• 제목/요약/키워드: Integrated Construction

검색결과 1,685건 처리시간 0.026초

IDEFO Models for Construction CALS Implements (건설 CALS 구현을 위한 IDEFO 모델링 연구)

  • 권오룡;염준근
    • The Journal of Society for e-Business Studies
    • /
    • 제2권1호
    • /
    • pp.39-52
    • /
    • 1997
  • This paper presents the results of analysis for the flexible computer integrated Construction(FCIC) system to adapt CALS on the construction industry. Acquisition and supply processes of the system are represented by IDEFO function models and FCIC information systems are briefly described in this paper. The model presented here used as a reference for the development of CALS system.

  • PDF

Eco-sound barrier and dust controller for building demolition (건축물 해체공사용 친환경 방음/방진막 개발)

  • Kim, Young-Tae;Won, Ji-Min;Choi, Ha-Ran;Lee, Eun-Mee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.241-242
    • /
    • 2023
  • This paper discusses an innovative acoustic membrane developed by doAZ Co., Ltd., offering enhanced noise barrier and dust control for urban construction and demolition, surpassing the performance of traditional non-woven fabrics. The membrane is made from recyclable bubble sheets and designed to be seamlessly integrated into single and double-row scaffolding systems, ensuring broader applicability and sustainability.

  • PDF

Significant Progress in Construction Equipment of Super High-Rise Building

  • Zhang, Kun;Wang, Hui;Wang, Kaiqiang;Cui, Jian;Chen, Bo;Li, Di
    • International Journal of High-Rise Buildings
    • /
    • 제7권3호
    • /
    • pp.243-253
    • /
    • 2018
  • The construction of rapid developing super high-rise buildings constantly faces great challenges and the innovation of construction equipment is a focus of these challenges. In this paper, three new inventions including the operation platform, tower crane and hoist are put forward around two of the most important issues of super high-rise building construction: vertical transportation and operation environment. Study background, composition of the equipment, working principles and key technologies are introduced in sequence. In the end, the paper summarizes the main problems in the further development of construction equipment.

Development of Integrated Cost-Schedule Management Guidelines for EPC Modular Projects (EPC 모듈러 프로젝트의 원가·공정 통합연계관리 지침서 개발)

  • Kim, Donghee;Ha, Minhui;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • 제21권3호
    • /
    • pp.76-84
    • /
    • 2020
  • The rate of application of the modular plant in the plant industry is increasing, and for the success of the modularization projects, it is essential to develop and implement a systemized methodology across all phases of the project. However, Korean EPC firms lack project management capability when it comes to apply standardized methodology. Therefore, it is important to establish and systematize the cost/schedule integrated management method which are the two core elements of project management technology. This study was conducted to develop a methodology and guidelines for integrated management process for modular plant projects. The researchers developed a methodology for planning and managing cost and schedule, and integrated by module unit. Integrated cost and schedule methodology and guidelines developed can be used for various EPC modular plant projects to enhance the efficiency of project management.

Applicability Analysis of Photovoltaic System in the Construction Phase of High-rise Buildings (초고층 건축물 시공단계를 위한 태양광시스템의 적용성 분석)

  • Kang, Go-Une;Kim, Tae-Hoon;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.21-22
    • /
    • 2011
  • Recently, the development of alternative energy technologies has been actively conducted for energy conservation and CO2 emission reduction. Especially, photovoltaic energy has been applied practically in construction industry, and research on the building-integrated photovoltaic system (BIPV) that can replace fossil fuel for building operation and maintenance has been performed. However, this vibrant research has been limited to the use phase of buildings, and few studies have been carried out in the construction phase. The construction duration and the scale of the sites have increased along with the high-rise trend of buildings, and it is forecasted that the temporary electricity use and CO2 emission in the construction phase is increasing. In sight of these developments, this research analyzed applicability of the photovoltaic system for the construction phase that can replace the electricity used on the high-rise construction site.

  • PDF

A Study on the Plan Establishing Process Data System for the Process Plan of Construction Works (건설공사의 공정계획을 위한 공정정보 시스템 구축에 관한 연구)

  • 안효수;권춘안
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2001년도 학술논문발표회
    • /
    • pp.142-147
    • /
    • 2001
  • Recently, as the field of construction industrial is enlarged and the blanket control system is formed, the process plan considered from initial process formation to construction cost must be systematic and rational. So we have to propose and compose the new process formation system that divides the intention decisive property of construction data, its relationship and the data property according to process definitely and can express and control easily the public ownership of construction data and network process under the peculation control. So this study decides the field formation and construction data of the work according to the ordering and contract way to establish the process data system for the process plan, shows that the lot theory is necessary to form the economical construction field and proposes that the integrated formation system of construction data that is made by code system must be established.

  • PDF

OBSERVATION ERROR OF TIME-LAPSED PHOTOS IN CONSTRUCTION OPERATION MONITORING

  • Jiwon Choi;Julian Kang
    • International conference on construction engineering and project management
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1042-1047
    • /
    • 2005
  • A web-based camera (webcam) is expected to enhance construction operation monitoring. However, webcams are often installed outside a building because their mobility is limited by cable wiring, which makes it difficult to monitor construction operations inside the building. If a webcam is integrated with emerging wireless communication technologies, construction professionals may be able to monitor interior construction operations using webcams without getting network cables wired on a congested and dynamic construction job site. However, one may concern that wireless communication may not be fast enough to transport all webcam images seamlessly. This paper presents an investigation as to the observation error of webcam images when a limited amount of images are delivered.

  • PDF

Setting the New Trends for BIM in Construction: Productivity, Performance, Competitiveness, and Innovation

  • Wang, Xiangyu;Moon, Sungkon
    • International conference on construction engineering and project management
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.21-22
    • /
    • 2015
  • Productivity has been a wide-ranging challenge for the construction industry, both in Australia and globally. Particularly in Western Australia's construction and resources sectors, continuously low productivity will potentially discourage future investments. The emergence of the global marketplace necessitates that the supply chain needs to focus on the concept of the holistic efficiency. The isolated geographical position of Australia only exacerbates this phenomenon. In recent years, Building Information Modelling (BIM) has been suggested as an efficient way to help productivity improve and information management throughout supply chains. This keynote talk will focus on discussing ways of implementing BIM to enhance site productivity focusing on Western Australia's construction projects. It will show new trends of its applications to accomplish an innovative way in construction project management. The talk will also give an insightful summary of integrated methods with state-of-the-art technologies backboned by the BIM cases from construction and oil and gas industry projects.

  • PDF

Analysis of the Operation Performance of the Construction Safety System by Using Construction Accident Data (건설공사 사고 데이터(CSI) 활용을 통한 건설안전제도(안전관리계획서)의 운영성과 분석)

  • Kim, Seong-Deok;Cho, A-Yeong;Lee, Jeong-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.383-384
    • /
    • 2023
  • Using the CSI(Construction Safety Management Integrated Information) data, a comparative analysis was conducted by work type and construction cost according to whether the construction sites were subject to making a safety management plan or not. As a result, by type of work, the ratio of deaths in non-plan sites was high in mechanical facilities and earthworks, and the operation performance of the system was much higher in sites that were less than 5 billion won of construction cost.

  • PDF