• 제목/요약/키워드: Installation depth

검색결과 359건 처리시간 0.038초

End shape and rotation effect on steel pipe pile installation effort and bearing resistance

  • Saleem, Muhammad A.;Malik, Adnan A.;Kuwano, Jiro
    • Geomechanics and Engineering
    • /
    • 제23권6호
    • /
    • pp.523-533
    • /
    • 2020
  • The current study focuses on the effect of the end shape of steel pipe piles on installation effort and bearing resistance using the pressing method of installation under dense ground conditions. The effect of pile rotation on the installation effort and bearing resistance is also investigated. The model steel piles with a flat end, cone end and cutting-edge end were used in this study. The test results indicated that cone end pile with the pressing method of installation required the least installation effort (load) and showed higher ultimate resistance than flat and cutting-edge end piles. However, pressing and rotation during cutting-edge end pile installation considerably reduces the installation effort (load and torque) if pile penetration in one rotation equal to the cutting-edge depth. Inclusion of rotation during pile installation reduces the ultimate bearing resistance. However, if penetration of the cutting-edge end pile equal to the cutting-edge depth in one rotation, the reduction in ultimate resistance can be minimized. In comparing the cone and cutting-edge end piles installed with pressing and rotation, the least installation effort is observed in the cutting-edge end pile installed with penetration rate equal to the cutting-edge depth per rotation.

Optimum PVD installation depth for two-way drainage deposit

  • Chai, J.C.;Miura, N.;Kirekawa, T.;Hino, T.
    • Geomechanics and Engineering
    • /
    • 제1권3호
    • /
    • pp.179-191
    • /
    • 2009
  • For a two-way drainage deposit under a surcharge load, it is possible to leave a layer adjacent to the bottom drainage boundary without prefabricated vertical drain (PVD) improvement and achieve approximately the same degree of consolidation as a fully penetrated case. This depth is designated as an optimum PVD installation depth. Further, for a two-way drainage deposit under vacuum pressure, if the PVDs are fully penetrated through the deposit, the vacuum pressure will leak through the bottom drainage boundary. In this case, the PVDs have to be partially penetrated, and there is an optimum installation depth. The equations for calculating these optimum installation depths are presented, and the usefulness of the equations is studied by using finite element analysis as well as laboratory model test results.

콘크리트 전주의 근입깊이 증대를 위한 보강장치의 실험적 성능평가 (An Experimental study on evaluation of reinforcing installation increasing the penetration depth about upset of concrete pole)

  • 신동근;윤기용;이승현;이규세;강영종
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2008년도 정기총회 및 학술발표대회
    • /
    • pp.71-74
    • /
    • 2008
  • For reinforcing the overturn of concrete pole instituted in slope ground and weak ground, in this paper, develop the reinforcing installation. The installation increase penetration depth and effect of increasing the penetration depth is verified by experimental paper of Lim, jong suk(2004). In this research, through the experiment of bending test using the reinforcing installation, evaluate the performance. In the result of experiment, concrete pole behave elastically in design load and all sample are safe up to failure load.

  • PDF

시험선로 결빙방지를 위한 융설시스템에 관한 연구 (A Study on Snow Melting System for the Anti-freezing Testing Road)

  • 한규일;이안호;조동현
    • 동력기계공학회지
    • /
    • 제10권1호
    • /
    • pp.34-40
    • /
    • 2006
  • The snow melting system by electric heating wires which is adopted in this study is a part of road facilities to keep surface temperature of the road higher than freezing point of water for melting the snow accumulated on it. The system is designed to increase traffic safety and capacity. The electric heating wires are buried under paved road at a certain depth and operated automatically and manually. Design theory, amount of heating, and installation standard vary according to economic situation, weather condition, and installation place where the system applies. It is tried to figure out that the appropriate range of required heat capacity and installation depth and intervals for solving snowdrifts and freezing problems with the minimum electric power consumption. The most important factors to design the system are calculation of heating capacity depending on weather condition and depth and interval of the electric heating wires depending on air condition respectively. The study were performed under the range of the air temperatures($-2^{\circ}C,\;-5^{\circ}C,\;-8^{\circ}C$), the intervals of the electric heating wires(70mm, 100mm, 125mm), and the installation depths(50mm, 70mm, 100mm). The ready made commercial program package was used to verify the experimental results.

  • PDF

설치수심에 따른 어류탐지용 음향 텔레메트리 수신기의 탐지성능분석 (Analysis on the detection ability of acoustic telemetry receiver for fish detection by installation depth)

  • 황보규;신현옥
    • 한국수산과학회지
    • /
    • 제43권1호
    • /
    • pp.83-88
    • /
    • 2010
  • Acoustic telemetry is a useful method to investigate fish behavior and is widely used to obtain biological information. In this study, the detection ability of a mooring-type acoustic telemetry system and the seasonal changes were studied for survey design and data analysis. The system detection range was examined with an underwater noise model, and seasonal changes were estimated with a ray-tracing program and underwater temperature profile data. The field experiment was conducted with two sets of pingers and six receivers to estimate the difference in detection rate by installation depth and to compare the model estimate. Results indicated that the long-range detection ability of the acoustic telemetry system was significantly affected by underwater temperature. The detection rate rapidly decreased near the sea surface or bottom despite that the near-range Signal to noise ratio was sufficient.

