A Basis Study on the Integrated System for the Evaluation and Public Announcing System of the Contractor's Construction Capacity (시공능력평가 통합시스템 기반구축에 관한 기초연구)

  • Noh, Jae-Yoon;Jun, Young-Joon;Park, Eun-Soo;Lee, Tai-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.568-571
    • /
    • 2008
  • To help a owner selecting proper contractors about the specified contract, the Evaluation and Public Announcing System of the Contractor's Construction Capacity has been introduced since 1997. But, the system has been done violence to its original meaning and purpose as time went on. When annually announcing the Contractor's Construction Capacity, especially, there was frequently a large range of opinion on the issues. On that account, MLTM(Ministry of Land, Transport and Maritime Affairs) has had to make a alteration to improve those and is making efforts for a constructive policy now. The purpose of this paper is to conduct a basis study on the Integrated System after reflecting points to be considered about improvements and the current of the times.

  • PDF

CONNECTING TECHNOLOGY, INDUSTRY AND RESEARCH: A VERTICAL INTEGRAL PROJECT COURSE FOR BIM EDUCATION OPPORTUNITIES

  • F. H. (Bud) Griffis;Mei Liu;Andrew Bates
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.252-259
    • /
    • 2013
  • Building Information Modeling (BIM) is utilizing CAD technology in a way that ultimately ties all the components of a building together as objects imbedded with information, and has been changing the way we design and build over the last 20-30 years. In Polytechnic Institute of NYU, there are four BIM courses offered which provide students with different levels of knowledge regarding BIM Technique, BIM Standards, BIM Guideline and Roadmap for Private and Public Implementation, BIM Application in Real Projects, the Cooperation of BIM and IPD for Public Works in New York City. With advanced BIM technology, BIM's integration into the construction process and its incorporation into project delivery systems, especially Integrated Project Delivery (IPD) are the bridges between technology, industry and research. This paper presents an integrated BIM curriculum with three modules: 1) BIM functions and Bid Preparation; 2) Time-Cost Trade-off Analysis; and 3) Problems Solving in BIM/IPD Environment. In this project-based curriculum developed by the common efforts of academia, public agency and industry, the objectives are: (1) to provide the information and skills needed to successfully implement BIM into the construction phase; (2) to identify BIM's role in construction and the project delivery system; (3) to develop a module in conjunction with leading BIM into project delivery system, particularly coordination between BIM and IPD; (4) to connect technology and research into industry. The course assessment was conducted and the results indicate that it is a successful reform in construction management education.

  • PDF

BIM based Construction Progress Monitoring System Integrated with IOT (사물인터넷을 활용한 BIM기반 건설 진도율 모니터링 시스템)

  • Son, Sang-Hyuk;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.130-131
    • /
    • 2015
  • Accurate construction progress measurement is an important issue for successful project delivery. This paper presents a method that keeps track of the progress measurement involved in construction operations and facilities visualization of the data using BIM and IOT. To verify the method, a residential house project was used for the case study. Test case verifies the usability and validity of the method implemented in the system.

  • PDF

A Case Study on the Mentorship Mathematics Education for the Gifted with Construction Based on the Aesthetic Experiences. - Focused on Waldorf Education - (미적 체험을 강조한 수학 영재교육 프로그램 개발 연구 - 발도르프교육의 작도교육의 활용 -)

  • Cho, Youngmi;Joung, Youn Joon
    • Journal of the Korean School Mathematics Society
    • /
    • v.16 no.3
    • /
    • pp.621-636
    • /
    • 2013
  • In this paper we intended to present the case of mentorship program for the gifted in elementary mathematics education, which is related with Waldorf education. We installed the program to four six-grade students during six months. We focused on cultivating integrated perspective, aesthetic perspective and substantial skills. For the aim we dealt with the item, construction based on the aesthetic experiences. Finally we presented three main ideas, construction of regular polygons and flowers, construction of islamic design, and farmland cleanup with construction. We also contained the students' project in this paper.

  • PDF

The Study of Project Management Information System Establishment for Construction (건설사업관리 정보시스템(PMIS)구축에 관한 연구)

  • Yoon Jae-Ho;Moon Young-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.132-138
    • /
    • 2002
  • Recently, utilization of PMIS(Project Management Information System) is in high demand as it is desired to advance the construction market through cost reduction and quality improvement within the given schedule. However, PMIS developed by individual projects are mostly evolving around construction progress status due to the temporary nature of development period and use of the system by project executers is no more than perfunctory that results in limiting the effective communication between the project owner, project manager and constructor. Therefore, the purpose of this paper is to review the PMIS developed so far, and present the direction for an effective PMIS.

Applications of bridge information modeling in bridges life cycle

  • Marzouk, Mohamed M.;Hisham, Mohamed;Al-Gahtani, Khalid
    • Smart Structures and Systems
    • /
    • v.13 no.3
    • /
    • pp.407-418
    • /
    • 2014
  • The purpose of this paper is to present an Integrated Life Cycle Bridge Information Modeling that can be used throughout different phases of the bridge life cycle including: design, construction, and operation and maintenance phases. Bridge Information Modeling (BrIM) has become an effective tool in bridge engineering and construction. It has been used in obtaining accurate shop drawings, cost estimation, and visualization. In this paper, BrIM is used as an integrated tool for bridges life cycle information modeling. In the design phase, BrIM model can be used in obtaining optimum construction methods and performing structural advanced analysis. During construction phase, the model selects the appropriate locations for mobile cranes, monitors the status of precast components, and controls documents. Whereas, it acts as a tool for bridge management system in operation and maintenance phase. The paper provides a detailed description for each use of BrIM model in design, construction, and operation and maintenance phases of bridges. It is proven that BrIM is an effective tool for bridge management systems throughout their life phases.

