A Study on the Productivity Analysis of Deck Plate Installation Work in Steel Structure Construction (철골조 데크플레이트 공사의 생산성 분석에 관한 연구)

  • Jeong, Se-Lim;Cho, Kyu-Man;Hyun, Chang-Taek
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.73-79
    • /
    • 2010
  • Deck plates have been widely used for steel framework due to their merits in terms of schedule reduction and work repetition. For this reason, most of the previous studies related to deck plates have focused on the development of form type and their constructability. In this study, through an actual case study and interviews with experts, a simulation model was developed using the CYCLONE method. Based on this model, this study not only analyzed the productivity of the work process of the deck plate in steel framework, but also identified the occurrence of idle time in the work process. In addition, using a sensitivity analysis, productivity and duration could be analyzed according to variation of input resources. Based on the results, this paper suggests a way to improve the productivity of deck plate work in steel frameworks. Using the model, it is expected that project managers would be able to predict the productivity and total duration of the deck plate work in the early project phase, which will enable managers to make an appropriate plan for input resources.

Development of Mobile-Based Process and System for Pipe Management of Construction Using NFC(Near Field Communication) and Augmented Reality Technology (NFC(Near Field Communication)와 증강현실 기술을 활용한 모바일 기반 플랜트 배관공사관리 프로세스 체계 구축)

  • Moon, Daeyoon;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.122-131
    • /
    • 2014
  • As plant market grows up, client demands to increase quality, technology and to reduce construction period. Due to the vast scale of the construction site and complexity of process, plant project can have some problems of communication among the project participants, the duplication of work, errors and rework. As a result those cause more costs, delay the construction schedule and reduce productivity and quality. Therefore, real-time communication between participants and real-time sharing of information such as material, equipment and construction are required in plant project site. This research aims to propose process and develop system using NFC(Near Field Communication) technology and augmented reality technology with mobile device for plant construction site. Administrators and operators are able to work efficiently using proposed process and system which create an environment designed to share and deliver information such as material, construction information.

Ultra-Wide Band Sensor Tuning for Localization and its Application to Context-Aware Services (위치추적을 위한 UWB 센서 튜닝 및 상황인지형 서비스에의 응용)

  • Jung, Da-Un;Choo, Young-Yeol
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.12 no.6
    • /
    • pp.1120-1127
    • /
    • 2008
  • This paper presents implementation of localization system using UWB (Ultra-Wide Band) sensors and its experimental results along with development of context-aware services. In order for precise measurement of position, we experimented various conditions of pitch angles, yaw angles, number of sensors, height of tags along with measuring errors at each installation. As an application examples of the location tracking system, we developed an intelligent health training management system based on context-aware technology. The system provides appropriate training schedule to a trainee by recognizing position of the trainee and current status of gymnastic equipments and note the usage of the equipment through a personal digital assistant (PDA). Error compensation on position data and moving direction of the trainee was necessary for context-aware service. Hence, we proposed an error compensation algorithm using velocity of the trainee. Experimental results showed that proposed algorithm had made error data reduce by 30% comparing with the data without applying the algorithm.

On the Plans of Gyeongju Seokguram Grotto Restoration Project (1961-1962) by Kim Chung Up (김중업의 「경주 석굴암 보수공사 설계」(1961-1962)에 관한 고찰)

  • Woo, Don-Son;Kim, Tae-hyung
    • Journal of architectural history
    • /
    • v.30 no.4
    • /
    • pp.41-52
    • /
    • 2021
  • This study examines the Gyeongju Seokguram Grotto restoration project (1961-1962) by architect Kim Chung Up (1922-1988) and introduces the documents he wrote at the time of planning. The study highlights Kim's Plan attempt to adopt Buckminster Fuller's idea of the Geodesic Dome, while inheriting the architect Pai Ki Hyung's previous design plan which was nullified. As Seokguram Grotto's water leak and deterioration issues have been brought up, the four-times survey was carried out by experts team between 1958 and 1960, under Ministry of Education's direction. Pai designed an initial restoration plan based on the survey's result, which was a double-dome structure with a concrete film on the outer periphery as a way to protect Seokguram Grotto in January 1961. However, as drawbacks, such as the heavy load of the concrete dome, and non-installation of entrance hall, have been indicated in the review process, the Cultural Properties Committee rejected the plan. Subsequently, Kim was appointed as the supervisor of the second restoration project. Kim drew up a process management schedule to be implemented from August 1961 to December 1963 and designed the conception plans for the second restoration design. This study analyzes Kim's Plan by examining sketches, site plans, floor plans, and sections. Kim planned to maintain the idea of the double-dome structure proposed by Pai while applying Buckminster Fuller's idea of the Geodesic Dome. Kim planned to lighten the dome structure by applying a steel-frame Geodesic Dome so that the dome structure could be supported by its own. The study is expected to reclaim the omitted parts from Seokguram Grotto's historical description and Kim's careers.

