1 |
Andras M. The lure of modular construction-assessing the advantages and risks [Internet]. Virginia: IPA Newsletter; 2015 Nov. Available from: https://www.ipaglobal.com/news/article/the-lure-of-modular-construction-assessing-the-advantages-and-risks/
|
2 |
Abanda FH, Tah JHM, Cheung, FKT. BIM in off-site manufacturing for buildings. Journal of Building Engineering. 2017 Oct;14:89-102. https://doi.org/10.1016/j.jobe.2017.10.002
DOI
|
3 |
Choi OK, Lee HS, Park MS, Hyun HS. Quantity management model for manufacturing and assembly of lagre-scale modular construction projects during construction phase. Korean Journal of Construction Engineering and Management. 2018 Jan;19(1):43-53. https://doi.org/10.6106/KJCEM.2018.19.1.043
DOI
|
4 |
Shin HK, Kim SY, Ahn YH. Giel B. Decision model of construction errors management based on modular method construction process. Korean Journal of Construction Engineering and Management. 2017 Nov;18(6):98-108. https://doi.org/10.6106/KJCEM.2017.18.6.098
DOI
|
5 |
Shin HK, Ahn YH. Modular building construction process development by benchmarking international best practices. Korean Journal of Construction Engineering and Management. 2016 Nov;17(6):3-12. https://doi.org/10.6106/KJCEM.2016.17.6.003
DOI
|
6 |
Kim JH, Park MS, Lee HS, Hyun HS. Alternative evaluation model for tower crane operation plan in modular construction-focusing on modular unit installation and finishing works. Korean Journal of Construction Engineering and Management. 2018 Mar;19(2):50-60. https://doi.org/10.6106/KJCEM.2018.19.2.050
DOI
|
7 |
Lee DW, Hyun HS, Park MS, Lee HS. Tower crane location and capacity selection model for the mid-to-high-rise modular construction. Journal of the Architectural Institute of Korea Structure and Construction. 2016 Nov;32(11):27-36. https://doi.org/10.5659/JAIK_SC.2016.32.11.27
DOI
|
8 |
Han SH, Hasan S, Bouferguène A, Al-Hussein M, Kosa J. Utilization of 3D visualization of mobile crane operations for modular construction on-site assembly. Journal of Management in Engineering. 2015 Sep;31(5):04014080. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000317
DOI
|
9 |
Lee YH, Lee DH, Kim KT. Considerations in the early stage of designing the unit modular building. Korean Journal of Construction Engineering and Management. 2012 Nov; 13(6):133-42. https://doi.org/10.6106/KJCEM.2012.13.6.133
DOI
|
10 |
Lee KB, Kim KR, Shin DW, Cha HS. A proposal for optimizing unit modular system process to improve efficiency in off-site manufacture, transportation and on-site installation. Korean Journal of Construction Engineering and Management. 2011 Nov;12(6):14-21. https://doi.org/10.6106/KJCEM.2011.12.6.14
DOI
|
11 |
Public Procurement Service. Basic guidelines of the facility business BIM Application v1.31 [Internet]. Korea: Public Procurement Service; 2016 Apr 6. Available from: http://www.pps.go.kr/bbs/selectBoard.do?boardSeqNo=2687&boardId=PPS089 (accessed on 15 April 2019).
|
12 |
Olearczyk J, Al-Hussein M, Bouferguene A, Telyas A. Virtual construction automation for modular assembly operations. In Proceedings of the Construction Research Congress; 2009 Apr 5-7; Seattle(WA): ASCE;2009. p. 406-15. https://doi.org/10.1061/41020(339)42
|
13 |
Bryde D, Broquetas M, Volm JM. The project benefits of building information modelling (BIM). International Journal of Project Management, 2013 Oct;31(7):971-80. https://doi.org/10.1016/j.ijproman.2012.12.001
DOI
|
14 |
Computer Integrated Construction Research Program. BIM Planning Guide for Facility Owners. 2nd rev. ed. Pennsylvania: The Pennsylvania State University; 2013. 69 p.
|
15 |
Field, A. Discovering statistics using SPSS. 3rd ed. London: Sage; 2009. 854 p.
|
16 |
Jun KH, Yun SH. Development construction object library for BIM based building construction planning. Journal of the Architectural Institute of Korea Structure and Construction. 2011 Sep;27(9):143-51.
|
17 |
Lee JW, Cho KM, Kim TH. Identifying construction engineering tasks at the design phase for enhancing constructability in high-rise building construction-focused on temporary work. Journal of the Architectural Institute of Korea Structure and Construction. 2017 Oct;17(5):453-63. https://doi.org/10.5345/JKIBC.2017.17.5.453
|