The aim of this study is to establish resident-participative primary design of integrated rural development project with master planner by setting principals of open competition and transparent decision-making about village-to-village or business-to-business unit enterprise in Onui area, Hong-seong Gun. For effective processing, software projects such as residents education and rural landscape planning are simultaneously conducted for enhancing project understanding and comprehensive development plan including related post project. Above all, competition teams for individual project were organized to establish the resident-participative primary design using survey tables of residents demand. In 6 months resident-participative processing of primary design, continuous education and visiting to advanced area are conducted in team unit. Strengthened ability of team unit can be used in management and maintenance after project development. To do this, residents with the same opinions gathered as one competition team and identified business plans such as village asset, business location, size, program, and method for land securing. Favorable decision-making process by residents who are audience in project presentation of competition team has conducted. After selecting competition teams, continuos consulting are operated for establishing operation and management for developed or remodeled facilities through repetitive education and visiting advanced area. In this process, unit project suggested by competition team are completed. Preliminary selection was conducted by experts who were entrusted by residents. After residents agreement of project main stream such as major facilities and location, final detailed cost of projects are work out. Suggested process in this study which choose the final project by residents would improve residents' voluntary participation in integrated rural development project through open competition in establishing primary design.
The purpose of this study is to make a planning of Nosan Hasuk rural village development project based on rural amenity. The Nosan Hasuk rural village is located in Hyundo-Myun Cheongwon-Gun Chungcheongbuk-Do. For this study, investigate the amenity, make the bill of developing plan, and discuss the problems in rural integrated developing project. The developing plan is composed of basic planning, developing direction, village plans, and details projects. And, indicate the problems of rural integrated developing project those are the main body, standardization of investigated data, and insufficiency of detailed reference.
Block Grants System to the agriculture sector has been started from 2010. This paper has been studied for the effective Integrated Rural Development under Block Grants System. For this, project evaluation items and indicators (PEI) were studied by internal and external example and specialist questionnaire on project evaluation. As the result of study, necessity of project, faith of project, efficiency of project, utilization of resources and operating capability were established in planning step, and most important PEI was established the necessity of project. And in enforcement step, performance result, monitering, capability, achievement and maintenance were established, and most important PEI was established performance results. Finally, monitering, capability, achievement and maintenance were established in completion step.
In 1960's, Korea had concentrated on economic development, in the meantime the existing problem which is an avoiding rural settlement phenomenon such as a farming population decrease, an unstabel income, poor surroundings, etc. could intensify. And because of an exodus from agricultural area caused by industrialization and a fall of agricultural farm price as a result of domestic agricultural market opening in accordance with FTA, in 2004 Korean government excuted the integrated rural-village development plan as a measure to provide more support for agricultural villages. The integrated rural-village development plan means that inter-connected with villages which have potnetial and developed it as a unit of small-zone, also we can assume it a Down-up development type because residents participate and lead this plan directly. But, this plan made progress rapidly as a countmeasure of government so, it needs to evaluate for completed project area and make an improvement for a sustainable undertaking. Therefore, this study categorized project contents systematically into two parts of Hardware and Software, after that composed of 4 large-parts, 13 mid-parts and 43 small-parts from Inje-Yongdai zone which was designated for an integrated rural-village development plan in 2004. And a result of analysis for project contents priorities by hierarchy analysis method showed the Regional capability reinforcement is selected for the most important project content by 3 stakeholders who are specialists (514pts.), Korea Rural Community Corporation staffs (694pts.), local government officers (688pts.)
This study attempts to develop an interim evaluation system for the Integrated Rural Village Cluster Development Project(IRVCDP) which can secure its identity and sustainability, and induce its early settlement, and to derive plans for its steady progress. The evaluation system consists of three levels. The highest-order level is evaluation purposes, which describe IRVCDP's goals. They are expansion of income bases(EIB), improvement of living environments(ILE), strengthening of regional capabilities(SRC) and constructing effective project operation system(CEPOS). The second level is evaluation items, which each characterize the relevant evaluation purposes. The last level is evaluation indices, which observe achievement f3r evaluation purposes. 22 evaluation indices are selected to satisfy the purposes of this study through a brainstorming process and a survey on opinions of experts for those evaluation purposes and evaluation items which are derived from analyzing the IRVCDP's properties. The relative importance of the evaluation indices selected are determined through the AHP analysis. The most intriguing result from the AHP analysis is that strengthening of regional capabilities is found to be the most important one among evaluation purposes. It can be said that this result is parallel to a ultimate goal of the IRVCDP.
In this study, We developed an evaluation system for the interim check of Integrated Rural Village Development Project and analyzed its applicability to an actual evaluation process through a pilot evaluation on regions selected. The evaluation system consists of documentary assessments(30%) and field inspections(70%). The documentary assessments are quantitative assessments on check-lists reports by self-evaluation prepared by local governments. The field inspections are qualitative assessments by evaluation teams. Sixteen evaluation indices were developed for documentary assessments and seven criteria were designed for field inspections. For a pilot evaluation, one region in each province excluding Jeju Do, eight regions was selected and the field inspections due to circumstances was proceeded in two regions. The results of documentary assessments indicate that most of regions are evaluated low in project performance attributable to the delay in security for sites. In the field inspections, it appears that most of the regions evaluated high at the documentary assessments got a high point from them. They also show that coordination of action plans, rather than quantitative achievements, is a base determining success of the projects.
