• Title/Summary/Keyword: Item-based construction

Search Result 164, Processing Time 0.028 seconds

Development of an Item Selection Method for Test-Construction by using a Relationship Structure among Abilities

  • Kim, Sung-Ho;Jeong, Mi-Sook;Kim, Jung-Ran
    • Communications for Statistical Applications and Methods
    • /
    • v.8 no.1
    • /
    • pp.193-207
    • /
    • 2001
  • When designing a test set, we need to consider constraints on items that are deemed important by item developers or test specialists. The constraints are essentially on the components of the test domain or abilities relevant to a given test set. And so if the test domain could be represented in a more refined form, test construction would be made in a more efficient way. We assume that relationships among task abilities are representable by a causal model and that the item response theory (IRT) is not fully available for them. In such a case we can not apply traditional item selection methods that are based on the IRT. In this paper, we use entropy as an uncertainty measure for making inferences on task abilities and developed an optimal item selection algorithm which reduces most the entropy of task abilities when items are selected from an item pool.

  • PDF

A Research for Weight Decision of Waterproofing Methods Selection Evaluation Item using the AHP (AHP기법을 이용한 방수공법 선정 평가항목의 가중치 결정에 관한 연구)

  • Choi, Sung-Min;Lim, Jong-Kwon;Oh, Sang-Keun;Seo, Chee-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.205-211
    • /
    • 2008
  • Recently, selects method of waterproofing where is suitable with method and material physical properties, construction technique, Productive technique and specifications and maintenance techniques evaluation for the same evaluation method is coming to be presented. Respects the application which select system is substantial objectively reflects a weight to evaluation item the research for is necessary. This research the evaluation which in order is effective and the decision-making to be possible about technically countermeasures for a quality security from waterproofing materials, method selection processes, clearly responsible dividing of construction and maintenance techniques. A sets weight of evaluation item for right select system, it stratify the causes which affect in priority based on AHP.

  • PDF

Analyzing the Detail Item Characteristics of Safety Management Expenses Based on the Construction Technology Promotion Act (건설기술진흥법에 따른 안전관리비 세부항목의 특성 분석)

  • Lee, Jae-Hyun;Jeong, Jae-Wook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.277-278
    • /
    • 2023
  • In 2022, construction had a five fold higher accident and fatality rate compared to the overall industry. The Construction Technology Promotion Act requires parties in construction contracts to calculate safety costs following Ministry of Land, Infrastructure and Transport guidelines. Understanding safety expense components is vital for evaluating accident prevention costs and planning anti-accident strategies. A study surveyed safety professionals to analyze the importance and influence of safety management expense components, providing basic data for future research. Survey results highlighted the significance of safety management plans, structural safety assurance, and preventing collateral damage.

  • PDF

A Proposal of Life Cycle CO2 Assessment Techniques for Building in Construction Stage by BIM LOD (건설단계 BIM을 이용한 건축물의 전 과정 CO2 평가 기법 제안에 관한 연구)

  • Bang, Jun-Sik;Tae, Sung-Ho;Roh, Seung-Jun;Keum, Won-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.53-54
    • /
    • 2012
  • This study is aimed at utilizing LCA processor with BIM LOD, eliciting the problems of the existing environmental assessment by constructing the database for environmental values of green buildings. For these objects, environmental load database of BIM construction material and evaluation process are presented, after matching BIM family based environmental load database which is available during evaluation stage, input-output tables and Korea LCI database to standard item code of public procurement service. It is a important factor in environmental assessment of building to develop database unit of standard item code for BIM and construction material. Thus, the results of this study are expected to provide basic data for improving effectiveness of construction through BIM based environmental load evaluation database. Furthermore, the provided environmental load database unit for construction material is considered to be available as basic information for BIM study by suggesting a processor connecting BIM with LCA and along with this, continuous examination on the connection process is needed.

  • PDF

Development of Buildng LCCO2 Assessment System through Data Mapping Technology. (데이터 맵핑기술을 이용한 건축물 LCCO2 평가시스템 개발)

  • Keum, Won-Seok;Tae, Sung-Ho;Roh, Seung-Jun;Bang, Jun-Sik
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.151-152
    • /
    • 2012
  • Recently, there are growing interests in building LCCO2 Assessment to reduce carbon emissions. However, existing methods of assessment system include inefficiency in the process of CO2 calculation requiring considerable data input. Therefore, the purpose of this study is to develop an efficient building assessment system appropriate to material production in construction stage. To that end, quantity input technology was limited to data mapping. Also quantity calculation based on work breakdown structure and item codes consisted of hierarchical structure that is based on facet classification were analyzed. As a result, connectivity links of quantity calculation and CO2 functional units through item codes for data mapping, and assessment system including calculation and database parts were developed.

