• 제목/요약/키워드: Installation schedule

검색결과 61건 처리시간 0.031초

An Overview of Seabed Storage Methods for Pipelines and Other Oil and Gas Equipment

  • Fatah, M.C.;Mills, A.;Darwin, A.;Selman, C.
    • Corrosion Science and Technology
    • /
    • 제16권2호
    • /
    • pp.76-84
    • /
    • 2017
  • In the construction of subsea oil and gas developments, it is increasingly common that subsea oil and gas equipment will be installed in subsea well before final hookup and production. Installation of wellheads, subsea hardware, pipelines, and surface facilities (platforms, FPSO, FLNG, connected terminals, or gas plants) are increasingly driven by independent cost and vessel availability schedules; this gives rise to requirements that the subsea facilities must be stored in the seabed for a specific time. In addition, schedule delays, particularly in the installation or startup of the connected platform, FPSO, FLNG, or onshore plant may cause unexpected extensions of the intended storage period. Currently, there are two methods commonly used for storage subsea facilities in the seabed: dry parking and wet parking. Each method has its own risks, challenges, and implications for the facility life and its integrity. The corrosion management and preservation method selection is a crucial factor to be considered in choosing the appropriate storage method and achieving a successful seabed storage. An overview of those factors is presented, along with a discussion on the internal corrosion threats and assessments.

Development of Multimedia Contents System for Passenger in Train (차량 내 멀티미디어콘텐츠 시스템 구현에 관한 연구)

  • Chang, Duk-Jin;Kang, Song-Hee;Song, Dahl-Ho
    • Proceedings of the KSR Conference
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.1563-1571
    • /
    • 2011
  • In the commercial trains, there are monitors hung on the ceiling which simply display broadcasted contents so a passenger in a cabin has only one choice of passively watching them or not. To lead the application of IT in railway, keep a passenger from tedious journey, or help a passenger having a productive time, an MCS(Multimedia Contents System) was analyzed, designed, and implemented. A passenger can select and use a content from a smart terminal that is attached at the passenger's seat. A smart terminal is one that has its own memory and processor to handle informations and interact with a user. In this paper, the contents, such as train schedule, transfer information, traveling information, e-book, TV, music, and game, that the MCS can provide were introduced. To validate the applicability of the MCS on a next generation high-speed train, a testing environment will be set on a pre-production car and tested. The successful installation of the MCS will boost up the competitive power of the next generation train in the world market.

  • PDF

How to Efficiently Implement Modernization Projects of process Control Systems (플랜트 계측제어 시스템의 개선과 프로젝트의 효율적인 수행)

  • 최기원
    • Journal of the Korean Professional Engineers Association
    • /
    • 제33권4호
    • /
    • pp.44-47
    • /
    • 2000
  • Recently number of reinstrumentation projects in the process plants has grown to meet the needs to modernize or upgrade the exsisting control systems in a bid to boost productivity and quality. Design, installation and start-up of these process automation systems can be successful and trouble-free only if decision points are addressed properly. The critical decision points are encountered from tile design through the start-up phases of implementing a modernization project and discussed extensively here on a practical basis. Key points are ;to assign a project manager out of the plant instrument engineers for him to organize and lead a project team. ;to follow three critical steps in designing and implementing. :to think ahead of the critical steps and to induce a positive cooperation from all level of participants in the effort to prevent possible schedule delays.

  • PDF

The Plan to Improve Highly Integrated Total Energy System (전력수급 종합시스템 운용현황 및 개선방안)

  • Park, S.W.;Yoon, Y.B.
    • Proceedings of the KIEE Conference
    • /
    • 대한전기학회 2001년도 춘계학술대회 논문집 전력기술부문
    • /
    • pp.326-329
    • /
    • 2001
  • The main purpose of HITES(Highly Integrated Total Energy System) is to build and develop an integrated energy system for power system operational planning and analysis which consists of load forecast, economic generation schedule, stability analysis and relational database system. The HITES can be utilized to supply a stable electric power and operate KEPCO's power system facilities economically. This system was put into operation in 1999. This paper describes the present condition for operation of HITES and proposes the plan to improve this system after installation.

