1 |
Bocchini, P., Frangopol, D.M. and Deodatis, G. (2011), "A random field based technique for the efficiency enhancement of bridge network life-cycle analysis under uncertainty", Eng. Struct., 33(12), 3208-3217.
DOI
|
2 |
Al-Hussein, M., Alkass, S. and Moselhi, O. (2005), "Optimization algorithm for selection and on site location of mobile cranes", J. Constr. Eng. M. - ASCE, 131(5), 579-590.
DOI
ScienceOn
|
3 |
Behzadan, A.H. and Kamat, V.R. (2010), "Scalable algorithm for resolving incorrect occlusion in dynamic augmented reality engineering environments", Comput.-Aided Civ. Infrastruct. Eng., 25(1), 3-19.
DOI
|
4 |
Bocchini, P. and Frangopol, D.M. (2011), "A probabilistic computational framework for bridge network optimal maintenance scheduling", Reliab. Eng. Syst. Safe., 96(2), 332-349.
DOI
|
5 |
Bureau of Engineering (2010), Project delivery manual, version 2, eng.lacity.org/techdocs/pdmv2/chapter% 2016%20v2/Procedure16_5%20V2%20Oct06.pdf. (Accessed April 20, 2010).
|
6 |
Itoh, Y., Hammad, A., Liu, C. and Shintoku, Y. (1997), "Network-level bridge life-cycle management system", J. Infrastruct. Syst., 3(1), 31-39.
DOI
|
7 |
Hegazy, T., Elbeltagi, E. and Elbehairy. H. (2004), Bridge deck management system with integrated life cycle cost optimization, Transportation Research Record: J. Transp. Res. Board, No. 1866, TRB, National Research Council, Washington, D.C., US, 44-50.
|
8 |
Hong, T., Han, S. and Lee, S. (2007), "Simulation-based determination of optimal life-cycle cost for FRP bridge deck panels", Autom. Constr., 16(2), 140-152.
DOI
ScienceOn
|
9 |
Hudson, R.W., Carmichael, R.F., Hudson, S.W., Diaz, M.A. and Moser, L.O. (1993), "Microcomputer bridge management system", J. Transp. Eng., ASCE, 119(1), 59-76.
DOI
|
10 |
Kim, S.H. (1993), A GIS-based regional risk analysis approach for bridges against natural hazards, PhD Thesis, State University of New York at Buffalo, Buffalo, N.Y., US.
|
11 |
Marzouk, M., Hisham, M., Ismail, S., Youssef, M. and Seif, O. (2010), "On the use of building information modeling in infrastructure bridges", Proceedings of the 27th International Conference - Applications of IT in the AEC Industry (CIB W78), Cairo, Egypt, 1-10.
|
12 |
Tantisevi, K. and Akinci, B. (2007), "Automated generation of workspace requirements of mobile crane operations to support conflict detection", Automat. Constr., 16(3), 262-276.
DOI
|
13 |
Okasha, N.M. and Frangopol, D.M. (2011), "Computational platform for the integrated lifecycle management of highway bridges", Eng. Struct., 33(7), 2145-2153.
DOI
|
14 |
El Samman, B. (2010), Advanced design of steel structures, MSc. Thesis, Faculty of Engineering, Cairo University, Egypt.
|
15 |
Ng, S. and She, T.K. (1993), Towards the development of a GIS based bridge management System, Bridge Manage. 2: Inspection, Maintenance, Assessment and Repair, Volume 2, (Eds. J. E. Harding, G.A.R. Parke and M. J. Ryall), Thomas Telford, London, England.
|
16 |
Youssef, M. (2006), Intelligent selection of concrete bridge superstructure construction methods in Egypt. PhD. Thesis. Loughborough University, UK.
|
17 |
Peters, D. (2010), Bridge information modeling to cover a complete set of processes, Bentley Systems.http://ftp2.bentley.com/dist/collateral/docs/press/brim-cover-complete-set-processes_cecr.pdf. (Accessed Sept. 15, 2010).
|
18 |
Tam, C. and Leung, A. (2002), "Genetic algorithm modeling aided with 3d visualization in optimizing construction site facility layout", Proceedings of the International Council for Research and Innovation in Building and Construction, CIB W78 Conference, Aarhus, Denmark.
|