• Title/Summary/Keyword: Instrument transformer

Search Result 39, Processing Time 0.044 seconds

Development of Rogowski-Coil Type CT for Application in 170kV GIS (170kV GIS용 Rogowski coil형 CT개발)

  • Chung, Y.H.;Kim, J.B.;Song, W.P.;Kim, D.S.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.479-481
    • /
    • 2001
  • Traditionally, instrument transformer of the ferromagnetic core type have been used for measuring current in GIS(Gas Insulated Switchgear). Recently, with the introduction of digital technology at the protection relay or measurement device level, the use of new current sensor can be foreseen. Current measurement by means of Rogowski coil is just one illustration of this. This paper describes the progress of development of Rogowski-coil type CT for application in 170kV GIS.

  • PDF

Working Electrical Energy Forecasting for Peak Load Estimation of Distribution Transformer (주상변압기 최대부하 추정을 위한 수용가 사용전력량 예측)

  • Park, Chang-Ho;Cho, Seong-Soo;Kim, Jae-Cheol;Kim, Du-Bong;Yun, Sang-Yun;Lee, Dong-Jun
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.929-931
    • /
    • 1998
  • This paper describes the peak load forecasting technique of distribution transformers with correlation equation. While customers are demanding safe energy supply, conventional correlation equation that is used for load management of distribution transformers in domestic has some problems. To get accurate correlation equation, se-correlation equation were examined using new collected using the measuring instrument dev for this study. It was recognized that the qua equation was the most accurate for peak forecasting from working electrical energy.

  • PDF

Construction of 154kV Intelligent Substation for Verification Test (154kV급 실증시험용 인텔리전트 변전소 구축)

  • Chung, Y.H.;Kim, J.B.;Lee, H.S.;Choi, I.H.;Lee, D.I
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.661-662
    • /
    • 2007
  • We have carried out the construction of the 154kV intelligent substation with KEPRI. The intelligent substation is built in Gochang testing facility of KEPCO and consists of electronic instruments for GIS(gas insulated switchgear), digital control panel, remote monitoring and diagnosis system, and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are introduced compared with the instrument transformer of conventional type. Digital control panel(DCP) replaces the LCP(local control panel) which is drived for mechanical operation. For the monitoring of the condition of GIS and TR, various sensors are used. In this paper, we mention the synopsis and report the progress state of project.

  • PDF

The output characteristics of pulsed Nd:YAG laser with voltage variable capacitor-charging system (충전전압 가변방식을 이용한 펄스형 Nd:YAG 레이저의 출력특성에 관한 연구)

  • Moon, D.S.;Hong, J.H.;Song, K.Y.;Song, W.J.;Kim, K.H.;Kim, H.J.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07c
    • /
    • pp.1703-1705
    • /
    • 2001
  • The pulsed Nd:YAG laser is used widely for materials processing and medical instrument etc. It is important to control the laser energy in those fields using a pulsed Nd:YAG laser. In this paper, constant-frequency current resonant half-bridge inverter and Cockcroft-Walton circuit are used to charge the energy storage capacitor variably. This laser power supply is designed and fabricated which has no high-voltage transformer, less switching losses, compact size and capability in varying the laser output power. Also, the output characteristics of this Nd:YAG laser system are investigated. The tested results are described.

  • PDF

Adjustment of load correlation coefficient for advanced load management (부하관리 개선을 위한 부하 상관계수 산정에 관한 연구)

  • Park, Chang-Ho;Cho, Seong-Soo;Kim, Gi-Hyun;Im, Jin-Soon;Kim, Du-Bong;Kim, Jae-Chul
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1267-1269
    • /
    • 1999
  • This paper studies on arrangement of load correlation coefficient for advanced load management. To accurate load correlation coefficient, we used two real factors, electrical energy(kWh) and peak load current of pole transformers, acquired by measuring instrument. Out of several correlation equations, we find that the quadratic equation is the most accurate to express peak load current and working electrical energy. If the data is located in the outside of ${\pm}3{\sigma}$ it is discarded. For load management, we rearranged load correlation coefficient considering +2${\sigma}$ at load correlation equation. Comparing conventional load correlation coefficient with rearranged one, we can get the result of error reduced and it is adjacent to the actual data. It will be used peak load forecasting from working electrical energy and we are able to prevent from the damaging of pole transformer due to overload.