  • PDF

Appliance of Slab tracks on the Prestressed Concrete Bridges (슬래브궤도의 콘크리트교량 적용성 검토)

  • Kim, Nam-Hoon;Lim, Young-Su;Shin, Yong-Joon
    • Proceedings of the KSR Conference
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1037-1043
    • /
    • 2007
  • The railroad systems with the ballast tracks have been widely used for a long time. But recently, the use of the slab track is being increased gradually with a technical developments. So, this paper deals with the appliance of the slab tracks on the railroad bridges. Firstly, review the design criteria of the railroad bridges related to the slab tracks for the stability and serviceability, based on DIN and EURO code. Then, perform the analysis of the railroad prestressed concrete bridges, and check whether the results of the analysis satisfy the design criteria. Finally, find the construction condition of bridges that all the design criteria are satisfied. As a result, to maintain the stability and serviceability of the bridges, bridges must have some restrictions, including a time of installation of the slab tracks. So, the construction schedule for the erection of the bridges will be carefully considered in case of the concrete railroad bridges with the slab tracks.

  • PDF

A Dynamic Inventory Scheduling Method in Multi-Echelon Distribution Systems (다단계분배시스템에서의 동적 발주계획 수립방안)

  • Yoo, Yeong-Joon;Rhee, Jong-Tae
    • IE interfaces
    • /
    • 제11권2호
    • /
    • pp.13-24
    • /
    • 1998
  • A distribution system is composed of multiple levels from a producer to customers, and it's objective is to supply customers with goods timely with a prescribed level of quality at a minimum cost. For the installation and operation of multi-echelon distribution system, DRP(Distribution Resource Planning) is widely used. However, because of the characteristic difference of material flow dynamic of each distribution center, it is almost impossible to get the optimal distribution scheduling. In this paper, an improved DRP method to schedule multi-echelon distribution network is proposed so that the lot-size and order point is dynamically obtained to meet the change of demand rate and timing. The experiment is done with various demand pattern, forecast errors of demand and lead times of central distribution center. The proposed method is compared with traditional statistical approach.

  • PDF

A Correlation Analysis of Influence Factors of Nonconformity in Construction Projects (건설프로젝트의 품질결함의 발생요인간 상관분석)

  • Chi, Sungjoon;Cha, Yongwoon;Han, Sangwon
    • Korean Journal of Construction Engineering and Management
    • /
    • 제16권2호
    • /
    • pp.21-28
    • /
    • 2015
  • Construction defects are major components that result in cost overruns and schedule delays in construction projects. There have been extensive research efforts to investigate the cause of defects. However, little effort has been devoted to analyze correlation among various reasons of construction defects while a defect is not usually an outcome of a single cause, but rather occurs when several interrelated causes combine. Based on this recognition, this paper analyzes 831 nonconformity reports collected from 30 construction projects in Korea from 2011 to 2014. The correlation analysis revealed that a significant portion of construction defects occurred in the procurement and construction phase and as the pattern of function defect and installation defect. Triggered by human error, defective material and faulty method, these defects are treated by conccession, repair, rework that can significantly lower the cost and schedule performance. This paper is significant in terms of providing a theoretical basis for analyzing correlation among various reasons of construction defects and quantitative measures for establishing effective defect prevention strategies.

Identifying Factors Affecting Labor Productivity for Residential Fire Protection System Installation (공동주택 소방설비공사의 노무생산성 영향요인 분석)

  • Oh, Jae-Hoon;Kim, Dae Young;Kim, Jae Sik;Huh, Young-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • 제17권4호
    • /
    • pp.377-384
    • /
    • 2017
  • It is generally acknowledged that subcontractors mostly allocate their resources to project relying on their previous experiences, instead of data-based judgement. Installing residential fire protection systems, typically performed by subcontractors, is labor-intensive job and its schedule is frequently changed as the contractor master schedule is often revised. Nevertheless, it is still important for subcontractors to make much effort to improve labor productivity through a thorough planning for scheduling and resource allocation. The purpose of this study is to identify significant factors that affect labor productivity for residential fire protection system installation. For this purpose, 50 potential factors that may affect productivity were identified based on literature reviews and expert interviews. These factors were further explored using correlation analysis and ANOVA test. The results showed that the labor productivity is significant impacted by various project characteristics.

