• 제목/요약/키워드: Integrated cost and schedule

검색결과 84건 처리시간 0.025초

WBS-CBS통합정보의 실적수량에 의한 기성 및 진도관리에 관한 연구 (Existing and progress control research of Existing quantity the integrated information Uses WBS-CBS.)

  • 안재홍;이영도
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.261-264
    • /
    • 2009
  • Construction projects are managed by focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. This paper proposes existing and progress control research of existing quantity the integrated information uses WBS-CBS. Schedule and cost are most important in construction projects. Specially, progress and cost are relationship of the managing integrated in many construction management. The quantity of materials for the works of construction is the base to create activities and a network. The quantity of materials of materials for the elemens of a building is a base of cost estimation and resource. allocation. This study suggest method for relating the schedule and cost information through the case study of construction field engineers.

  • PDF

EPC 모듈러 프로젝트의 원가·공정 통합연계관리 지침서 개발 (Development of Integrated Cost-Schedule Management Guidelines for EPC Modular Projects)

  • 김동희;하민희;최재현
    • 한국건설관리학회논문집
    • /
    • 제21권3호
    • /
    • pp.76-84
    • /
    • 2020
  • 플랜트 산업의 대형화, 복잡화 추세에 따라 플랜트 프로젝트의 수행효율을 극대화하기 위해 모듈러 플랜트의 적용비율이 높아지고 있다. 모듈러 프로젝트의 성공적인 수행을 위해서는 사업수행 전 단계에 걸친 사업수행 전략 수립 및 이행이 필수적이다. 그러나 국내 건설업체는 플랜트 사업관리기술의 정립이나 적용이 미비한 실정으로 특히 사업관리 기술의 핵심요소로써 원가와 공정의 통합관리 방법을 정립하고 체계화 하는 것이 필수적이다. 본 연구는 모듈러 플랜트 프로젝트의 원가와 공정을 통합관리하기 위한 방법론 및 지침서 개발을 목적으로 수행되었다. 모듈러 공법의 일반적인 사항, 원가·공정관리의 업무절차에 대한 이론적 고찰을 토대로 원가관리 방법론, 공정관리 방법론을 개발하고 원가·공정을 모듈단위로 통합관리 할 수 있는 방법론과 지침서를 개발하였다. 모듈러 플랜트 프로젝트에 특화된 원가·공정 통합관리 방법론 및 지침서의 적용을 통해 프로젝트 관리의 효율성을 높일 수 있을 것으로 판단된다.

A STUDY ON BIM-BASED 5D SIMULATION IN WEB ENVIRONMENT

  • Jae-Bok Lim;Jae-Hong Ahn;Ju-Hyung Kim;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.169-172
    • /
    • 2013
  • Building Information Modeling (BIM) is an effective decision-making platform that helps to save project cost and enhance quality of construction. By generating and linking a wide variety of objects data, BIM can be effectively utilized, and it should be ensured that object properties maintain consistency throughout the project period of design, estimates, construction, maintenance and repair. This study examined how to utilize BIM data in a construction project, by linking cost and schedule data in web environment, to better utilize the information and maintain consistency of the BIM information. To do so, the model integrated WBS data and CBS data, linked them with BIM model to realize 5D simulation in web environment. As a result, cost and schedule data could be simultaneously acquired, and object properties-cost, schedule, location-as well. These are expected to contribute to developing a BIM-based automatic data-processing system in web environment.