  • PDF

Effective Harmonic Diagnose Tool for Power Quality Problems (전기품질개선을 위한 효율적인 고조파 진단 툴 개발)

  • 설용태;이의용
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.3 no.1
    • /
    • pp.63-68
    • /
    • 2002
  • In this paper harmonic diagnose tool is described for electric evaluate the power quality at industrial power systems is described both simulation and experimental testing during various operation conditions. PTW (Power Tools for Windows) and harmonic measuring instrument are organized around personal computer and/or instrumentation study environments interconnected via RS-232. Unknown zero sequence impedance data of cable is calculated by the modified T&D and BICC method. IEEE standard is also used to estimate the transformer input data. the proposed system provides a flexible and effective environment to diagnose the power quality at industrial distribution systems by utilizing simulations and actual field data.

  • PDF

A Study on the Development of Harmonic Limit Device for Stabilizing Main Circuit Equipment of Train (열차운행 안정화를 위한 주회로 기기의 고조파 제한장치 개발에 관한 연구)

  • Kim, Sung Joon;Chae, Eun Kyung;Kang, Jeong Won
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.8 no.6
    • /
    • pp.853-861
    • /
    • 2018
  • This paper proposes the application of harmonic constraints to address the problems caused by abnormal voltage increases when electric railway vehicles are running. The AC line that supplies the train with power during operation is used to provide electricity of 25kV/60 Hz, but gradually the size and frequency of harmonics involved in the line are varied with the technological evolution of the railroad vehicle electrical equipment. An increase in heat losses due to the failure of the instrument transformer (PT), the main circuit device, which is a serious problem with the recent train safety operation, or to the main displacement voltage. When high frequency components are introduced through low frequency Transformers of the main circuit device, the high intensity of the components is caused by the high intensity of the core and the current flow of the parasitic core is increased, thus generating heat. To solve this problem, the recent adjustment of the sequence has applied artificial NOTCH OFF of the power converter. However, the method of receiving and controlling the OFF signal operates by interaction between the ground and the vehicle's devices, thus it is invalid in the event of failure, and an actual accident is occurring. Therefore, the harmonic currents were required to prevent possible flow of harmonics, and conducted a study to prevent accidental occurrence of train accidents and to verify feasibility of the device through the simulations of the train's experimental analysis and the simulations of the train for safe operation.

Field monitoring of splitting failure for surrounding rock masses and applications of energy dissipation model

  • Wang, Zhi-shen;Li, Yong;Zhu, Wei-shen;Xue, Yi-guo;Jiang, Bei;Sun, Yan-bo
    • Geomechanics and Engineering
    • /
    • v.12 no.4
    • /
    • pp.595-609
    • /
    • 2017
  • Due to high in-situ stress and brittleness of rock mass, the surrounding rock masses of underground caverns are prone to appear splitting failure. In this paper, a kind of loading-unloading variable elastic modulus model has been initially proposed and developed based on energy dissipation principle, and the stress state of elements has been determined by a splitting failure criterion. Then the underground caverns of Dagangshan hydropower station is analyzed using the above model. For comparing with the monitoring results, the entire process of rock splitting failure has been achieved through monitoring the splitting failure on side walls of large-scale caverns in Dagangshan via borehole TV, micro-meter and deformation resistivity instrument. It shows that the maximum depth of splitting area in the downstream sidewall of the main power house is approximately 14 m, which is close to the numerical results, about 12.5 m based on the energy dissipation model. As monitoring result, the calculation indicates that the key point displacement of caverns decreases firstly with the distance from main powerhouse downstream side wall rising, and then increases, because this area gets close to the side wall of main transformer house and another smaller splitting zone formed here. Therefore it is concluded that the energy dissipation model can preferably present deformation and fracture zones in engineering, and be very useful for similar projects.

A Study on the Analysis of Damage Cause for MOF Installed in 22.9 kV Power Receiving System (22.9 kV 수전설비 시스템에 설치된 계기용변성기의 소손원인 판정에 관한 연구)

  • Kim Hyang-Kon;Shong Kil-Mok;Kim Dong-Ook;Choi Chung-Seog
    • Fire Science and Engineering
    • /
    • v.19 no.1 s.57
    • /
    • pp.93-98
    • /
    • 2005
  • The purpose of this paper is to judge the damage cause of instrument transformer(MOF; Metering Out Fit) installed in 22.9kV power receiving system. In the three-dimensional analysis of the restored MOF, the damage pattern progressed from inside to outside, there was no damaged part in the upside. The resistance of the carbonized middle part is roughly $100\kappa\Omega$ and the exothermic temperature at inside is presumed as about $300\~800^{\circ}C$ in the result of metallurgical structure analysis. The structure and the composition rate on metal surface by SEM is similar. In the result of FT-IR analysis, we can observe the absorbtion peak at $1500cm^{-1}\;and\;1730 cm^{-1}$ is small. The high exothermic peak showed at the center part of the coil in the result of DTA.