• Title/Summary/Keyword: Installation Test

Search Result 1,486, Processing Time 0.034 seconds

Characteristics of Driving Efficiency and Bearing Capacity for Long Steel Pipe Pile Method without Welding (무용접 장대강관말뚝 공법의 항타 및 지지력 특성)

  • 백규호
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.1
    • /
    • pp.235-241
    • /
    • 2000
  • The existing methods for installation of long steel pipe pile have some uneconomical problems such as increase of installation cost and period due to the welding of two piles and removal of soil plug, and decrease of driving efficiency due to the increase of driving resistance resulting from time effect during the welding of piles and removal of soil plug, etc. Thus, in this study, new installation method for long steel pipe pile is suggested to solve the existing problems, and calibration chamber tests were performed to investigate both driving and economical efficiency for the suggested method. The test results showed that the new method increased bearing capacity, and decreased the installation cost and period for long steel pipe piles compared with existing methods.

  • PDF

Installation of Micro-piles Appropriate to Soil Conditions (지반조건에 따른 마이크로파일 설치방법에 관한 연구)

  • Hwang, Tae-Hyun;Mun, Kyeong-Ryeon;Shin, Yong-Suk;Kwon, Oh-Yeob
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.4
    • /
    • pp.55-65
    • /
    • 2012
  • This study performs model test to propose the installation method of micro-pile appropriate to various soil conditions such as sand or silt soil. As a result, the crossed installation method (${\theta}$ < $0^{\circ}$) of micro-pile is effective in resisting a compression displacement of soil in the case of silt exhibiting the punching shear failure. And the inclined installation method (${\theta}$ > $0^{\circ}$ or ${\theta}$ < $0^{\circ}$) of micro-pile is effective in resisting a lateral displacement of soil in the case of sand to exhibiting the general or local shear failure.

Aging Characteristics of Polymer Lighting Arrester by Multi-Stress Accelerated Aging Test (복합가속열화시험에 의한 폴리머 피뢰기의 경년특성)

  • Song, Hyun-Seok;Lee, Jae-Bong;Jang, Sang-Ok;Han, Yong-Huei;Oh, Jae-Hyoung
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.05a
    • /
    • pp.86-89
    • /
    • 2004
  • Recently polymer arresters are being used widely but we don't have appropriate long term characteristics test methods. Therefore we need to develop special test facility to evaluate long term reliability of polymer arresters. It's polymeric housing can be degraded by environmental stress and the interface between housing and inner module can be affected by moisture absorption. This moisture absorption can cause leakage current and tracking in the interface. We developed multi stress accelerated ageing test facility to simulate field conditions including UV, temperature, humidity, voltage, salt fog and rain. In addition, we carried out field exposure test at the outdoor test yard and characteristics analysis of field operated specimens to evaluate accelerating factor of this accelerated aging test.

  • PDF

Analysis of Mechanical Properties and Stress Crack Behavior of HOPE Geomembranes by Laboratory Installation Damage Test (실내 시공시 손상시험에 의한 HDPE 지오멤브레인의 기계적 특성 및 응력균열거동 해석)

  • Khan, Belas Ahmed;Park, Ju-Hee;Kim, Sung-Hee;Chang, Yong-Chai;Oh, Tae-Hwan;Lyoo, Won-Seok;Jeon, Han-Yong
    • Polymer(Korea)
    • /
    • v.35 no.3
    • /
    • pp.203-209
    • /
    • 2011
  • Two smooth and textured surfaced HDPE geomembranes (GMs) were cut into dumbbell shape and notched where depth of the notch produced a ligament thickness of 10% to 90% of the nominal thickness with the specimen at 10% interval. A series of laboratory simulation test for installation damage were carried out at different loading cycles on HDPE GMs in accordance with ISO 10722 test method and the effect of number of loading cycle on installation damage was compared. It was found that yield stress and elongation at yield point decreased gradually as the notch depth was increased. Both installation damaged and notched, GMs were used to understand stress crack behavior and this behavior was observed through NCTL test at $50{\pm}1^{\circ}C$ at different yield stresses immerging in pH 4 and pH 12 buffer solutions. Over 35% tensile load, GMs became vulnerable to stress cracking. Both damaged and notched GMs showed the same trend. Especially, notched GMs showed less strength than installation damaged GMs at every stress cracking test condition.

Characteristics of Driving Efficiency and Bearing Capacity for Non-welded Long Steel Pipe Pile Method (무용접 장대강관말뚝 공법의 항타 및 지지력 특성)

  • 백규호;이상일;박진석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.381-388
    • /
    • 1999
  • The existing methods for installation of long steel pipe pile have some uneconomical problems such as increase of installation cost and period due to the welding of two piles and removal of soil plug, and decrease of driving efficiency due to the increase of driving resistance by time effect during the welding of piles and removal of soil plug, etc. Thus, in this study, new installation method for long steel pipe pile is suggested to work out the existing problems, and calibration chamber tests are peformed to investigate both driving and economical efficiency for the suggested method. The test results showed that the new installation method has increase bearing capacity as well as reduce installation cost and period for long steel pipe piles as compared with existing methods.

