• Title/Summary/Keyword: Integrated Rural Development Project

검색결과 39건 처리시간 0.028초

총괄계획가 시범사업에서 주민참여 기본계획 사례연구 - 홍성 오누이권역을 대상으로 - (A Case Study on Resident Participative Primary Design of Integrated Rural Development Project with Master Planner - Onui Area in Hong Seong -)

  • 정남수
    • 농촌계획
    • /
    • 제21권4호
    • /
    • pp.167-175
    • /
    • 2015
  • The aim of this study is to establish resident-participative primary design of integrated rural development project with master planner by setting principals of open competition and transparent decision-making about village-to-village or business-to-business unit enterprise in Onui area, Hong-seong Gun. For effective processing, software projects such as residents education and rural landscape planning are simultaneously conducted for enhancing project understanding and comprehensive development plan including related post project. Above all, competition teams for individual project were organized to establish the resident-participative primary design using survey tables of residents demand. In 6 months resident-participative processing of primary design, continuous education and visiting to advanced area are conducted in team unit. Strengthened ability of team unit can be used in management and maintenance after project development. To do this, residents with the same opinions gathered as one competition team and identified business plans such as village asset, business location, size, program, and method for land securing. Favorable decision-making process by residents who are audience in project presentation of competition team has conducted. After selecting competition teams, continuos consulting are operated for establishing operation and management for developed or remodeled facilities through repetitive education and visiting advanced area. In this process, unit project suggested by competition team are completed. Preliminary selection was conducted by experts who were entrusted by residents. After residents agreement of project main stream such as major facilities and location, final detailed cost of projects are work out. Suggested process in this study which choose the final project by residents would improve residents' voluntary participation in integrated rural development project through open competition in establishing primary design.

어메니티를 기반으로 한 노산하석권역 농촌마을 개발계획 (Nosan.Hasuk Rural Village Development Project Base on Amenity)

  • 윤성수;김지현;리신호;서교;김한중
    • 농촌계획
    • /
    • 제12권4호
    • /
    • pp.43-51
    • /
    • 2006
  • The purpose of this study is to make a planning of Nosan Hasuk rural village development project based on rural amenity. The Nosan Hasuk rural village is located in Hyundo-Myun Cheongwon-Gun Chungcheongbuk-Do. For this study, investigate the amenity, make the bill of developing plan, and discuss the problems in rural integrated developing project. The developing plan is composed of basic planning, developing direction, village plans, and details projects. And, indicate the problems of rural integrated developing project those are the main body, standardization of investigated data, and insufficiency of detailed reference.

포괄보조금제도하에서 효율적인 농어촌지역개발을 위한 사업평가지표 연구 (A Study on the Project Evaluation Indicators for the Efficient Integrated Rural Development in Block Grants System)

  • 이주용;김선주
    • 한국농공학회논문집
    • /
    • 제53권1호
    • /
    • pp.57-62
    • /
    • 2011
  • Block Grants System to the agriculture sector has been started from 2010. This paper has been studied for the effective Integrated Rural Development under Block Grants System. For this, project evaluation items and indicators (PEI) were studied by internal and external example and specialist questionnaire on project evaluation. As the result of study, necessity of project, faith of project, efficiency of project, utilization of resources and operating capability were established in planning step, and most important PEI was established the necessity of project. And in enforcement step, performance result, monitering, capability, achievement and maintenance were established, and most important PEI was established performance results. Finally, monitering, capability, achievement and maintenance were established in completion step.

농촌마을종합개발 항목별 중요도 분석 및 개선방안에 관한 연구 - 인제군 용대권역을 중심으로 - (Rural Village Development Itemized Study on the Importance Analysis and Improvement)

  • 안중호;이주형
    • 한국농공학회논문집
    • /
    • 제54권6호
    • /
    • pp.9-17
    • /
    • 2012
  • In 1960's, Korea had concentrated on economic development, in the meantime the existing problem which is an avoiding rural settlement phenomenon such as a farming population decrease, an unstabel income, poor surroundings, etc. could intensify. And because of an exodus from agricultural area caused by industrialization and a fall of agricultural farm price as a result of domestic agricultural market opening in accordance with FTA, in 2004 Korean government excuted the integrated rural-village development plan as a measure to provide more support for agricultural villages. The integrated rural-village development plan means that inter-connected with villages which have potnetial and developed it as a unit of small-zone, also we can assume it a Down-up development type because residents participate and lead this plan directly. But, this plan made progress rapidly as a countmeasure of government so, it needs to evaluate for completed project area and make an improvement for a sustainable undertaking. Therefore, this study categorized project contents systematically into two parts of Hardware and Software, after that composed of 4 large-parts, 13 mid-parts and 43 small-parts from Inje-Yongdai zone which was designated for an integrated rural-village development plan in 2004. And a result of analysis for project contents priorities by hierarchy analysis method showed the Regional capability reinforcement is selected for the most important project content by 3 stakeholders who are specialists (514pts.), Korea Rural Community Corporation staffs (694pts.), local government officers (688pts.)

