• Title/Summary/Keyword: Installation site

Search Result 654, Processing Time 0.033 seconds

The first installation of long-distance underground transmission line with 345kV XLPE Cable in Korea (장거리 345kV XLPE 케이블 지중송전선로의 준공)

  • Shin, H.D.;Park, K.R.
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.376-378
    • /
    • 2003
  • Since the first underground transmission line of Korea was installed between Danginri and Yongsan substations in 1974, the two types of underground transmission power cables, oil-filled and XLPE, have been applied for underground transmission lines. As the manufacturing technologies of XLPE cable have been improved and the simplicity of installation and maintenance has been focused on, the installations of XLPE cables have been largely increased since the mid 1990's. For the first time, in Korea, the 345kV XLPE cable was installed between Youngseo and Youngdeungpo substations in 2003, June. So, this paper introduces the project profile, the design of cable and its accessory, the cable system design, installation and site test.

  • PDF

The first installation of underground transmission line with 345kV XLPE cable in Korea (345kV XLPE 케이블 선로의 준공)

  • Shin, H.D.;Kim, H.J.;Kim, H.J.;Park, K.R.;Song, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07c
    • /
    • pp.1815-1817
    • /
    • 2003
  • Since the first underground transmission line in Korea was installed in 1974, the two types of underground transmission power cables, oil-filled and XLPE, have been applied for underground transmission lines. As the manufacturing technologies of XLPE cable have been improved and the simplicity of installation and maintenance has been focused on, the installations of XLPE cables have been largely increased since the mid 1990's. For the first time, in Korea, the 345kV XLPE cable was installed at Pyungtaek thermal power plant in 2003, February. So, this paper introduces the project profile, the design of cable and its accessory, the cable system design, installation and site test.

  • PDF

A Comparative Assessment of Hydrogen Facility Installation for Net-Zero Energy District Planning (제로에너지단지의 적정 수소 활용 규모 및 운용방식에 관한 연구)

  • Junoh Kim;Chulhee Kim;Soyeon Chu
    • New & Renewable Energy
    • /
    • v.19 no.3
    • /
    • pp.1-12
    • /
    • 2023
  • This study aims to evaluate the optimal size of the hydrogen facility to be installed in a zero-energy district in terms of load matching and facility efficiency. A mismatch between energy generation and consumption is a common occurrence in zero-energy districts. This mismatch adversely effects the energy grid. However, using an energy carrier such as hydrogen can solve this problem. To determine the optimal size of hydrogen fuel cells to be used on-site, simulation of hydrogen installation is required at both district-and building- levels. Each case had four operating schedules. Therefore, we evaluated eight scenarios in terms of load matching, heat loss, and facility operational efficiency. The results indicate that district-level installation of hydrogen facilities enables more efficient energy use. Additionally, based on the proposed model, we can calculate the optimal size of the hydrogen facility.

A Case Study on Installation Charges Dispute Settlement by Benefits Analysis (시설부담금 산정에 관한 분쟁 사례 연구)

  • Lee, Tai-Sik;Lee, Dong-Wook;Jun, Young-Joon;Kwak, Dong-Koo
    • Journal of Arbitration Studies
    • /
    • v.20 no.1
    • /
    • pp.169-189
    • /
    • 2010
  • Composition depending on the development of industrial sites are located just within the existing facilities are hoping to become a retention, in accordance with the law will impose a liability amount. Then calculating the profit and loss analysis of the retention is required. In other words, the composition of the industrial site will be retained for existing facilities and the amount of the profit is necessary to analyze. In this study, the calculation of expenses and the income of retained existing facilities will be presented with analytical methods. Especially the existing cases of dispute with the results of the adjustment and the calculation of contributions for a range of benefits associated with the analysis according to 'The Industrial Sites and Development Act', the following conclusions were drawn. According to 'The Industrial Sites and Development Act', the facility at the industrial site composition within the limits of increasing the convenience of being charged is reasonable. In particular, the industrial site of buildings located within existing facilities depending on the composition and future industrial sites are public facilities available for the facility to consider the possibility of calculating contributions to be reasonable. Additional benefits which can be the land prices, tax exemptions, and increasing efficiency of land use for the benefits are not yet realized the benefits against the expenses side, as well as imposing double taxation. Therefore, the heavy emphasis on convenience is not considered to be reasonable. Including in the industrial site, the cost of damages caused, that is, noise, pollution, and the defective product possibility should be considered a side opinion, but it still does not promote the development of states estimated the cost of the damage is not right to be counted. Therefore, this facility should not be included in calculating contributions.