Although the General Agricultural Fishing Village Development Project had a significant impact on the landscape formation and management in rural area, the rural landscape planning and project sectors was not stable by fluctuation variables. On the basic understanding the institutional status of rural landscape planning, some conclusions could be discussed as follows through the analysis of quantitative and qualitative changes and the background factors. The rural landscape plan lacked its own legal and institutional foundations, and the landscape project of the General Agricultural Fishing Village Development Project was mainly focused on the environment-improving H/W project for expanding the basic living infrastructures. In order to reflect the characteristics of the region and become independent rural landscape management, it is necessary to change the contents so that the S/W business such as the deepening landscape awareness and empowerment linked with improving the physical landscape. To this end, it is necessary to establish a foundation for the rural landscape planning system to have its own status, and it seems to seek to supplement with what is included S/W contents reflecting the context of higher level landscape planning. The landscape sector of the General Agricultural Fishing Village Development Project proved to be in the process of shrinking in both quantity and quality, despite the temporary expansion in the past. In addition, considering the distortion of the contents of landscape projects in rural sites, it seems that the rural landscape-related public project are now in a position to seek a new phase change beyond quantitative expansion. In particular, along with institutional improvements to secure the independent status of rural landscape planning that contributes to village community regeneration and social sustainability through the role of intermediary support organizations in landscape management activities. Through the integrated landscape plan, which is established in advance and led by the residents in the early stages, there is a need to change the direction to enhance meaning of the landscape planning goes beyond the facility design or space improvement.
The objectives of the study are to identify the issues and problems encountered in Korea's current integrated rural regional development(IRRD) program and to suggest policy remedies to cope with them. Secondary data and materials ate mainly used for the study. Since the mid-1980s, rural settlement planning has been carried out in the Republic of Korea, In the planning process,'scale of economy'perspectives and settlement policy have been emphasized for increasing the efficiency of investment. During the 1990s, rural settlement and major village development projects have been implemented under the rural structure transformation programs. Agricultural structure adjustment projects for land consolidation and sizable farming have been separated from the rural settlement and mojor village development projects. Based on the evaluative analysis for the rural structure transformation policy and program, some problematic issues were raised as follows: (a) lack of integrative control function in the program'(b) weak linkage between living environment improvement and agricultural development projects: and (c) lack of comprehensive village development planning and implementation system. The policy issues to solve the problems were suggested as follows: (a) adoption of bottom-up approach in new IRRD planning and project system : (b) projection of comprehensive development planning and project at the village level; and (c) introduction of new regional agriculture development projects such as direct payment system for farming in less favorable areas and organic farming.
To mitigate the development gap between urban and rural area, the government has implemented project planning as the Rural Integrated Development in each Gun level since 1986. On account of shortage of the development fund, the government had changed the Gun level development into Myeon level development so called the Rural Central Settlement Zone Development. The government had started nine pilot projects throughout Korea from 1990. This study is aimed at identifing problems that found in the course of implementation of the projects and recommending the new direction of the successful implementation of the projects in the future. The problems and directions found in the cource of project implementation were as follows: 1. Project implementation by investment priority considering economic and financial rate of return should be made. 2. Objective project planning should be made. 3. Equal allocation of the limited investment fund by group interest and egoism should be prohibited. 4. Enforcement of special man power should be taken into account. 5. Unification of the diversified existing terms and conditions of loans for house construction and improvement. 6. Road development oriented budget allocation should be improved. 7. Sufficient development fund should be procured considering the present rate of sufficiency of the project cost as 36%. 8. Sufficient supply of the credit loans for improvement of living environment of the farmers should be realized. 9. Rational implementation planning in connection with farm household income source development should be made.
The paradigm of rural development projects has shifted and expanded from agricultural production based on the way of improving the residential environments in order to achieve the quality of life staying in rural areas. The purpose of this study is to evaluate policy directions of rural development projects by investigating government projects conducted successively starting from the Participatory Government of President Roh in 2003 and to the present Government of President Moon. In consideration of administrative affairs, the projects include the Balanced National Development Project, Quality of Life Improvement and Regional Development for Rural Villages Projects. The study examined changes in visions and key agendas proposed in national affairs as well as those in the visions and strategies exhibited by local development project plans through various governments. The core contents examined are the project characteristics, transformation process through government changes, and the law of status pertaining to rural development projects. The direction of implementation for the rural development projects implemented by each government provide an opportunity of understanding the transformation process in each project that has been still effective currently. This study is expected to provide a basic set of data to be used for a proposal for new rural development projects while still being useful to be referred or integrated to other national and regional projects.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.