농촌마을종합개발사업의 효율적 추진을 위한 중간평가체계 개발 (Development of An Interim Evaluation System for Integrated Rural Village Cluster Development Project)

  • 김경량;최윤상;홍성규
    • 농촌계획
    • /
    • 제12권2호
    • /
    • pp.65-73
    • /
    • 2006
  • This study attempts to develop an interim evaluation system for the Integrated Rural Village Cluster Development Project(IRVCDP) which can secure its identity and sustainability, and induce its early settlement, and to derive plans for its steady progress. The evaluation system consists of three levels. The highest-order level is evaluation purposes, which describe IRVCDP's goals. They are expansion of income bases(EIB), improvement of living environments(ILE), strengthening of regional capabilities(SRC) and constructing effective project operation system(CEPOS). The second level is evaluation items, which each characterize the relevant evaluation purposes. The last level is evaluation indices, which observe achievement f3r evaluation purposes. 22 evaluation indices are selected to satisfy the purposes of this study through a brainstorming process and a survey on opinions of experts for those evaluation purposes and evaluation items which are derived from analyzing the IRVCDP's properties. The relative importance of the evaluation indices selected are determined through the AHP analysis. The most intriguing result from the AHP analysis is that strengthening of regional capabilities is found to be the most important one among evaluation purposes. It can be said that this result is parallel to a ultimate goal of the IRVCDP.

농촌마을종합개발사업 중간 점검을 위한 평가지표 적용사례 (Development of An Evaluation System for the Interim Check of Integrated Rural Village Development Project)

  • 한경수;김기현;전택기;엄대호;최윤상
    • 농촌계획
    • /
    • 제13권2호
    • /
    • pp.121-132
    • /
    • 2007
  • In this study, We developed an evaluation system for the interim check of Integrated Rural Village Development Project and analyzed its applicability to an actual evaluation process through a pilot evaluation on regions selected. The evaluation system consists of documentary assessments(30%) and field inspections(70%). The documentary assessments are quantitative assessments on check-lists reports by self-evaluation prepared by local governments. The field inspections are qualitative assessments by evaluation teams. Sixteen evaluation indices were developed for documentary assessments and seven criteria were designed for field inspections. For a pilot evaluation, one region in each province excluding Jeju Do, eight regions was selected and the field inspections due to circumstances was proceeded in two regions. The results of documentary assessments indicate that most of regions are evaluated low in project performance attributable to the delay in security for sites. In the field inspections, it appears that most of the regions evaluated high at the documentary assessments got a high point from them. They also show that coordination of action plans, rather than quantitative achievements, is a base determining success of the projects.

일반농산어촌개발사업에 있어 농촌경관계획과 경관사업부문의 위상변화에 관한 연구 (Study on the Status Change in Rural Landscape Planning and Landscape Project in the General Agriculture Fishing Village Development Project)

  • 이수현;조동범
    • 농촌계획
    • /
    • 제25권4호
    • /
    • pp.119-128
    • /
    • 2019
  • Although the General Agricultural Fishing Village Development Project had a significant impact on the landscape formation and management in rural area, the rural landscape planning and project sectors was not stable by fluctuation variables. On the basic understanding the institutional status of rural landscape planning, some conclusions could be discussed as follows through the analysis of quantitative and qualitative changes and the background factors. The rural landscape plan lacked its own legal and institutional foundations, and the landscape project of the General Agricultural Fishing Village Development Project was mainly focused on the environment-improving H/W project for expanding the basic living infrastructures. In order to reflect the characteristics of the region and become independent rural landscape management, it is necessary to change the contents so that the S/W business such as the deepening landscape awareness and empowerment linked with improving the physical landscape. To this end, it is necessary to establish a foundation for the rural landscape planning system to have its own status, and it seems to seek to supplement with what is included S/W contents reflecting the context of higher level landscape planning. The landscape sector of the General Agricultural Fishing Village Development Project proved to be in the process of shrinking in both quantity and quality, despite the temporary expansion in the past. In addition, considering the distortion of the contents of landscape projects in rural sites, it seems that the rural landscape-related public project are now in a position to seek a new phase change beyond quantitative expansion. In particular, along with institutional improvements to secure the independent status of rural landscape planning that contributes to village community regeneration and social sustainability through the role of intermediary support organizations in landscape management activities. Through the integrated landscape plan, which is established in advance and led by the residents in the early stages, there is a need to change the direction to enhance meaning of the landscape planning goes beyond the facility design or space improvement.