합류하천에서 토구설치에 따른 흐름변화 (Variation of Flow Properties by Installing Sewerage Outlet at Channel Junction)

  • 최계운;조상욱;김영규;한현준
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2006년도 학술발표회 논문집
    • /
    • pp.1328-1332
    • /
    • 2006
  • As the city is developed, Sewerage outlet is installed for the discharge of rainfall special at new town or modified the existed sewerage network. But the sewerage outlet is influenced to the cannel flow. In this paper, for analyzing variation of flow properties by installing sewerage outlet, it was experimented a with $120^{\circ}$ channel junction. The water depth is rapidly increasing at the just before sewerage installed position, but the velocity is represented increasing at the just after sewerage installed position. In addition, the biggest increment of water depth and velocity is represented $3.0m^3/hr{\sim}4.0.m^3/hr$. At the position of the sewerage outlet installation, separate install at up and downstream is rather than only one position at up or down stream. If it was not install both installation, the upstream installation is better than downstream installation.

  • PDF

동영상 정보의 계측정보 전송을 위한 비선형 스테레오 카메라의 오차 보정 (Depth error calibration of maladjusted stereo cameras for translation of instrumented image information in dynamic objects)

  • 김종만;김영민;황종선;임병현
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2003년도 춘계학술대회 논문집 기술교육전문연구회
    • /
    • pp.109-114
    • /
    • 2003
  • Depth error correction effect for maladjusted stereo cameras with calibrated pixel distance parameter is presented. The camera calibration is a necessary procedure for stereo vision-based depth computation. Intra and extra parameters should be obtain to determine the relation between image and world coordination through experiment. One difficulty is in camera alignment for parallel installation: placing two CCD arrays in a plane. No effective methods for such alignment have been presented before. Some amount of depth error caused from such non-parallel installation of cameras is inevitable. If the pixel distance parameter which is one of intra parameter is calibrated with known points, such error can be compensated in some amount. Such error compensation effect with the calibrated pixel distance parameter is demonstrated with various experimental results.

  • PDF

Numerical and Experimental Studies of Dual Subsea Pipelines in Trench

  • Jo, Chul H.;Shin, Young S.;Min, Kyoung H.
    • Journal of Ship and Ocean Technology
    • /
    • 제6권2호
    • /
    • pp.12-22
    • /
    • 2002
  • Offshore pipelines play an important role in the transportation of gas, oil, water and oil products. It is common to have a group of pipelines in the oil and gas field. To reduce the installation cost and time, dual pipelines are designed. There are great advantages in the installation of dual pipelines over two separate single lines. It can greatly reduce the cost for trench, back-filling and installation. However the installation of dual pipelines often requires technical challenges. Pipelines should be placed to be stable against external loadings during installation and design life period. Dual pipelines in trench can reduce the influence of external forces. To investigate the flow patterns and forces as trench depth and slope changes, number of experiments are conducted with PIV(Particle Image Velocimetry) equipment in a Circulating Water Channel. Numerical approaches to simulate experimental conditions are also made to compare with experimental results. The velocity fields around dual pipelines in trench are investigated and analysed. Comparison of both results show similar patterns of flow around pipelines. It is proved that the trench depth contributes significantly on hydrodynamic stability. The trench slope also affects the pipeline stability. The results can be applied in the stability design of dual pipelines in trench section. The complex flow patterns can be effectively linked in the understanding of fluid motions around multi-circular bodies in trench.

대심도 복층터널 화재연기 확산지연장치 설치간격 및 차폐율에 따른 화재연기 지연효과 연구 (A Study on the Delay Effect of Smoke Diffusion by the Installation Intervals and the Blockage Ratio of the Fire Smoke Diffusion Delay Device in a Great Depth Underground Double-Deck Tunnel)

  • 양용원;한재희;이윤택;문정주;신태균
    • 한국자원공학회지
    • /
    • 제55권6호
    • /
    • pp.596-603
    • /
    • 2018
  • 국내 도심지의 도로는 차량수요 증가 및 부도심의 발달로 교통정체가 빈번히 발생되고 있다. 이를 해결하기 위한 방안으로 대심도 복층터널 시공을 위한 설계가 계획되고 있지만 주로 소형차전용으로써 터널높이가 낮고 단면이 작아 화재발생 시 인명피해가 발생될 가능성이 높다. 따라서 본 연구에서는 대심도 복층터널의 화재 시 인명피해 발생 최소화 방안으로 화재연기 확산지연장치 개발하였으며, 확산지연장치의 효과를 극대화할 수 있는 최적 설치간격 및 차폐율을 찾기 위해 3차원 전산수치해석(CFD)을 이용하여 Case Study를 수행하였다. 수행결과 확산지연장치의 설치간격이 짧을수록 지연효과가 높아졌지만 일정거리 이상에서는 효율변화가 미비한 경향이 발견되었고, 차폐율이 클수록 화재연기 지연효과가 높아지는 경향이 나타났지만, 차폐율이 작은 경우에는 설치간격에 따른 화재연기의 지연효과의 차이는 미소한 것으로 분석되었다.