  • PDF

Optimization Models and Algorithm for the Capacitated Facility Location-Allocation Problem (용량제약이 있는 설비의 위치선정 및 수요자 할당문제에 대한 최적화 모형 및 해법)

  • Kang Sung-Yeol;Sohn Jin-Hyeon
    • Journal of Digital Contents Society
    • /
    • v.3 no.2
    • /
    • pp.221-233
    • /
    • 2002
  • In this paper, we present integer programming models and algorithms for the Capacitated Facility Location-Allocation Problem (CFLP). The models and algorithms can be used for the design of logistics networks and for the location of telecommunication facilities. We are given a set of candidate facility installation sites, one type of facility for each candidate site with its capacity and installation cost, a set of customers with their demand requirement, and flow cost for one unit of demand flow from each customer to each candidate site. (CFLP) is to determine the number of facilities for each candidate site and the set of customers which are connected to each site with minimum cost, while satisfying the demand requirement of each customer and constraints imposed on the allocation of customers to facilities. We present two integer programming models for (CFLP), and devise a branch-and-cut algorithm and a branch-and-price algorithm for the problem.

  • PDF

Two-short implant supported single molar restoration in atrophic posterior maxilla : a clinical study (위축된 상악구치부에서 두 개의 짧은 임플란트 지지형 단일치관의 임상연구)

  • Song, Ho-Yong;Heo, Yoon-Hyuk;Park, Chan-Jin;Cho, Lee-Ra
    • The Journal of the Korean dental association
    • /
    • v.53 no.9
    • /
    • pp.628-643
    • /
    • 2015
  • Purpose: The aim of this retrospective study was to compare marginal bone loss and survival rates of double short implants(multiple implant) which had been installed and restored in severely atrophic maxillary molar site without a grafting procedure. Material and Method: The subjects were patients (90 patients, 180 implants) who had been installed double short implants in severely atrophic maxillary single molar site without bone augmentation procedure from 2006 to 2014 in dental clinic in Chuncheon city. Following data were collected from dental records and radiographic panoramic views: patient's age, gender, smoking status, implant site, timing of implant installation, residual ridge height. The correlation between those factors and survival rate and marginal bone loss were analyzed. Statistical analysis was performed using Chi-square test, Student's t- test and ANOVA. Result: Eleven implants in 6 patients failed and the cumulative survival rate was 93.9%. No significant differences were found in relation to the following factors: patient's age, gender, implant site, timing of implant installation (P> .05). There were significant differences in smoking status and residual ridge height(P< .05). The average follow-up time was $45{\pm}14.7months$. The mean marginal bone loss of survived 169 implants was $0.08{\pm}0.59mm$. Conclusion: Despite the short term outcomes, the survival rate of double short implants was comparable to normal length implants. This study demonstrated that placement of double short implants without the use of bone grafting procedure for severely atrophic posterior maxilla is a simple and predictable treatment procedure.

A Study on Development of Remote Site Monitoring System in Public Road Construction Projects (공공 도로건설사업에서의 원격 현장모니터링 체계 구축에 관한 연구)

  • Ok, Hyun
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.57-65
    • /
    • 2012
  • PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.

Automatic Arrangement Algorithm for Tower Cranes Used in High-rise Apartment Buildings

  • Lim, Chae-Yeon;Kim, Sun-Kuk;Seo, Deok-Seok;Son, Ki-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.358-368
    • /
    • 2012
  • On most construction sites, the arrangement of tower cranes is decided by site engineers based on their own experience, which can cause cost overruns and delays in the lifting work. Although many researchers have conducted studies on tower crane arrangement using computer modeling and knowledge-based expert systems as well as mathematical models, no research has aimed to develop an algorithm to identify an optimum solution among several alternatives for installation areas of tower cranes satisfying the conditions of lifting work. The objective of this study is to develop an automatic arrangement algorithm for tower cranes used in high-rise apartment construction. First, as a new concept, a possible installation area of tower cranes was suggested. Second, after proposing several alternatives based on the installation points suggested in this study, an algorithm analyzing the economic feasibility of tower cranes was developed considering the rental, installation and removal costs. Third, a case study was conducted to prove the validity of the developed algorithm for selecting and installing an effective set of tower cranes at minimum cost.

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.