  • PDF

KO AC/DC Converter System Installation Status and Commissioning Plan at ITER Site (이터 초전도자석 전원공급장치 현장 설치현황 및 시운전 계획)

  • Song, Inho;Oh, Jong-Seok
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.27 no.5
    • /
    • pp.397-401
    • /
    • 2022
  • The construction of the ITER tokamak machine is ongoing at a 77% process rate to achieve the first plasma in 2025. The 18 sets of power supply systems comprising 400 MVA thyristor AC/DC converters for the superconducting magnets supplied by Korea (KO) are being installed with other systems, such as PF converters (China), DC busbars (Russia), and cooling water systems (India), in two buildings (Europe). The system interfaces have been defined during the design stage, and the systems have been manufactured. However, during the on-site installation work, several installation and integration issues emerged due to the manufacturing tolerance and design mistakes. To continue the installation and testing, the engineers of each system resolved the interface issues, planned the commissioning, and integrated the test plan. This paper describes the on-site installation status and issues and the commissioning plan of KO AC/DC converters.

A Study on the Improvement of Test and Diagnosis Device for Audio Frequency Track Circuit (가청주파수 궤도회로의 진단 및 시험 장비 개선에 대한 연구)

  • Kang, Jang-Kyu;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.12
    • /
    • pp.147-155
    • /
    • 2010
  • We studied on performance improvement of TTM(TI21 Test Meter) that is test and diagnosis devices for jointless audio frequency track circuit on Korean electric railway TI21 standard. Upgraded devices is AD-TTM(Advanced TI21 Test Meter). This can measure alternating frequency USB(Upper signal band) and LSB(Lower signal band). In the audio frequency track circuit, ${\pm}17[Hz]$ of nominal frequency are demodulated and supplied to track relay through AND gate. It is important that measurement function which is error between USB and LSB. Need of AD-TTM will stand out in the electric railway system because this is simple and accurate rather than the former device.

The field-test of Power Quality Meter and Power Management System in order to verify the performance (PQM 및 PQMS 성능검증을 위한 실증시험)

  • Choi, Sun-Kyu;Song, Il-Keun;Kwon, Tae-Ho;Han, Jae-Wook
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2005.05a
    • /
    • pp.235-239
    • /
    • 2005
  • This paper gives a field-test method and result of PQM(Power Quality Meter) and PQMS(Power Quality Management System). The field-test was carried out as our own method. So, the test method has several kinds of improvement in this paper because it is first time to try the field-test of the equipment. However, we expect that the test result of PQM & PQMS has been used as a reference data which makes a scheme of evaluating performance of the equipment that has been used or is developed.

  • PDF

Parameters Estimation Characteristics of Five-Phase Squirrel-Cage Induction Motor within Over Current Load (과전류 부하에서 5상 농형 유도전동기의 정수 특성)

  • Kim, Min-Huei
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.7
    • /
    • pp.38-46
    • /
    • 2015
  • This paper propose a variable parameter estimations for variable over current load of five-phase squirrel-cage induction motor(IM) to servo control system. In order to high performance control of AC motor using a field oriented control(FOC) and direct torque control(DTC) algorithm, there are required precise motor parameters for slip calculation, flux observer, controller gain, torque command of current components, rotor position, speed estimation, and so on. We are suggest a analyzed estimation results of the motor parameters that developing five-phase squirrel-cage IM have a stator of concentrated winding for experimental within variable over current load at rated input frequency. There are results of stator winding measurement, no-load test, locked-rotor test, variable over current load test, and estimated parameters of equivalent circuits using manufactured experimental apparatus by IEEE Standard Test Procedure for Polyphase Induction Motors and Generators 112-2004.

The trial installation test of PSS to Power Plant using Real Time Digital Simulator (RTDS를 이용한 PSS 현장 설치 모의 시험)

  • Hur, Jin;Kim, Dong-Joon;Moon, Young-Hwan;Shin, Jeong-Hoon;Kim, Tae-Kyun
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.59-62
    • /
    • 2002
  • Before a developed digital Power System Stabilizer(PSS) is installed to real power system, an efficient trial test for installing PSS is needed. In this paper, the performance of developed digital PSS for a single hydro-turbine generator and infinite bus system has been investigated using Real Time Digital Simulator(RTDS) in order to install PSS to real power system practically. The test system was composed of RTDS, three phase voltage/current amplifier and the PSS and the test scheme provided a very efficient way to verify the design and control performance of a PSS to be applied to real power system. The trial installation test through AVR 3% step test and three fault analysis may be guaranteed to install PSS to real power system.

  • PDF