  • PDF

대형건설공사의 프로세스 및 데이터 모델링을 통한 건설프로젝트관리체계 구축에 관한 연구 (Development of Construction Project Control System for Large Sized Construction by Process and Data Modeling)

  • 최윤기;이현수;황영삼;김영석;김우영;송영웅
    • 한국건설관리학회논문집
    • /
    • 제5권2호
    • /
    • pp.153-161
    • /
    • 2004
  • 대형 건설프로젝트의 효율적인 운용을 위해서는 프로젝트 각 분야간의 유기적인 관리체계가 필수적이라 할 수 있다. 대형 건설프로젝트의 관리업무 중 일정, 비용, 자재, 노무관리업무는 상호 유기적 종합관리를 가능하게 하는 업무들이며 이들을 종합적으로 $분석\cdot평가$할 수 있는 데이터 중심의 정보교환체계가 필수적이라 할 수 있다. 건설프로젝트관리의 $비용\cdot일정관리$업무에서 발생하는 자료의 중요성 및 활용빈도는 타 관리보다 높으며 건설공사의 효과적인 수행에 미치는 영향이 크다. $비용\cdot일정$ 통합데이터 통합관리를 통한 건설프로젝트관리체계를 수립하는 것은 생산성 측면과 자료 활용도 측면에서 더욱 효과적이라 할 수 있다. 본 논문에서는 $비용\cdot일정$ 통합 데이터베이스를 기반으로 하고 비용, 일정, 자재, 노무관리에 관련된 현장업무 분석을 통하여 대형건설공사의 프로세스 및 데이터 모델링을 통한 제반 필요정보의 분석 및 구조화를 제시하고자 한다.

물량 산출 및 생산성 분석 기반의 거푸집공사 비용공정 통합 모델 (Integration Model of Cost and Schedule in Aluminum Form Work based on Quantity Take-offs and Daily Productivity Analysis)

  • 지성민;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.17-18
    • /
    • 2011
  • Over the past 20 years, Researchers have tried to develop "Integration Model of Cost and Schedule" in construction industry. They suggested various models and techniques, however, it is still required to develop new methodology for AL Form Work in Public Multi-Housing Projects. Accordingly, this research focused on measuring quantity take-offs of on-going projects and analysing the basic process of using the resources(Labor, Material, Plant) related to cost and time data. There are 3 steps of this research : 1) The literature review of previous studies about Integration Model of Cost and Schedule was conducted. 2) Model for integration between cost and schedule was developed. 3) the accuracy of developed model was verified. The results are expected to improve in integrated managing the cost and schedule data of AL form work.

  • PDF

국방연구개발 사업에 EVMS 적응방안 연구 (A Study oil the Application of EVMS in Defense R&D Programs)

  • 최석철;김종필
    • 한국군사과학기술학회지
    • /
    • 제8권1호
    • /
    • pp.62-68
    • /
    • 2005
  • In this paper, we review the general technique of Earned Value Management System(EVMS) which is the integrated management for cost, schedule and performance, and suggest an application of the integrated management of cost and schedule in the research and development(R&D) programs for defense acquisition.

주문형 생산에서의 납기 및 원가 예측 연동에 관한 연구 (A Study on the Integrated Estimation of Delivery and Manufacturing Cost for Build-to-Order Manufacturing)

  • 김인준;강무진
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2004년도 추계학술대회 논문집
    • /
    • pp.1456-1461
    • /
    • 2004
  • Companies of Build-to-Order(BTO) strive to achieve customer responsiveness and cost efficiency simultaneously. The success of BTO depends upon the high volume production based on product plat form and delayed differentiation principle on the one hand, and upon the rapid estimation of delivery and cost for the customer orders on the other hand. Expeditious processing of a specific order requires the rearrangement of production resources and the schedule, which results in increased cost. This paper describes a cost estimation method using activity-based costing depending on the schedule change caused by urgent customer orders.

