• 제목/요약/키워드: Integrated Construction

검색결과 1,685건 처리시간 0.027초

4D CAD와 IETM 연계를 통한 철도시설의 효율적인 공사정보관리 방안 (Methodologies for Effective Construction Information Management of Railway Facilities through Linking 4D CAD to IETM)

  • 강인석;문현석;박서영;김현수;안재규
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.139-142
    • /
    • 2008
  • Construction Management by using 4D CAD system analyzes operations information based on 3D and 4D objects. But it is difficult to provide a variety of documents linked by 4D objects in a lump from 4D CAD system based on visual object, and to get an optimal decision-making information to conduct business. Therefore, it is necessary to construct effective construction information management systems and to organize integrated information through linking non-objects to objects. This study suggests methodologies of effective construction management for railway facilities through building of framework for practical application and methodologies to link 4D objects to IETM documents. Accordingly, it is possible to establish a systematic decision-making for an effective construction management of railway facilities, and this provide integrated methodology for linking non-objects to objects.

  • PDF

4D CAD와 GIS의 통합시스템을 통한 프로젝트 단계별 리스크관리 모델에 관한 연구 (A Study on 4D CAD and GIS Integrated System for Process Risk Management Model)

  • 전승호;윤석헌;백준홍
    • 한국건축시공학회지
    • /
    • 제7권3호
    • /
    • pp.91-98
    • /
    • 2007
  • Recently a construction industry introduces information that brings about many advantages in the early planning phase, design phase and construction phase. Especially it replaces 2D, 3D systems(usually using explanation of drawing information) ai 4D CAD(offering a sort of 4D-having relation of construction schedule and 3D drawing information). Nevertheless a 4D has these benefits, it has limits which are not only usually using 3D modeling but also limit of making full use of practical affairs because of a lack of connecting varietals of progress of work. To solve these uppermost limits, this research is presenting unified systems to use in risk management which are efficient management of space and non-space information, space analysis, making full use of data base, introducing GIS system of easy interaction.

A STUDY ON BIM-BASED 5D SIMULATION IN WEB ENVIRONMENT

  • Jae-Bok Lim;Jae-Hong Ahn;Ju-Hyung Kim;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.169-172
    • /
    • 2013
  • Building Information Modeling (BIM) is an effective decision-making platform that helps to save project cost and enhance quality of construction. By generating and linking a wide variety of objects data, BIM can be effectively utilized, and it should be ensured that object properties maintain consistency throughout the project period of design, estimates, construction, maintenance and repair. This study examined how to utilize BIM data in a construction project, by linking cost and schedule data in web environment, to better utilize the information and maintain consistency of the BIM information. To do so, the model integrated WBS data and CBS data, linked them with BIM model to realize 5D simulation in web environment. As a result, cost and schedule data could be simultaneously acquired, and object properties-cost, schedule, location-as well. These are expected to contribute to developing a BIM-based automatic data-processing system in web environment.

  • PDF

복공판과 주형을 일체화한 가설교량에 대한 합성효과 검토 사례연구 (A Case study on Effect of Compositeness for Temporary Bridge Integrated Lining Board and Girder)

  • 윤우현;정지승;이종순;윤용석;양성돈
    • 한국안전학회지
    • /
    • 제27권2호
    • /
    • pp.34-41
    • /
    • 2012
  • In this study, it has been proposed the new type of temporary bridge which is structural performance maximization to integrated cover plate and girder as well as roll of lining board. Of all temporary bridge integrated cover plate and main girder in the form of a new type of structure is advantageous for the judge, but to the field of transport difficulties and challenges due to high altitude operations to take advantage of this challenge and deliver a structured, easy transport, and the synthesis of lining board possible was proposed. Lining board proposed in this study through experimental synthesis and analysis of the factors that influence the effectiveness of the construction and economic development in the construction method was superior, compared to the conventional lining board.

제주 지역 지표수-지하수 연계 해석 (Integrated Surface-groundwater Analysis in Jeju Island)

  • 김남원;정일문;유상연;이정우;양성기
    • 한국환경과학회지
    • /
    • 제18권9호
    • /
    • pp.1017-1026
    • /
    • 2009
  • In Jeju island, the surface runoff characteristics are quite different from those of inland. Most of streams show dried characteristics by means of large portion of recharge which goes to the deep aquifer. For this reason, the accurate estimation of hydrologic components by using watershed model like SWAT is very difficult. On the other hand, the integrated SWAT-MODFLOW model is able to simulate the complex runoff structure including stream-aquifer interaction, spatial-temporal groundwater recharge and so on. The comprehensive results of Pyoseon region in Jeju island show that the amount of groundwater discharge to stream is very small, but it might be added to the discharge into the sea. Statistical analysis shows that SWAT-MODFLOW's results represent better than SWAT's. Also, SWAT-MODFLOW produces a reasonable water budget which shows a quite similar pattern of observed one. This result proves that the integrated SWAT-MODFLOW can be used as a proper tool for hydrologic analysis of entire Jeju island.

건설 통합 설계를 위한 라이브러리 구축 방법에 관한 연구 (Study on the Method of Building Library for Integrated Design in Construction)

  • 송춘동;전영일;김활수
    • 한국디지털건축인테리어학회논문집
    • /
    • 제2권1호
    • /
    • pp.16-23
    • /
    • 2002
  • The Subject of this research is building integrated library to supported to CAAD of the A.E.C field that is oriented to the environment of integrated design. In this research, we design and implement a new library model as a solution of design-data sharing and multi-displaying that is on the rise among many problems in construction integration. We name this integrated library ACO(Actual Component Object) and using the ACO, we can share data without loss in the fields such as construction, estimation, structure. Together with this, the different expressions along each field provide the solution of sharing both graphic data and non-graphic data. This ACO is a newly conceptualized Library that is able to supply a composite structure to an architect(designer) through the internet-based ACO System. To the ACO System that supplies those ACO service, we introduce the concept of DBMS in design and design administrator, and we investigate the solutions that enable an architect to use this ACO directly on the Web.

