necessity of logistics and progress management by well-organized system developed based on the appliance of different management theories. Although highly developed IT technology has contributed to the efficiency and effectiveness in information research and project management, RFID has been merely applied to a single progress or a few types of materials in current management studies, not to the overall process of the projects. This research proposes a consistent and systemized approach for decision making in adopting RFID technology in a construction project to support construction logistics and progress management. With a decision making model that consists of process model and template developed in this research, risks in cost, time, and error in building RFID-based construction logistics and progress management could be minimized.

An RFID and BIM based Simulator for Construction Material Logistics and Progress Management (RFID와 BIM을 활용한 건설 자재 물류 및 진도관리 시뮬레이터 개발)

  • Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.46-54
    • /
    • 2011
  • There have been research and developments for effective and efficient logistics and progress management in a construction project. Among them, RFID+4D has been developed for the supply chain management of long-lead item materials such as steel component, precast concrete component and curtain wall by integrating RFID with 4D CAD. And the feasibility of RFID+4D has been verified and validated and the benefits in terms of time and cost were shown in several case studies. However, the previous development of RFID+4D has not been adapted widely because of additional modeling cost, non-real time data update, additional labor for data update, and so forth. Therefore, this research has proposed a framework and process for solving these problems. And the web based simulation system has been developed and verified based on the proposed framework. The proposed framework and process can improve the existing RFID+4D system in a construction project by saving its operation cost and utilizing project information more efficiently and effectively. Also it is expected that the proposed framework could be applied to a method transferring design RIM data to construction BIM data.

The Effect of the Contingent Liabilities Caused by Project Financing of the Domestic Construction Firms

  • Kang, Namhee;Kim, Hyunjung;Choi, Jaehyun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.683-684
    • /
    • 2015
  • Project Financing (PF) is the long-term financing of infrastructure and industrial projects based upon the projected cash flows of the project rather than the balance sheets of its sponsors. However, the financial institution, the subject of financing in the case of PF in Korea, the lack of validation system of business, rather than to assess the feasibility of the project, requested a credit reinforcement to the construction company, the fact is Construction Company on loans of the employer is the guarantor or debt argument commitments accordingly. As a result, PF contingent liabilities, which are indirect debt, are triggered in the construction company, not included in the financial statements, along with the disclosure standards established according to 2009 PF contingent liabilities, and major can be a management item. In this study, PF contingent liabilities is of Pearson of the index and the PF debt ratio showing the main financial ratios and risk by classifying the credit rating and contractors Ranking of construction companies in order to analyze the impact on the financial condition of the company was performed correlation analyzes, through the Pearson correlation coefficient analysis indicated quantitative or negative relationship to derive the explicit indication.

  • PDF