Application of Big Data and Machine-learning (ML) Technology to Mitigate Contractor's Design Risks for Engineering, Procurement, and Construction (EPC) Projects

  • Choi, Seong-Jun;Choi, So-Won;Park, Min-Ji;Lee, Eul-Bum
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.823-830
    • /
    • 2022
  • The risk of project execution increases due to the enlargement and complexity of Engineering, Procurement, and Construction (EPC) plant projects. In the fourth industrial revolution era, there is an increasing need to utilize a large amount of data generated during project execution. The design is a key element for the success of the EPC plant project. Although the design cost is about 5% of the total EPC project cost, it is a critical process that affects the entire subsequent process, such as construction, installation, and operation & maintenance (O&M). This study aims to develop a system using machine-learning (ML) techniques to predict risks and support decision-making based on big data generated in an EPC project's design and construction stages. As a result, three main modules were developed: (M1) the design cost estimation module, (M2) the design error check module, and (M3) the change order forecasting module. M1 estimated design cost based on project data such as contract amount, construction period, total design cost, and man-hour (M/H). M2 and M3 are applications for predicting the severity of schedule delay and cost over-run due to design errors and change orders through unstructured text data extracted from engineering documents. A validation test was performed through a case study to verify the model applied to each module. It is expected to improve the risk response capability of EPC contractors in the design and construction stage through this study.

  • PDF

A Study on the Need of Specialized Institution for Post-Evaluation of Construction Projects (건설공사 사후평가 전문기관 설치 필요성 연구)

  • Lee, Du-Heon;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.285-295
    • /
    • 2016
  • The post-evaluation system after construction projects can evaluate estimates of use demand, project cost, and project schedule estimated in the planning phase of construction projects in public sector. Thus, it was introduced in 2000 for the purpose of reduction in future errors during similar constructions by project orderer by referring the post-evaluation results. However, many barriers to the post-evaluation system after construction projects have been reported due to evaluation systems that lack objectivity and reliability and lack of main bodies that utilize the system. Thus, this study derived implications for improvements of the post-evaluation system in Korea by benchmarking building project evaluation system and management as well as utilization systems of developed nations. Then this study conducted a survey with experts who have experienced activities in the post-evaluation committee and members of post-evaluation for public project owners. Therefore it identified the need of installation of specialized post-evaluation institutions as well as functions and work tasks to be taken by specialized institutions. Based on the analysis results, this paper provided revision drafts of related legislations and guidelines to be effective in post-evaluation. Through the study results, many trial and errors can be reduced in similar projects in the future by performing in-depth analysis on large-scale construction projects and repeatedly applied building project practices can be improved to raise technical competitiveness if the specialized institution is installed.

Analysis of BIM Utilization for On-site Construction Planning in Modular Construction Project (모듈러 건축공사의 현장시공계획수립을 위한 BIM 활용성 분석)

  • Lee, Myung-Do
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.3
    • /
    • pp.263-272
    • /
    • 2019
  • Building Information Modeling (BIM) and modular construction are regarded as important technologies that have contributed to advancements in the construction industry. However, the utilization of BIM in current modular construction projects is limited; moreover, there are no specific guidelines pertaining the applications of BIM in modular construction projects. Therefore, this study aims to analyze the utilization of BIM for onsite construction planning in modular construction projects. First, a realistic BIM application was selected through literature review and expert interviews. Then, the construction plan of the modular projects was analyzed to classify the BIM application items into five different categories. The utilization of BIM in each category was then analyzed in terms of necessity and efficiency using a questionnaire. Finally, the BIM Utilization Index (BIM UI) was suggested based on the findings of the survey. As a results, the BIM UI for module point details, lifting plan, other installation details, site layout plan, and schedule plan was 0.811, 0.787, 0.770, 0.729, and 0.699, in the descending order of usability. In addition, through the findings of the study and interviews with experts, a case study for implementation of BIM in modular construction plan was conducted. The results of this study can be used as application guidelines for BIM in future modular construction projects.

Improvement in Rice Cultural Techniques Against Unfavorable Weather Condition (기상재해와 수도재배상의 대책)