  • PDF

Computer-Based Testing and Construction of an Item Bank Database for Medical Education in Korea (의학교육에서 컴퓨터바탕검사와 문항은행 데이터베이스 구축)

  • Huh, Sun
    • Korean Medical Education Review
    • /
    • v.16 no.1
    • /
    • pp.11-15
    • /
    • 2014
  • A number of medical schools in Korea have been using computer-based testing (CBT) for evaluating their students' scientific and/or clinical performance since the early 1990s. Introducing CBT to medical education would have several advantages: first, presenting figures and audio-video files of clinical content is simple with CBT, making it possible to evaluate medical students' competency with navigating more realistic clinical situations at minimum cost; second, CBT enables automatic item analysis and score reporting. To establish CBT, constructing an item bank with item parameters such as difficulty or discriminating parameters will be needed. To select more psychometrically sound items, analysis of the items according to item response theory is necessary. CBT has already been introduced in high stakes tests like the United States Medical Licensing Examination and the Medical Council of Canada Qualifying Examination. The National Health Personnel Examination Board in Korea is also planning to introduce a CBT-based version of the National Medical Examination soon. Thus all medical schools in Korea will need to introduce CBT and construct item banks to prepare their students for their licensing examinations and to measure the students' competency more accurately.

DEVELOPMENT OF BIM-BASED DECISION-MAKING SUPPORT SYSTEM FOR APARTMENT REMODELING

  • Dong-Gun Lee;Sik Kim;Hee-Sung Cha;Ju-Yeoun Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1117-1123
    • /
    • 2009
  • Compared with other industries, the construction Industry has many parties(A/E/C) as well as many types of construction activities. Especially, as for the remodeling project, the owner group the remodeling union consists of various stakeholders union and requiring the additional activities of demolition except for the existing new building construction project. Like this, the remodeling project has its own characteristics different from a new building construction project. As for the remodeling project, the Owner's decision making for a remodeling alternative has to be preceded, and other parties are required to propose a remodeling alternative which satisfies the Owner's requirements. However, because of time constraints, many types of problems occur during the decision-making process. In consideration of this, in this research, the authors would like to suggest a decision-making support system to help the Owner's decision-making in the early stage of a remodeling project. For this paper purpose of a remodeling decision-making framework based on Building Information Modeling(BIM) was suggested to help with the Owner's decision-making for each remodeling item and the decision-making support system was evaluated through Case Study.

  • PDF

A Fundamental Study on Data Item occurred in EPC Stage of Pipeline in Extreme Cold Weather (극한지 자원이송망 EPC단계에서 발생되는 데이터 항목에 관한 기초연구)

  • Kim, Chang-Han;Won, Seo-Kyung;Lee, Jun-Bok;Han, Choong-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.18-19
    • /
    • 2014
  • As issued the development of energy resources, EPC work process through the IT technology is essential for efficient business management, and systematic management of data generated in this process is needed. In domestic, the research related to system development for the collection and management of construction data detected in the field has been done continuously, but pipeline business target the long-distance in extreme cold weather, almost no cases have been studied up to now. Therefore, this research is aimed to derive the data item for efficient management in EPC Stage of pipeline business in extreme cold weather. WBS system of EPC work are classified easily at two levels, data items can be divided based on the type of document. In the future I will be expected to be the foundation of the systematic management of data generated in the EPC step-by-step of pipeline business.

  • PDF

How Much Discrepancy Can Happen from BIM-based Quantity Take?

  • Kim, Seong-Ah;Chin, Sangyoon
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.263-267
    • /
    • 2015
  • Stakeholders of a construction project expect cost savings through fast and accurate cost analysis by performing BIM-based quantity take-off (BQT). However, authors have observed that there can be discrepancies in the results of BQT depending on the level of development (LOD) and modeling methods. In addition, since quantity take-off methods are different depending on the construction work items, the combination of LOD, modeling methods of BIM, features of construction work items can cause serious overestimate or underestimate in BQT results. It is necessary to identify what kind of problems can happen and how those problems can be avoided in various construction work items, since the discrepancy of quantity take-off results has great impact on not only cost analysis but also the determination of contract amount and it can cause claims, poor construction quality, cost overruns, and many others later in the construction project. Therefore, this paper focuses the identification of issues and problems of BQT at each construction work item level based on two categorizations of structural works and interior works.

  • PDF

Object-Parameter Integrated Schematic Estimation Model for Predicting Office Building Interior-finishing Costs (오브젝트-파라미터 통합 오피스 마감공사비 개산견적 모델)

  • Park, Sung-Ho;Koo, Kyo-Jin;Park, Sung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.159-165
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The Object-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by object supplementary and parameter work item. This research presents the Integrated Object-Parameter Schematic Estimation Model in the design development stage that can lead to more accurately estimate the cost through analyzing historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item using regression analysis. In addition, a case study is performed for the effectiveness as comparing the proposed model with the previous estimating model.

  • PDF