A BIM and UWB integrated Mobile Robot Navigation System for Indoor Position Tracking Applications

  • Park, JeeWoong;Cho, Yong K.;Martinez, Diego
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.2
    • /
    • pp.30-39
    • /
    • 2016
  • This research presents the development of a self-governing mobile robot navigation system for indoor construction applications. This self-governing robot navigation system integrated robot control units, various positioning techniques including a dead-reckoning system, a UWB platform and motion sensors, with a BIM path planner solution. Various algorithms and error correction methods have been tested for all the employed sensors and other components to improve the positioning and navigation capability of the system. The research demonstrated that the path planner utilizing a BIM model as a navigation site map could effectively extract an efficient path for the robot, and could be executed in a real-time application for construction environments. Several navigation strategies with a mobile robot were tested with various combinations of localization sensors including wheel encoders, sonar/infrared/thermal proximity sensors, motion sensors, a digital compass, and UWB. The system successfully demonstrated the ability to plan an efficient path for robot's movement and properly navigate through the planned path to reach the specified destination in a complex indoor construction site. The findings can be adopted to several potential construction or manufacturing applications such as robotic material delivery, inspection, and onsite security.

Practical Issues of Earned Value Management Systems (EVMS) for Nuclear Power Plant (NPP) Construction

  • Jung, Youngsoo;Kim, Sungrae;Moon, Byeong-Suk
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.696-697
    • /
    • 2015
  • Cost, schedule, and quality are the three major performance indicators for any construction project. Under the globalized competition in the nuclear industry, researchers and practitioners have also explored a systemized and integrated management system for cost, schedule, and quality. In order to address this issue, the concept of earned value management system (EVMS) has been often utilized. However, implementing EVMS for a mega-project of nuclear power plant (NPP) construction requires extensive overhead efforts. Though previous studies proposed structures and methods for effective NPP EVMS, there has been no legitimate study for data collection strategy for practical implementation. In this context, the purpose of this paper is to develop an effective data collection strategy for NPP EVMS. Firstly, the barriers to practical NPP EVMS were identified based on literature review and expert interviews. Strategies for data collection were then developed based on different phases of project life cycle. This study focuses on the 'life-cycle integrated progress management system' for NPP construction from an owner's perspective Therefore, results of this study can be used as a guide for preparing request for proposals (RFP) of an NPP owner organization.

  • PDF

A Study on the Data Organization of Specification Information for reference of Design Information (설계정보 참조를 위한 시방정보의 자료구조화에 관한 연구)

  • Kim Jae-hyun;Song Younk-Kyou;Kim Uk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.92-100
    • /
    • 2001
  • The architectural drawing, construction project specification, etc. are included in the contract of a documents. However, construction project specification, for being documentation, is not utilized to such an extent. The reason is that specification information is difficult in collecting information in relation to the architectural drawing, material finishing list and other architectural information. Therefore, an integrated model, which can be associated with other architectural information, is needed, and a DB based on this integrated model must be established in order for it to be utilized in design, construction, and management. The DB, which is established through this process, must be updated according to modification in design, and construction. Furthermore the specification must be in document on the web for reference. Consequently in this research, the structure of integrated model has been introduced, and it has made the search and preparation of the integrated model on the Internet, using the specification information DB established for the mutual reference of DB, possible. The improvements of construction project specification standards are expected by this system. Also, it will bring about Improvements upon claim prevention, and design, construction, management qualities. Furthermore, it will make the use of information more convenient in practical business such as order agency, design service and building site.

  • PDF

A Study on the Construction Plan of 3D Geotechnical Information for the Support of Underground Space Safety (지하안전관리 지원을 위한 3차원 지반정보 구축 방안 연구)

  • PARK, Dong-Hyun;JANG, Yong-Gu;CHOI, Hyun-Sang
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.21 no.1
    • /
    • pp.23-34
    • /
    • 2018
  • Recently, mainly in downtown, there have been frequent safety incidents in underground space like ground subsidence and land sinking. Out of diverse coping measures, the government is carrying forward the establishment of underground space integrated map. As a core element of the underground space integrated map, the 3D geotechnical information is used as major data of underground space impact assessment obliged in accordance with the "Special Act on the Safety Control of Underground Space Safety". The construction method of 3D geotechnical information is drawn when establishing the basic establishment plan of underground space integrated map, and the continuous construction is performed by the Integrated DB Center of National Geotechnical Information. However, it is necessary to draw concrete measures with accuracy, efficiency, and utilization. This study drew the construction plan considering the accuracy, utilization, and efficiency of 3D geotechnical information for the support of underground space safety. For this, accuracy between elevation and underground level is compared using MVS and MakeJiban which are software to construct boring information with geotechnical information in geotechnical information portal system. In the results of general analysis, the milepost-based construction of whole strata in a lump would be the most suitable in the aspect of accuracy, utilization, and efficiency. Based on the results of this study, Plan to construct 3D geotechnical information will be pursued.