Factors Affecting Patient Waiting Times at the Outpatient Pharmacy Department in a Tertiary Care Hospital (3차진료기관 외래약국 투약대기시간에 영향을 주는 요인)

  • Park, Hayoung;Han, Ok-Youn;La, Hyun-Oh
    • Quality Improvement in Health Care
    • /
    • 제1권2호
    • /
    • pp.60-72
    • /
    • 1994
  • Background: The number of outpatients visiting large university teaching hospitals has increased drastically with the introduction of a nationwide health care insurance in 1989 and the improvement of the socio-economic status of the population. This resulted in long waiting times for services, particularly prescribed drugs, which have been patients' chief complaints. Hospitals have tried to solve the problem with limited success because their approach lacked comprehensive research. The objective of this study is to investigate associations between waiting times and variables defining a total work system. Methods: Data for the outpatient pharmacy department in a tertiary care university teaching hospital located in Seoul was analyzed to achieve the study objective. Associations of pharmacy system variables -- work load, work force, pharmacist work schedule, machine problems, and inventory control -- with mean and 99th percentile of waiting times were examined by the hierarchical stepwise regression method. Day was a unit of the analyses. Results: The regression models explained 65.8% of variance in the mean waiting time and 61.34% in the 99th percentile of waiting times. The break-down of the printer for drug envelops, Automatic Tablet Counters (ATCs), and main computer system lasted longer than 30 minutes increased the mean for 7.7 minutes, 4.5 minutes, and 7.0 minutes, respectively, and the 99th percentile for 14.8 minutes, 9.0 minutes, and 15.7 minutes, respectively. Concerning the work force, study results showed that there were significant differences in the productivity of pharmacists with work experience more than three years, one to three years, and less than one year, and showed that peak time aid work by pharmacists at job assignments other than the outpatient pharmacy, part-time pharmacists, and the installation of ATCs were effective in reducing waiting times, Finally, study findings indicated that the operational policy of work assignment and rotation schedule, supply and inventory of drugs at work tables, and readiness for undisrupted work during the work hours could have a significant effect on waiting times. Conclusion: The study results indicated that efforts to reduce waiting times for prescribed drugs should be geared toward every components of the pharmacy work system ranging from work schedule of pharmacists and supply of dugs at work tables. These findings should provide hospital managers with right directions in battling the problem.

  • PDF

The Construction Work Completion of the Fuel Test Loop (핵연료 노내조사시험설비 설치공사 완료)

  • Park, Kook-Nam;Lee, Chung-Young;Chi, Dae-Young;Park, Su-Ki;Shim, Bong-Sik;Ahn, Sung-Ho;Kim, Hark-Rho;Lee, Jong-Min
    • Proceedings of the KSME Conference
    • /
    • 대한기계학회 2007년도 춘계학술대회A
    • /
    • pp.291-295
    • /
    • 2007
  • FTL(Fuel Test Loop) is a facility that confirms performance of nuclear fuel at a similar irradiation condition with that of nuclear power plant. FTL consists of In-Pile Test Section (IPS) and Out-Pile System (OPS). FTL construction work began on August, 2006 and ended on March, 2007. During Construction, ensuring the worker's safety was the top priority and installation of the FTL without hampering the integrity of the HANARO was the next one. Task Force Team was organized to do a construction systematically and the communication between members of the task force team was done through the CoP(community of Practice) notice board provided by the Institute. The installation works were done successfully overcoming the difficulties such as on the limited space, on the radiation hazard inside the reactor pool, and finally on the shortening of the shut down period of the HANARO. Without a sweet of the workers of the participating company of HEC(Hyundae Engineering Co, Ltd), HDEC(HyunDai Engineering & Construction Co. Ltd), equipment manufacturer, and the task force team, it is not possible to install the FTL facility within the planned shutdown period. The Commissioning of the FTL is on due to check the function and the performance of the equipment and the overall system as well. The FTL shall start operation with high burn up test fuels in early 2008 if the commissioning and licensing progress on schedule.

  • PDF