농어촌지역개발의 종합적 접근을 위한 정책 과제 (Policy Issues for Integrated Approach to Rural Regional Development)

  • 임상봉
    • 농촌계획
    • /
    • 제3권2호
    • /
    • pp.90-101
    • /
    • 1997
  • The objectives of the study are to identify the issues and problems encountered in Korea's current integrated rural regional development(IRRD) program and to suggest policy remedies to cope with them. Secondary data and materials ate mainly used for the study. Since the mid-1980s, rural settlement planning has been carried out in the Republic of Korea, In the planning process,'scale of economy'perspectives and settlement policy have been emphasized for increasing the efficiency of investment. During the 1990s, rural settlement and major village development projects have been implemented under the rural structure transformation programs. Agricultural structure adjustment projects for land consolidation and sizable farming have been separated from the rural settlement and mojor village development projects. Based on the evaluative analysis for the rural structure transformation policy and program, some problematic issues were raised as follows: (a) lack of integrative control function in the program'(b) weak linkage between living environment improvement and agricultural development projects: and (c) lack of comprehensive village development planning and implementation system. The policy issues to solve the problems were suggested as follows: (a) adoption of bottom-up approach in new IRRD planning and project system : (b) projection of comprehensive development planning and project at the village level; and (c) introduction of new regional agriculture development projects such as direct payment system for farming in less favorable areas and organic farming.

  • PDF

새로운 시범(示範) 농촌(農村) 건설(建設) 방향(方向) - 농어촌정주생활권개발사업(農漁村定住生活圈開發事業)을 중심으로 - (New Direction of Pilot Rural Development -With Respect to Rural Settlement Zone Development Project-)

  • 임재환
    • 농업과학연구
    • /
    • 제22권2호
    • /
    • pp.209-222
    • /
    • 1995
  • To mitigate the development gap between urban and rural area, the government has implemented project planning as the Rural Integrated Development in each Gun level since 1986. On account of shortage of the development fund, the government had changed the Gun level development into Myeon level development so called the Rural Central Settlement Zone Development. The government had started nine pilot projects throughout Korea from 1990. This study is aimed at identifing problems that found in the course of implementation of the projects and recommending the new direction of the successful implementation of the projects in the future. The problems and directions found in the cource of project implementation were as follows: 1. Project implementation by investment priority considering economic and financial rate of return should be made. 2. Objective project planning should be made. 3. Equal allocation of the limited investment fund by group interest and egoism should be prohibited. 4. Enforcement of special man power should be taken into account. 5. Unification of the diversified existing terms and conditions of loans for house construction and improvement. 6. Road development oriented budget allocation should be improved. 7. Sufficient development fund should be procured considering the present rate of sufficiency of the project cost as 36%. 8. Sufficient supply of the credit loans for improvement of living environment of the farmers should be realized. 9. Rational implementation planning in connection with farm household income source development should be made.

  • PDF

정부별 국정운영 방향과 농촌지역개발사업 변화 분석 (How Government Policy Directions lead Rural Development Projects?)

  • 김솔희;서교;박지영;이성우;전정배
    • 농촌계획
    • /
    • 제26권1호
    • /
    • pp.123-136
    • /
    • 2020
  • The paradigm of rural development projects has shifted and expanded from agricultural production based on the way of improving the residential environments in order to achieve the quality of life staying in rural areas. The purpose of this study is to evaluate policy directions of rural development projects by investigating government projects conducted successively starting from the Participatory Government of President Roh in 2003 and to the present Government of President Moon. In consideration of administrative affairs, the projects include the Balanced National Development Project, Quality of Life Improvement and Regional Development for Rural Villages Projects. The study examined changes in visions and key agendas proposed in national affairs as well as those in the visions and strategies exhibited by local development project plans through various governments. The core contents examined are the project characteristics, transformation process through government changes, and the law of status pertaining to rural development projects. The direction of implementation for the rural development projects implemented by each government provide an opportunity of understanding the transformation process in each project that has been still effective currently. This study is expected to provide a basic set of data to be used for a proposal for new rural development projects while still being useful to be referred or integrated to other national and regional projects.