  • PDF

경제성 환경성 통합평가를 위한 정보통합시스템 (Integrated Information System for Environmental and Economic Evaluation)

  • 김창학;신민호;강인석
    • 대한토목학회논문집
    • /
    • 제30권6D호
    • /
    • pp.615-622
    • /
    • 2010
  • 최근 국내외적으로 친환경건설을 위해 환경성 및 경제성을 고려하여 통합평가하는 것은 일반화되어 가고 있다. 본 연구의 목적은 VE/LCC와 LCA를 통합분석하기 위한 시스템을 제시하는 것이다. 의사결정자가 환경성 및 경제성을 통합평가하고 이것을 의사결정에 반영하기 위해서는 현실적으로 매우 많은 비용자료, 설계도서 및 문서들을 적절히 관리하고 통합할 수 있어야 한다. 본 연구에서는 이러한 정보의 통합수단으로 WBS를 기본으로 한 관리수단을 제시하고, DB와 효율적으로 연계하여 의사결정을 할 수 있도록 하였다. 또한 본 시스템은 VE분석, LCC분석, LCA분석을 위한 모듈을 별개로 제시하여 사용자의 편의성을 좋게 하였다.

Study on an Integrated System using an ER Diagram for Chungcheong Rural Communities

  • Jang, Hyeon Seok;Park, Hyung keun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.693-694
    • /
    • 2015
  • While urban regeneration projects are currently under active execution in several old cities in Korea, there are few projects to improve the quality of life of rural communities. Considering the decline of the SOC system, deterioration of housing, and degeneration of economic feasibility, the purpose of this study is to provide solutions to realize an improved economic and social environment of rural communities through an integrated management system for traffic safety and water management systems. Therefore, this research used an Entity-Relationship Diagram to construct an integrated system for traffic safety and water management systems for Chungcheong rural communities. The ERD is prepared by depicting 7 relationships for 13 entities, including traffic accidents and agricultural products, and 26 attributes, including soil moisture and underflow storage. Consequently, it will be possible to set up a decision-making support system that can analyze and evaluate the regeneration index, technology, and management of the systems for Chungcheong rural communities, based on supplier and user perspectives

  • PDF

건설생산성 향상을 위한 건설현장 내 RFID 네트워크 시스템 적용 방안 (Method of RFID Network System Application for Improving of Construction Productivity in Construction Site)

  • 김신구;이충희;이성형;김재현
    • 한국통신학회논문지
    • /
    • 제35권8B호
    • /
    • pp.1224-1231
    • /
    • 2010
  • 본 논문에서는 건설현장에서 건설자재 정보 관리에 적용할 수 있는 RFID 네트워크 시스템을 제안하고, 제안하는 RFID 네트워크 시스템과 건설자재 통합정보시스템의 연계 방안을 정립하였다. 또한 RFID 네트워크 시스템 적용을 위한 현장 RFID 서버 프로토 타입을 개발하여 건설현장에서 현장 시험을 수행하였다. 개발한 시스템의 현장 시험을 통해, 제안하는 RFID 네트워크 시스템이 전범위의 건설자재 정보 관리에 적용이 가능함을 증명하였다. 현장 시험 결과, 제안하는 RFID 네트워크 시스템은 기존의 건설자재 정보 관리 시스템에 비해 신속성, 정확성, 신뢰성, 나아가 건설생산성이 향상된 건설자재 정보 관리 시스템의 구축이 가능함을 확인하였다.

A FRAMEWORK FOR ACTIVITY-BASED CONSTRUCTION MANAGEMENT SIMILATION

  • Boong Yeol Ryoo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.732-737
    • /
    • 2009
  • Due to various project delivery methods and the complexity of construction projects in the construction industry, developing the framework of construction management for critical, highly complex projects in the construction industry has become problematic. Currently, a set of construction manuals play a pivotal role in planning and managing construction projects as subcontractors try to complete their scope of work according to the instructions of a general contractor. It is challenging for general contractors to write a construction management procedure manual to cover various types of project delivery methods and construction projects. In construction, the construction procedure manuals describe specific actions to be taken through the project. In reality a few contactors own such manuals and their construction schedules include more construction operation activities. Thus, it is hard to estimate the workload and productivity of construction managers because the manual and the schedule do not present the amount of management efforts required to complete a project. This paper proposes a framework to present construction management tasks according to project delivery methods which can be applied to various construction projects. Actions for management tasks were mapped and were integrated with construction activities throughout the project life cycle. The framework can then be used to give specific instructions to project participants, collect management actions, and replicate management actions throughout the project life cycle. The framework can also be can used to visualize complete construction project to analyze and manage construction management activities in each phase of a project in order to enhance productivity and efficiency. The studies of existing construction manuals were carried out to identify construction managers' responsibilities. An artificial intelligence program, CLIPS (C-Language Integrated Production System) was used to search for appropriate actions for impending tasks from a set of predefined actions to be performed for a given situation. The framework would significantly help construction managers to understand interrelations among management tasks or actions within a project. Furthermore, the framework can be embedded into Building Information Modeling (BIM) or Facility Management Systems (FMS) so that designers and constructors would execute constructability review before construction begins.

  • PDF