  • PDF

공정$\cdot$공사비 통합관리를 위한 Activity 및 WBS 구축 방안 -교량공사 예시 (Development of Activity and WBS for Integrated Cost and Schedule Control Process in Bridge Works)

  • 김정기;이영대;김수용;박혁;김성환
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.406-409
    • /
    • 2001
  • 최근 공사관리의 효율성을 제고하기 위하여 CM제도의 도입, EVMS기법의 도입 등이 추진되고 있으며 제도적, 효율적인 공정관리를 위해서 필수적인 공정관리의 운영실태와 공정관리 수행을 저해하는 전반적인 문제점과 개선방안을 모색, WBS를 포함한 기존의 건설분야 정보분류시스템들이 토목부분의 적용에 문제점을 갖고 있는 점을 고려하여 새로운 정보분류체계의 개발 둥에 대한 연구 둥이 이루어지고 있으며, 국내 건설환경에 적합한 EVMS에 의한 공정-공사비 통합관리 프로세스모델이나 건축공사 등에서 적용사례 분석을 중심으로 공정-비용 통합관리 실용화를 위한 통합모델 개선방안을 제시하고 있다. 본 논문에서는 공정 공사비 통합관리를 효율적으로 할 수 있도록 교량의 예시를 통하여 WBS(Work Breakdown Structure) 및 Activity를 구축하고, 공정관리 전산프로그램을 이용하여 성과분석을 수행하여 유사공사의 계획수립에 일조하고자 한다.

  • PDF

비용$\cdot$일정 통합관리를 이용한 자원소요계획에 관한 연구 (A Study on Material Requirement Planning by Integrating Schedule and Cost)

  • 송영웅;최윤기
    • 한국건설관리학회논문집
    • /
    • 제4권1호
    • /
    • pp.106-113
    • /
    • 2003
  • 건설 프로젝트의 자원관리는 공사원가의 절감, 건축물의 공정 및 품질확보에 직접적으로 관계되어 이외의 공사관리요소와 함께 매우 중요한 요소를 차지하고 있다. 하지만 자원소요계획은 공사초기에 수립되고 고려요소가 다양하여 전사적 차원의 자원소요계획을 수립하기에는 한계가 있고, 관리자간의 정보단절로 실적정보관리가 불가능하다. 건설공사의 유기적 관리를 위해서는 각 관리요소의 체계적 구성이 필요하며, 각 관리간의 사업수행정보와 실적자료의 주기적인 갱신으로 이루어져야 한다. 이에 현장변동상창을 반영하고 효과적인 자원소요계획을 수립하기 위해서는 비용 일정 통합관리의 실적 데이터를 이용하여 자원소요량 산출근거를 명확히 하고, 효율적인 자원소요계획체계를 구성하여야 한다. 본 논문에서는 비용$\cdot$일정 통합관리를 이용한 자원소요량 산출방법을 제시하였으며, 비용$\cdot$일정 통합관리를 이용한 자원 조달관리 업무프로세스를 분석하여 체계적인 자원소요계획 체계를 마련하였다.

Work Packaging Model의 개선을 통한 공정 - 공사비 통합모델 구축 (A Study on the Cost and Schedule Integration Model based on the Improvement of Work Packaging Mode)

  • 김양택;현창택
    • 한국건설관리학회논문집
    • /
    • 제1권4호
    • /
    • pp.82-90
    • /
    • 2000
  • 낙후된 국내 건설관리기술을 선진화$\cdot$합리화하기 위한 방안 중의 하나로 공정-공사비 통합관리가 많은 주목을 받고 있다. 정부에서도 공정과 공사비의 통합관리의 필요성을 인식하고 이의 도입을 적극검토하고 있다 실제로 해외공사를 통해서 양성된 국내 공정관리 전문가들의 노력으로 최근 일부 공공기관의 건설사업에서는 공정-공사비 통합관리를 부분적으로 활용하고 있는 상황이다. 그러나 그 기법 및 전산모델이 이론에 국한된 것이거나 국내의 특수한 여건을 수용하지 못하는 것이 대부분이기 때문에 활용에 많은 어려움이 있으며 국내 건설환경에 완전하게 정착되지 못하고 있다. 본 연구의 목적은 통합관리의 정착을 지연시키는 국내의 특수한 여건 및 문제점을 파악하고 이를 토대로 국내 건설현장에서 적용할 수 있도록 공정-공사비 통합모델의 개선방안을 제시하는 것이다.

  • PDF