  • Ryu, I.S.;Lee, J.H.;Kwon, Y.W.
    • KOREAN JOURNAL OF CROP SCIENCE
    • /
    • v.27 no.4
    • /
    • pp.385-397
    • /
    • 1982
  • The climatic impacts have been the environmental constraints with soil characteristics to achieve self sufficiency of food production in Korea. In this paper, the distribution and appearance of impacts and the changes in climatological status due to recent trend of early transplanting of rice are widely discussed to derive some countermeasures against the impacts, being focussed on cultural A long term analysis of the climatic impact appearances of the last 74 years showed that drought, strong wind, flood, cold spell and frost were the major impacts. Before 1970's, the drought damage was the greatest among the climatic impacts; however, the expansion and improvement of irrigation and drainage system markedly decreased the damage of drought and heavy rain. The appearance of cold damage became more frequent than before due to introduction of early transplanting for more thermophilic new varieties. Tongillines which were from Indica and Japonica crosses throw more attention to cold damage for high yields to secure high temperature in heading and ripening stages and lead weakness to cold and drought damage in early growth stage after transplanting. The plants became subject to heavy rain in ripening stage also. For the countermeasures against cold damage, the rational distribution of adequate varieties according to the regional climatic conditions and planting schedule should be imposed on the cultivation. A detoured water way to increase water temperature might be suggestable in the early growth stage. Heavy application of phosphate to boost rooting and tillering also would be a nutritional control method. In the heading and ripening stages, foliar application of phosphate and additional fertilization of silicate might be considerable way of nutritional control. Since the amount of solar radiation and air temperature in dry years were high, healthy plants for high yield could be obtained; therefere, the expansion of irrigation system and development of subsurface water should be performed as one of the national development projects. To minimize the damage of strong wind and rainfall, the rational distribution of varieties with different growing periods in the area where the damage occurred habitualy should be considered with installation of wind breaks. Not only vertical windbreaks but also a horizontal wind break using a net might be a possible way to decrease the white heads in rice field by dry wind. Finally, to establish the integrated countermeasures against the climatic impacts, the detailed interpretation on the regional climatic conditions should be conducted to understand distribution and frequency of the impacts. The expansion of observation net work for agricultural meteorology and development of analysis techniques for meteorological data must be conducted in future together with the development of the new cultural techniques.

  • PDF

Optimum Management Plan for Soil Contamination Facilities (특정토양오염관리대상시설의 최적 관리방안에 관한 연구)

  • Park, Jae-Soo;Kim, Ki-Ho;Kim, Hae-Keum;Choi, Sang-Il
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.45 no.2
    • /
    • pp.293-300
    • /
    • 2012
  • This study was to investigate the unsuitable rate of the storage facilities, the changes in corrosion process over time after installation according to the status, the time to install the facilities, years elapsed after facilities installation, inspection of methods and motivation, and so on, based on the results of the inspection at the petroleum storage facilities conducted by domestic soil-relate specialized agency to derive optimal management plans which meet the status of soil contamination facilities. The results showed that the facilities more than 5 years after the initial leak test at the time of the installation need to be inspected periodically by considering costs of leak test and remediation of polluted soil. The inspection period can be decided by cost and leak test methods showing discrepancies for the results obtained from individual test whether it was direct or indirect. To compensate these matters, we suggested that the direct inspection method on regular schedule is recommended. On the other hand, the inspection can be voluntarily completed to ease burden of the results by inspection or equivalent level to this inspection method. Also, it may need improved construction supervision and performance test system to minimize the occurrence of the nature defects in installing the facilities as well as the upgrade program for the facilities during intervals of inspection period.

Analysis of Local Government Environmental Impact Assessment (EIA) Ordinances and Preparation of Consultation Guidelinesfor EIA - A Case of Incheon Metropolitan City - (지방자치단체 환경영향평가 조례 현황 분석과 협의 지침서 작성 방안 - 인천광역시 사례를 중심으로 -)

  • Lee, Jongook;Cho, Kyeong Doo
    • Journal of Environmental Impact Assessment
    • /
    • v.31 no.4
    • /
    • pp.226-240
    • /
    • 2022
  • Local governments over a certain size in Republic of Korea may conduct Environmental Impact Assessment (EIA) considering regional characteristics if it is necessary, in accordance with Article 42 of the 「Environmental Impact Assessment Act」. However, it was investigated that the number of local government EIA operation in many local governments was less than initial expectations. In order to improve it, the status of ordinances and consultation guidelines which are different for each local government need to be compared, and the institutional issues forthe relevant local governments must be found considering regional characteristics. Furthermore, detailed regulation and guidance on the local government EIA procedure should be included in the consultation guidelines and related information need to be provided. In this study, focusing on the case of Incheon Metropolitan City, the status of local government EIA ordinances in metropolitan cities and provinces with a similar condition was investigated, and the types and scope of target projects were compared and analyzed. In addition, consultation guidelines forIncheon Metropolitan City were written, and improvements on the procedure flow and overall schedule designation derived from the process were presented. In the case of Incheon Metropolitan City, there were no detailed information officially announced regarding the regulations of the local government EIA ordinance and follow-up management, so the administrative system of the local government needed to be reinforced in this field. Meanwhile, considering the status of local environment and geography, some target project types were deemed necessary to be added: port construction projects, water resource development projects, railroad construction projects, and military facilities installation projects. The results of this study will provide useful information to local governments which want to improve their operation effectiveness by reorganizing the local government EIA system and preparing specific guidelines.